Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St.
Adams St along Fountain Dr., up Crescent Rd. to 17th St.
April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
Flock Safety Camera Installation Along E Kirkwood Ave and N Walnut St
Intersections of E Kirkwood Ave/ S Dunn St, E Kirkwood Ave/ S Grant St, W Kirkwood Ave/ N Walnut St, and N Walnut St/E 7th St
October 23, 2024 to February 23, 2025
Flock Safety is working with the Bloomington Police Department to install live video feed cameras in the right-of-way to aid in BPD investigations. The cameras will be placed in 4 locations along E Kirkwood Ave and N Walnut St. The installation will require a lane closure at each location and is expected to take 5 days to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53357133571649 39.1686589718461,-86.53357444106325 39.1685795228299,-86.53346575392663 39.1685795228299),LINESTRING(-86.52827554433638 39.16662837741421,-86.52827554433638 39.16655735276254,-86.52846807583555 39.166564575611716),LINESTRING(-86.52991059769879 39.16653703479517,-86.5298158846226 39.1665334233692,-86.52981743729597 39.16644554528119),LINESTRING(-86.5335836883135 39.166679163000026,-86.5335836883135 39.16660452697732,-86.53343773701573 39.166608138399596))
AT&T Fiber Installation at the Intersection of S Madison St & W Smith Ave
W Smith Ave & S Madison St
October 24, 2024 to January 31, 2025
AT&T will be installing underground fiber at the intersection of S Madison St and W Smith Ave between October 14, 2024 and January 2025. When work begins the installation will require the temporary closure of W Smith Ave during day time hours and will not last more than 3 days once started.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53753840412124 39.16287163325691,-86.53741892384477 39.16286931726947,-86.5372392830538 39.1628658351396),LINESTRING(-86.53741127766757 39.162987595502756,-86.53741875569426 39.162874532315385))
Duke Energy Pole Removal
1798 S Rogers Street
November 20, 2024 to February 18, 2025
Single day lane closure adjacent to 1798 S Rogers Street to remove two temporary poles MNI-13983 and MNI-11785 and install a new anchor. Closure will occur in the date range of 11/20/24 to 02/18/2025.
Engineering
LINESTRING(-86.5388618439407 39.147853213148636,-86.5388343177871 39.148829638985575)
Duke N Fee Ln Lane Closure & Pole Installation
825 N Fee Lane
December 2, 2024 to March 15, 2025
Duke Energy will be installing new pole off of N Fee Ln. 1-2 day Lane restrictions only along N Fee Lane adjacent to 825 N Fee Lane in the date range of 12/2/24-3/15/25.
Engineering
LINESTRING(-86.51889218280641 39.17404346449811,-86.51891578629485 39.17426054630877)
AT&T Fiber Installation along S Woodscrest Dr and E 3rd St
S Woodscrest at E 2nd St intersection heading north towards 410 S Woodscrest; E 3rd St at S College Mall Rd intersection
December 16, 2024 to February 28, 2025
AT&T will be installing fiber along S Woodscrest Dr and E 3rd St between 12/16/2024 and 2/28/2025 for 2-3 days max once begun. The work will involve a short sidewalk closure and temporary lane closures for equipment
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5000792424787 39.16421410144247,-86.49890808733562 39.16422524306569,-86.49871768481235 39.16416396411611,-86.49837998977111 39.16416396411611,-86.49830095476145 39.16380464556485),LINESTRING(-86.50295732782295 39.160970161846706,-86.50245507079751 39.16096242467813,-86.5024650494139 39.1618754046973,-86.50246837561937 39.16244278743983))
Fiber Relocation for Broadview Learning Center at 705 W Coolidge Dr
705 W Coolidge Dr to W Graham Dr to S Rogers St and south to just past W Ralston Dr.
December 16, 2024 to May 16, 2025
Smithville has scheduled fiber relocation along W Graham Dr, S Rogers St, and just east of S Brown Ave for the Broadview Learning Center. The work is planned between 12/16/2024 and 5/16/2025, but will only take about a week to complete once work begins in the area. Temporary lane closures are expected and a sidewalk closure on S Rogers St for no more than 3 days is expected.
Engineering
LINESTRING(-86.54165863152343 39.14048866259188,-86.54160294424052 39.14016276545618,-86.54160800672078 39.13988005828523,-86.53865151824567 39.139805454814706,-86.53840547566134 39.137843542006095)
Utility Cabinet Install on east side of S Walnut St
S Walnut St just south of E Winslow Rd on the east side
December 16, 2024 to March 28, 2025
AT&T will be installing a utility cabinet on the east side of S Walnut St just south of E Winslow Rd that will take 2-3 days to install. The work is scheduled between 12/16/2024 and 3/28/2025. The work will primarily be on the road shoulder, but may include brief lane closures during the installation.
Engineering
LINESTRING(-86.53140196468983 39.134648252684315,-86.53139168876503 39.1347890677836,-86.53135058506582 39.134916598196554)
204 E 17th St Alley Paving
204 E 17th St
December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)
AT&T Fiber Installation along N Smith Rd
N Smith Rd between E Grandview Dr and E Morningside Dr, Morningside Dr to E Saratoga Dr
December 30, 2024 to March 28, 2025
AT&T will be installing fiber along N Smith Rd from E Morningside Dr and E Saratoga Dr between 12/30/2024 and 3/28/2025. The work will take 2-3 days once started and will only include a lane closure during that time period. The sidewalks will not be impacted.
Engineering
LINESTRING(-86.48127986784151 39.168652953912726,-86.48124060360924 39.16624806013084,-86.48099193013813 39.16624298642836,-86.48045531896362 39.16638504995993,-86.48019355741508 39.16600452199816)
Duke Energy Work
4000 N Kinser Pike
January 1, 2025 to January 31, 2025
WO # 47538323, 1-2 day lane closure for to replace overhead equipment on pole # 155-461.
External Project
LINESTRING(-86.54741228999647 39.21062850444568,-86.54743031227328 39.209586771065005)
Duke Energy Pole Replacement - W Tapp Rd and W Graham Dr
Near 1722 W Tapp RD and near 913 W Graham Dr
January 1, 2025 to April 30, 2025
WO# 40995283.
1-2 hour closure of the southern lane of W Graham Dr near S Broadview Dr for a pole replacement.
1-2 hour closure of the northern lane of W Tapp Rd near S Boardwalk Cir for a pole replacement.
Closures will occur in the date range of 01/01/2025 to 04/30/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55877613398205 39.13654860840089,-86.55780002275073 39.1365412720169),LINESTRING(-86.54365036332634 39.13994197229269,-86.54247186295382 39.13991791829332))
Lane and Sidewalk Closures for Duke Energy Work
E Hillside Dr
January 1, 2025 to March 31, 2025
WO# 42365068. Replacing 9 poles, Replacing overhead equipment on 36 poles, removing equipment from 1 pole, and installing equipment on 2 poles along B-Line Trail/S Walnut Street, E Hillside Drive/S Henderson Street, and S High Street in Bloomington, IN 47403
Permitted closures include:
- 1 day of lane and sidewalk closures along the south side of E Hillside Dr between S Henderson St and S High St.
- 1 day of lane and sidewalk closures along the east side of S High St between E Hillside Dr and E Southdowns Dr.
- 1 day of lane and sidewalk closures along the east side of S Henderson St between E Hillside Dr and E Thornton Dr.
Closures will occur in the date range of 01/01/2025 03/31/2025
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.50857144679036 39.150400530436286,-86.52699265985356 39.150509224305694),LINESTRING(-86.52699265985356 39.150509224305694,-86.53350015359871 39.15044711354375))
Duke Energy Overhead work and Pole Replacement
S Walnut St Pike
January 1, 2025 to March 31, 2025
Rolling lane closures and shoulder work along S Walnut St Pike between S Walnut St and E Winslow Rd to replace overhead equipment on six poles and replace two poles. Lane closures will occur over 3 days in the date range of 01/01/2025 to 03/31/2025.
Engineering
LINESTRING(-86.52980615723311 39.13724019435821,-86.52901702137609 39.1362388677575)
E Weymouth Ln Lift Station
E Weymouth Ln
January 1, 2025 to February 28, 2025
Road and sidewalk closure on E Weymouth Ln to install a lift station on behalf of the City of Bloomington Utilities. The closures will last approximately two months. Local access will be maintained for the closures, and a sidewalk will remain open on the street. Kokosing Industrial will provide advance notice to homeowners affected by the closures through door hangers. The closures will begin on January 1, 2025, and end on February 28, 2025
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.47448619867475 39.174443691933334,-86.47303366642517 39.17383204414776),LINESTRING(-86.47442650185764 39.17450735674015,-86.47300195409574 39.17391407058781))
Duke Energy Pole Maintenance and Lane Closure
2333 E 3rd ST
January 1, 2025 to March 31, 2025
1-2 day lane closure on the east bound lane of E 3rd St adjacent to 2420 E 3rd St occuring between 1/1/25 and 3/31/25. Duke Energy will be replacing overhead equipment on pole # 168-648. No overnight closure will occur.
Engineering
LINESTRING(-86.50515985143561 39.1642149742589,-86.50417888918273 39.16421732606571)
Duke Energy Pole Maintenance and Lane Closure
300 W 1st St
January 1, 2025 to March 31, 2025
Duke Energy Will be replacing overhead equipment on pole # 152-631. 1-2 day lane closure on S Morton St between W 1st St and W 2nd St occuring between 1/1/25 and 3/31/25. No overnight closure will occur.
Engineering
LINESTRING(-86.53629041294062 39.15972695157808,-86.53628327644239 39.16022912794409)
Duke - S High St Lane Closure
2000 E Wexley Rd
January 1, 2025 09:00 am to 14:30 pm March 31, 2025
WO# 46628237. Replacing overhead equipment on pole # MNI-6099. 1-2 day lane closure of S High St south of E Wexley Rd in the date range of 01/01/2025 to 03/31/2025. No overnight closure.
Engineering
LINESTRING(-86.50816896765443 39.13690697494957,-86.50817648644521 39.13735456822633)
Duke W Smith Ave Bike Lane Closure
350 S Walnut ST
January 1, 2025 to March 31, 2025
WO#46628241. Replacing overhead equipment on pole # 764-554. 1-2 day lane closure of the east bound bike lane on the south side of W Smith Ave between S College Ave and S Walnut St. Vehicle lane to remain open. No overnight closure.
Engineering
LINESTRING(-86.53367690841516 39.16284345646315,-86.53486691439286 39.16283897746581)
Duke Energy Pole Relocation
1020 N Monroe St
January 17, 2025 to January 31, 2025
Single-day closure of the eastern lane, sidewalk, and crosswalk adjacent to 1020 N Monroe St to remove one pole, install a new pole 25 ft south of the original pole, and replace overhead wire to the new pole. Work will occur in the date range of 01/17/2025-01/31/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54727264892446 39.175707021371636,-86.54727495253911 39.1762123983045),LINESTRING(-86.54719202241155 39.176239184966335,-86.5471943260262 39.17553737105686))
W Bloomfield Road Closure
West Bloomfield Road In front of Twin Lakes Recreation Center. From S Cory Lane to S Weimer Rod
January 24, 2025 20:30 pm to 08:00 am January 25, 2025
This road is closed for Water Main repairs.
Utilities
GEOMETRYCOLLECTION(POINT(-86.56168211283128 39.15597051087738),LINESTRING(-86.56431462554201 39.15424426501261,-86.56168211283128 39.15597051087738,-86.55970331133057 39.157107617952704))
Sanitary Replacement and Repair at 816 W Kirkwood Ave
816 W Kirkwood Ave
January 27, 2025 to January 31, 2025
Benjamin Franklin Plumbing is repairing and replacing the sanitary sewer lateral for the property of 816 W Kirkwood and will have a lane and sidewalk closure at the property for the work. The work is between 1/27/2025 and 1/31/2025.
Engineering
LINESTRING(-86.54297560045009 39.16667287053136,-86.54281737350554 39.16667287053136)
Street Repairs at 3rd & Bypass
E Third St & 45-46 Bypass/College Mall Rd
January 29, 2025 22:00 pm to 07:00 am January 30, 2025
Public Works Street division will work overnight to repair the road at 3rd & the bypass after a water main break. They will close the intersection from 10pm Wednesday 1/29/25 until 7am Thursday 1/30/25. Vehicles will only be able to turn right from all directions.
Street
LINESTRING(-86.49816255784596 39.16416875013931,-86.49821119751884 39.1643610824232,-86.4984106201776 39.16432714147015,-86.49837170843931 39.16413480909344,-86.49816255784596 39.16417252136563)
CBU Lane Closure N College Ave
southbound lane of N College Ave, from W 17th St to W 15th St
January 30, 2025 08:00 am to 17:00 pm
Please be advised that CBU crews will close the southbound lane of N College Ave, from W 17th St to W 15th St, starting at 8:00 AM Thursday, JAN 30 due to Sewer Line Repair. Normal traffic flow is expected to resume by 5:00 PM
Utilities
LINESTRING(-86.53473335992072 39.178942905318195,-86.53476197036849 39.176858143765486)
CBU Lane Closure N. College Ave.
N College Ave between 15th St & 11th Street
January 31, 2025 08:00 am to 17:00 pm
Please be advised that CBU crews will close the southbound West Lane of N College Ave between 15th St & 11th Street due to Sewer Repair at 8:00 AM on Friday JAN 31st.
Utilities
LINESTRING(-86.53471097030696 39.17281824869298,-86.53468866526795 39.17828226196204)
Duke Energy Intermittent Lane Closure
various
February 1, 2025 to April 30, 2025
Intermittent lane closures 1-2 hours at each pole location for fuse replacement work. This work will take place sometime between 2/1/25 and 4/30/25. Lane restrictions only at each location, no full lane closures at any location. Work will take place over the course of no more than 3 total days at each location. This work is not extensive at any location, and should be completed very quickly with no full lane closures, road closures, or sidewalk closures.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5269283218295 39.137625442510114,-86.52694577821207 39.136472296423875),LINESTRING(-86.52687194723663 39.1360245746304,-86.52589561014001 39.136000925090514,-86.52453982769133 39.135933224672016,-86.52339360743895 39.13593931454048,-86.52200582158521 39.135968651376714,-86.52105444596131 39.13599121817876),LINESTRING(-86.52678296378286 39.130766199238565,-86.52673694594867 39.12765163247647),LINESTRING(-86.52105862092489 39.135990597983096,-86.52105280220471 39.13599736809121),LINESTRING(-86.52667565136474 39.126195730511995,-86.52666172909895 39.12450010014402),LINESTRING(-86.52664621810818 39.12450535679244,-86.52660734148361 39.12161998754169),LINESTRING(-86.53638482107857 39.139471353193215,-86.5361857864628 39.13749755115407,-86.53616182620135 39.137073825930315,-86.53615024460585 39.13686901029979),LINESTRING(-86.53727336750195 39.1371005784365,-86.53836805680402 39.1371005784365,-86.53842492344972 39.13782284624057),LINESTRING(-86.53841927439288 39.13782562926187,-86.53850933750303 39.13840925976194,-86.53857615864179 39.13893204435115),LINESTRING(-86.5387695807883 39.13841011692051,-86.53951623352455 39.13842589066675),LINESTRING(-86.53951332830584 39.13842363731149,-86.54025998082042 39.13844166440941,-86.5402570756017 39.138781925307626,-86.54028612823218 39.13899148919546),LINESTRING(-86.52698028094841 39.13990405364632,-86.52695991498378 39.138940498335955),LINESTRING(-86.54118909098842 39.14395050914473,-86.54181357467367 39.14336449888566,-86.54247570610103 39.14274315497235),LINESTRING(-86.54182173560802 39.143355104122236,-86.54219847950846 39.14352600803906,-86.54266763191154 39.143509468812454,-86.54287377479022 39.14343779955661),LINESTRING(-86.54084641293912 39.14577609812014,-86.53941052213585 39.14573199540766,-86.53905510356651 39.146062765393026),LINESTRING(-86.53882269024751 39.14867573292767,-86.5388679921293 39.14704207856113),LINESTRING(-86.53836805680402 39.1371060922948,-86.53831829787893 39.13659884623064),LINESTRING(-86.53813507902707 39.13416461175058,-86.53767314215816 39.13413756941634),LINESTRING(-86.53798400543727 39.134784328670406,-86.53762665799374 39.13475728657414),LINESTRING(-86.5361857864628 39.1370730108211,-86.53727336750195 39.13711160573206,-86.53718095845697 39.136604359707604),LINESTRING(-86.53646050543936 39.13604019959479,-86.53375348281376 39.13598980667044),LINESTRING(-86.52971468522536 39.13711946078908,-86.53005508568405 39.13742410711316,-86.53037512017814 39.137536938718654,-86.53057877849255 39.13757755803516,-86.53081153085188 39.13757304475979))
Duke 1-2 day lane closure on W Ralston Dr
609 W Ralston Dr
February 1, 2025 to April 30, 2025
WO# 42544962.1-2 day lane closure of the east bound lane of W Ralston Dr occurring between 02/01/2025 and 04/30/2025. Replacing pole # 150-719. No overnight closure.
Engineering
LINESTRING(-86.54049066140601 39.13844399926006,-86.53993472838191 39.138425499176265)
Fiber Installation along N Kinser Pike
N Kinser Pike between W 17th St and the SR 45/46 Bypass
February 3, 2025 to April 3, 2025
QC Communications will have a moving lane closure along N Kinser Pike between W 17th St and the SR 46/45 Bypass and a brief sidewalk closure near Gourley Pike and Kinser Pike intersection for fiber installation. Most of the work will be overhead along the utility pole lines, but there will be a section of underground work near Gourley Pike. The work is anticipated to take 1 to 2 days to complete between 2/3/25 and 4/3/25.
Engineering
LINESTRING(-86.5376701541887 39.18537977570617,-86.53767015418869 39.17907839756984)
Lane Closure - N Walnut Street
N Walnut Street between E 16th St & E 17th Street - Nortbound westside lane
February 3, 2025
N Walnut Street between E 16th St & E 17th Street - Nortbound westside lane
Street
LINESTRING(-86.53350669980948 39.17855368862146,-86.53351061065592 39.17829600096823)
CBU Road Closure - Atwater & High
S High St at E Atwater Ave
February 3, 2025 23:00 pm to 07:00 am February 4, 2025
Please be advised that CBU crews will close S High St at E Atwater Ave overnight due to manhole repair. Normal traffic flow is expected to close at 11pm Monday 2/3/25 and resume at 7:00am Tuesday 2/4/25. Road signs are in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.50845629023195 39.16361854196464,-86.50845760527842 39.16308630062335,-86.5084596717286 39.16224993404492),LINESTRING(-86.50904128915433 39.16309679610899,-86.50846305322527 39.16308630871549))
Lane Closure for Cable Installation on S Hickory Dr
S Hickory Dr between W 3rd St and W Belle Ave
February 4, 2025 to March 4, 2025
QC Communications will be installing new conduit for coaxial cable along S Hickory Dr between W 3rd St and W Belle Ave. The work is planned between 2/4/25 and 3/4/25, but will only take 3-4 days once started. The work will involve a temporary lane closure for the works to access the site.
Engineering
LINESTRING(-86.58589540272872 39.16463369202975,-86.58587885671825 39.16378882594066)
Gas Replacement at 1634 S Pinestone Ct - Lane Closure off of S Henderson St
1634 S Pinestone Ct - main work off of S Henderson St side
February 4, 2025
Centerpoint and Miller Pipeline will be replacing a gas service off of S Henderson St for the 1634 S Pinestone Ct property. The work will involve a lane closure and potentially a sidewalk closure as the work is completed.
Engineering
LINESTRING(-86.5268761117868 39.14876445723763,-86.52687374070933 39.149099116725125)
CBU Lane Closures - S Walnut St
S Walnut St, Kirkwood to 3rd and Grimes to Hillside
February 4, 2025 23:00 pm to 07:00 am February 5, 2025
Due to overnight manhole repair, CBU crews will close one lane of S Walnut St from Kirkwood to 3rd and from Grimes to Hillside. This lane closure is scheduled to start 11pm Tuesday 2/4/25. Normal traffic flow is expected to resume at 7:00am Wednesday 2/5/25. Road signs are in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53362815355821 39.166643093202055,-86.53365342336181 39.16462508928521),LINESTRING(-86.53371028732516 39.15341379415017,-86.53367653238814 39.15056060243205))
E 1st Street Closure
E 1st Street between S Henderson St to S Grant St
February 6, 2025
Street Closure due to street cut and sidewalk repair from 6am to 3pm.
Street
LINESTRING(-86.5272135684115 39.15932572576634,-86.53041032465227 39.15935861122887)
Duke Energy Pad Mount Transformer Install
200 E Kirkwood Ave
February 7, 2025 to February 28, 2025
3 day closure of the east-west alley between E Kirkwood Ave and E 4th St from S Washington St to S Lincoln St to install a new pad mount transformer. Work will occur in the date range of 2/7/25-2/28/25
Engineering
LINESTRING(-86.53204728720455 39.1660794105845,-86.53131621388 39.1660779150541)
Gas Installation for 2038 N Walnut St
2038 N Walnut St
February 10, 2025 to February 28, 2025
Centerpoint will be installing a new gas service for 2038 N Walnut St between 2/10/25 and 2/28/25. The work will involve a lane closure of the right-most lane of N Walnut St and then a sidewalk closure adjacent to 2038 N Walnut St site.
Engineering
LINESTRING(-86.5342504630956 39.18402358439022,-86.5343095017446 39.18433918422386)
CBU Lane Restriction - N Walnut St
N Walnut St between 6th and 7th streets
February 11, 2025 02:30 am to 07:00 am
East Lane Restriction - N Walnut St between 6th and 7th streets from 2:30am to 7:00am February 11th, 2025
Utilities
LINESTRING(-86.53360041807404 39.16856134823735,-86.53360846470109 39.16756526405132)
Bloomingscapes Lane Closure
1202 S Stull Ave
February 12, 2025 to February 14, 2025
1-3 day stationary lane closure on S Stull Ave near the intersection of E Grimes Ln. 22' x 0.5' non pavement excavation to add roughly 22' of curb line on the NE corner of property. CBU has agreed to the principal design of the work.
External Project
LINESTRING(-86.52488230369504 39.15326082018069,-86.52488337656229 39.15312187972327)
Crown Castle Fiber Installation - Lane and Sidewalk Closures
Multiple locations, see description
February 12, 2025 to May 12, 2025
Crown Castle Fiber will be installing aerial and underground fiber optic cable at Walnut St/Rohrer Rd, Walnut St Pike to Henderson St to E Miller Dr, E Cottage Grove at Woodlawn Ave, E 10th St at Campbell St, and E 17th St at David Baker Ave. The work will include moving lane closures and temporary sidewalk closures of the course of the work. The work is expected to take 3 months to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.511316309707 39.178756221667214,-86.51058099402903 39.17880507888793),LINESTRING(-86.51377082415429 39.17159340857546,-86.51339180442777 39.17159615472474),LINESTRING(-86.52362777555173 39.17207632946449,-86.52349489228465 39.17208029169802,-86.52349489228465 39.17251613602352,-86.52323423664534 39.17251613602352),LINESTRING(-86.52624106963043 39.14703518583394,-86.52696218882984 39.14694197770095,-86.52687204893004 39.13600284068116,-86.52685443577126 39.13082877457407,-86.52670420260472 39.12387117730759,-86.52667415597148 39.12340286299303),LINESTRING(-86.53135012242667 39.122052937951054,-86.53135012242667 39.12144686789679,-86.53070411981055 39.121458523139324))
Duke Energy Pole Installation and Maintenance
W Tapp Rd near S Adams St and near S Pinehurst Dr
February 15, 2025 to April 30, 2025
Duke Energy will be Installing pole # MNI-17844 and replacing equipment on pole # 290-490. 1-2 day lane closure on W Tapp Rd near S Adams St and near S Pinehurst Dr between 2/15/25 and 4/30/25. No overnight closure will occur.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55545613892689 39.136501702376705,-86.55338623969163 39.136482122961155),LINESTRING(-86.55038526065282 39.13640382162504,-86.5495815285469 39.136377008198906))
N Park Ridge Rd Lift Station
N Park Ridge Rd
February 17, 2025 to April 21, 2025
Road and sidewalk closure on N Park Ridge Rd to install a lift station on behalf of the City of Bloomington Utilities. The closures will last approximately two months. Local access will be maintained for the closures, and a sidewalk will remain open on the street. Kokosing Industrial will provide advance notice to homeowners affected by the closures through door hangers. The closures will begin on February 17, 2025, and end on April 21, 2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.47287975210232 39.17373860259275,-86.47266306579559 39.1734698298979,-86.47264730679146 39.17317356789624,-86.47280489683271 39.17291090157252,-86.47309249865802 39.17274597105387),LINESTRING(-86.47300582413533 39.17271542832276,-86.47276549932239 39.17285287050822,-86.47263548753837 39.173069723187865,-86.47256851177083 39.173274358201866,-86.47261972853423 39.17350648078039,-86.47276549932239 39.173747765280154))
Poplars Redevelopment Project
400 E 7th St
February 17, 2025 to November 21, 2025
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52971398338842 39.16844890303665,-86.5283524160322 39.168441760864965),LINESTRING(-86.52975083230503 39.16849461292935,-86.52882039716067 39.16849461292935,-86.52869695334626 39.16847747171627,-86.52855324251527 39.16847604324985,-86.52842427130713 39.16849604134089,-86.52830266976989 39.168497469752396))
Landscape Median Maintenance along S College Mall Rd
S College Mall Rd between E 2nd St and E Moores Pike
February 17, 2025 to February 28, 2025
City of Bloomington Parks department will be performing landscape median maintenance for S College Mall Rd and E Moores Pike area. The work will involve two lane closures on either side of the medians for no more than 3 days and is planned between 2/17/25 and 2/28/25.
Engineering
LINESTRING(-86.49766773169208 39.15183946652047,-86.49778899718831 39.157638263364134,-86.49786984085246 39.15831214659573,-86.49770815352416 39.160850904526285)
Landscape Median Maintenance by City Parks along W 3rd St
W 3rd St between Yancy Ln and Patterson Dr
February 17, 2025 to February 28, 2025
City of Bloomington Parks department will be performing landscape median maintenance for W 3rd St between Yancy Ln and Patterson Dr. The work will involve two lane closures on either side of the medians for no more than 3 days and is
planned between 2/17/25 and 2/28/25.
Engineering
LINESTRING(-86.56935188781134 39.16452693381828,-86.55230162197006 39.16439315081047)
Sanitary Sewer Lateral and Water Service Repair for 526 N Lincoln St
526 N Lincoln St
February 17, 2025 to February 21, 2025
Riverway Plumbing will be repairing the sanitary sewer lateral and water service for 526 N Lincoln St during the day from 2/17/2025 through 2/21/2025. Traffic will be detoured to Grant St and Walnut St as Lincoln will be closed for the repairs. The closure is only between E 10th St and E 9th St.
Engineering
LINESTRING(-86.5310547156195 39.17051646584852,-86.53103770266313 39.1716199894168)
Lane Closure for Fiber Installation - QC Communications
613 E Moody Dr
February 17, 2025 to May 9, 2025
For 1 to 2 days, QC Communications will have a lane closure on E Moody Dr for fiber installation. The work is scheduled to occur some time between 2/17/2025 and 5/9/2025.
Engineering
LINESTRING(-86.52606631732746 39.14785329284075,-86.52571720770078 39.14783440391122)
Overhead Fiber Work along E Smith Ave
E Smith Ave from S College Ave to the alleyway east of S Walnut St and then down the alleyway
February 18, 2025 to April 12, 2025
QC Communication will be performing overhead fiber optic cable work along E Smith Ave between S College Ave and the alleyway east of S Walnut St and then down the alleyway to the parking lots in the south sometime between 2/18/2025 and 4/12/2025. The work once scheduled will take a max of 2 days and will not interfere with school pick up and drop off.
Engineering
LINESTRING(-86.53488377026235 39.162858052206275,-86.53302068267173 39.162825490564785,-86.53303595388151 39.16208248901364)
CBU Emergency Road Closing
600 Block of S Eagleson Avenue
both lanes of the 600 Block of S Eagleson Ave between E 2nd & E University Streets
February 21, 2025
City Utilities have closed both lanes of the 600 blk of S Eagleson Ave. between E 2nd & E University to repair a water line break.
Utilities
LINESTRING(-86.51638741116214 39.16100891090892,-86.51637687859393 39.160145959343794)