Choose types

Allen St. Bridge

Bridge between S Morton and S Walnut (150-156 W Allen St)

January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)

B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St.

Adams St along Fountain Dr., up Crescent Rd. to 17th St.

April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))

Flock Safety Camera Installation Along E Kirkwood Ave and N Walnut St

Intersections of E Kirkwood Ave/ S Dunn St, E Kirkwood Ave/ S Grant St, W Kirkwood Ave/ N Walnut St, and N Walnut St/E 7th St

October 23, 2024 to February 23, 2025
Flock Safety is working with the Bloomington Police Department to install live video feed cameras in the right-of-way to aid in BPD investigations. The cameras will be placed in 4 locations along E Kirkwood Ave and N Walnut St. The installation will require a lane closure at each location and is expected to take 5 days to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53357133571649 39.1686589718461,-86.53357444106325 39.1685795228299,-86.53346575392663 39.1685795228299),LINESTRING(-86.52827554433638 39.16662837741421,-86.52827554433638 39.16655735276254,-86.52846807583555 39.166564575611716),LINESTRING(-86.52991059769879 39.16653703479517,-86.5298158846226 39.1665334233692,-86.52981743729597 39.16644554528119),LINESTRING(-86.5335836883135 39.166679163000026,-86.5335836883135 39.16660452697732,-86.53343773701573 39.166608138399596))

Duke N Fee Ln Lane Closure & Pole Installation

825 N Fee Lane

December 2, 2024 to March 15, 2025
Duke Energy will be installing new pole off of N Fee Ln. 1-2 day Lane restrictions only along N Fee Lane adjacent to 825 N Fee Lane in the date range of 12/2/24-3/15/25.
Engineering
LINESTRING(-86.51889218280641 39.17404346449811,-86.51891578629485 39.17426054630877)

AT&T Fiber Installation along S Woodscrest Dr and E 3rd St

S Woodscrest at E 2nd St intersection heading north towards 410 S Woodscrest; E 3rd St at S College Mall Rd intersection

December 16, 2024 to February 28, 2025
AT&T will be installing fiber along S Woodscrest Dr and E 3rd St between 12/16/2024 and 2/28/2025 for 2-3 days max once begun. The work will involve a short sidewalk closure and temporary lane closures for equipment
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5000792424787 39.16421410144247,-86.49890808733562 39.16422524306569,-86.49871768481235 39.16416396411611,-86.49837998977111 39.16416396411611,-86.49830095476145 39.16380464556485),LINESTRING(-86.50295732782295 39.160970161846706,-86.50245507079751 39.16096242467813,-86.5024650494139 39.1618754046973,-86.50246837561937 39.16244278743983))

Fiber Relocation for Broadview Learning Center at 705 W Coolidge Dr

705 W Coolidge Dr to W Graham Dr to S Rogers St and south to just past W Ralston Dr.

December 16, 2024 to May 16, 2025
Smithville has scheduled fiber relocation along W Graham Dr, S Rogers St, and just east of S Brown Ave for the Broadview Learning Center. The work is planned between 12/16/2024 and 5/16/2025, but will only take about a week to complete once work begins in the area. Temporary lane closures are expected and a sidewalk closure on S Rogers St for no more than 3 days is expected.
Engineering
LINESTRING(-86.54165863152343 39.14048866259188,-86.54160294424052 39.14016276545618,-86.54160800672078 39.13988005828523,-86.53865151824567 39.139805454814706,-86.53840547566134 39.137843542006095)

Utility Cabinet Install on east side of S Walnut St

S Walnut St just south of E Winslow Rd on the east side

December 16, 2024 to March 28, 2025
AT&T will be installing a utility cabinet on the east side of S Walnut St just south of E Winslow Rd that will take 2-3 days to install. The work is scheduled between 12/16/2024 and 3/28/2025. The work will primarily be on the road shoulder, but may include brief lane closures during the installation.
Engineering
LINESTRING(-86.53140196468983 39.134648252684315,-86.53139168876503 39.1347890677836,-86.53135058506582 39.134916598196554)

204 E 17th St Alley Paving

204 E 17th St

December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)

AT&T Fiber Installation along N Smith Rd

N Smith Rd between E Grandview Dr and E Morningside Dr, Morningside Dr to E Saratoga Dr

December 30, 2024 to March 28, 2025
AT&T will be installing fiber along N Smith Rd from E Morningside Dr and E Saratoga Dr between 12/30/2024 and 3/28/2025. The work will take 2-3 days once started and will only include a lane closure during that time period. The sidewalks will not be impacted.
Engineering
LINESTRING(-86.48127986784151 39.168652953912726,-86.48124060360924 39.16624806013084,-86.48099193013813 39.16624298642836,-86.48045531896362 39.16638504995993,-86.48019355741508 39.16600452199816)

Duke W Smith Ave Bike Lane Closure

350 S Walnut ST

January 1, 2025 to March 31, 2025
WO#46628241. Replacing overhead equipment on pole # 764-554. 1-2 day lane closure of the east bound bike lane on the south side of W Smith Ave between S College Ave and S Walnut St. Vehicle lane to remain open. No overnight closure.
Engineering
LINESTRING(-86.53367690841516 39.16284345646315,-86.53486691439286 39.16283897746581)

Duke Energy Pole Replacement - W Tapp Rd and W Graham Dr

Near 1722 W Tapp RD and near 913 W Graham Dr

January 1, 2025 to April 30, 2025
WO# 40995283. 1-2 hour closure of the southern lane of W Graham Dr near S Broadview Dr for a pole replacement. 1-2 hour closure of the northern lane of W Tapp Rd near S Boardwalk Cir for a pole replacement. Closures will occur in the date range of 01/01/2025 to 04/30/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55877613398205 39.13654860840089,-86.55780002275073 39.1365412720169),LINESTRING(-86.54365036332634 39.13994197229269,-86.54247186295382 39.13991791829332))

Lane and Sidewalk Closures for Duke Energy Work

E Hillside Dr

January 1, 2025 to March 31, 2025
WO# 42365068. Replacing 9 poles, Replacing overhead equipment on 36 poles, removing equipment from 1 pole, and installing equipment on 2 poles along B-Line Trail/S Walnut Street, E Hillside Drive/S Henderson Street, and S High Street in Bloomington, IN 47403 Permitted closures include: - 1 day of lane and sidewalk closures along the south side of E Hillside Dr between S Henderson St and S High St. - 1 day of lane and sidewalk closures along the east side of S High St between E Hillside Dr and E Southdowns Dr. - 1 day of lane and sidewalk closures along the east side of S Henderson St between E Hillside Dr and E Thornton Dr. Closures will occur in the date range of 01/01/2025 03/31/2025
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.50857144679036 39.150400530436286,-86.52699265985356 39.150509224305694),LINESTRING(-86.52699265985356 39.150509224305694,-86.53350015359871 39.15044711354375))

Duke Energy Overhead work and Pole Replacement

S Walnut St Pike

January 1, 2025 to March 31, 2025
Rolling lane closures and shoulder work along S Walnut St Pike between S Walnut St and E Winslow Rd to replace overhead equipment on six poles and replace two poles. Lane closures will occur over 3 days in the date range of 01/01/2025 to 03/31/2025.
Engineering
LINESTRING(-86.52980615723311 39.13724019435821,-86.52901702137609 39.1362388677575)

E Weymouth Ln Lift Station

E Weymouth Ln

January 1, 2025 to February 28, 2025
Road and sidewalk closure on E Weymouth Ln to install a lift station on behalf of the City of Bloomington Utilities. The closures will last approximately two months. Local access will be maintained for the closures, and a sidewalk will remain open on the street. Kokosing Industrial will provide advance notice to homeowners affected by the closures through door hangers. The closures will begin on January 1, 2025, and end on February 28, 2025
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.47448619867475 39.174443691933334,-86.47303366642517 39.17383204414776),LINESTRING(-86.47442650185764 39.17450735674015,-86.47300195409574 39.17391407058781))

Duke Energy Pole Maintenance and Lane Closure

2333 E 3rd ST

January 1, 2025 to March 31, 2025
1-2 day lane closure on the east bound lane of E 3rd St adjacent to 2420 E 3rd St occuring between 1/1/25 and 3/31/25. Duke Energy will be replacing overhead equipment on pole # 168-648. No overnight closure will occur.
Engineering
LINESTRING(-86.50515985143561 39.1642149742589,-86.50417888918273 39.16421732606571)

Duke - S High St Lane Closure

2000 E Wexley Rd

January 1, 2025 09:00 am to 14:30 pm March 31, 2025
WO# 46628237. Replacing overhead equipment on pole # MNI-6099. 1-2 day lane closure of S High St south of E Wexley Rd in the date range of 01/01/2025 to 03/31/2025. No overnight closure.
Engineering
LINESTRING(-86.50816896765443 39.13690697494957,-86.50817648644521 39.13735456822633)

Duke Energy Pole Maintenance and Lane Closure

300 W 1st St

January 1, 2025 to March 31, 2025
Duke Energy Will be replacing overhead equipment on pole # 152-631. 1-2 day lane closure on S Morton St between W 1st St and W 2nd St occuring between 1/1/25 and 3/31/25. No overnight closure will occur.
Engineering
LINESTRING(-86.53629041294062 39.15972695157808,-86.53628327644239 39.16022912794409)

Duke 1-2 day lane closure on W Ralston Dr

609 W Ralston Dr

February 1, 2025 to April 30, 2025
WO# 42544962.1-2 day lane closure of the east bound lane of W Ralston Dr occurring between 02/01/2025 and 04/30/2025. Replacing pole # 150-719. No overnight closure.
Engineering
LINESTRING(-86.54049066140601 39.13844399926006,-86.53993472838191 39.138425499176265)

Duke Energy Intermittent Lane Closure

various

February 1, 2025 to April 30, 2025
Intermittent lane closures 1-2 hours at each pole location for fuse replacement work. This work will take place sometime between 2/1/25 and 4/30/25. Lane restrictions only at each location, no full lane closures at any location. Work will take place over the course of no more than 3 total days at each location. This work is not extensive at any location, and should be completed very quickly with no full lane closures, road closures, or sidewalk closures.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5269283218295 39.137625442510114,-86.52694577821207 39.136472296423875),LINESTRING(-86.52687194723663 39.1360245746304,-86.52589561014001 39.136000925090514,-86.52453982769133 39.135933224672016,-86.52339360743895 39.13593931454048,-86.52200582158521 39.135968651376714,-86.52105444596131 39.13599121817876),LINESTRING(-86.52678296378286 39.130766199238565,-86.52673694594867 39.12765163247647),LINESTRING(-86.52105862092489 39.135990597983096,-86.52105280220471 39.13599736809121),LINESTRING(-86.52667565136474 39.126195730511995,-86.52666172909895 39.12450010014402),LINESTRING(-86.52664621810818 39.12450535679244,-86.52660734148361 39.12161998754169),LINESTRING(-86.53638482107857 39.139471353193215,-86.5361857864628 39.13749755115407,-86.53616182620135 39.137073825930315,-86.53615024460585 39.13686901029979),LINESTRING(-86.53727336750195 39.1371005784365,-86.53836805680402 39.1371005784365,-86.53842492344972 39.13782284624057),LINESTRING(-86.53841927439288 39.13782562926187,-86.53850933750303 39.13840925976194,-86.53857615864179 39.13893204435115),LINESTRING(-86.5387695807883 39.13841011692051,-86.53951623352455 39.13842589066675),LINESTRING(-86.53951332830584 39.13842363731149,-86.54025998082042 39.13844166440941,-86.5402570756017 39.138781925307626,-86.54028612823218 39.13899148919546),LINESTRING(-86.52698028094841 39.13990405364632,-86.52695991498378 39.138940498335955),LINESTRING(-86.54118909098842 39.14395050914473,-86.54181357467367 39.14336449888566,-86.54247570610103 39.14274315497235),LINESTRING(-86.54182173560802 39.143355104122236,-86.54219847950846 39.14352600803906,-86.54266763191154 39.143509468812454,-86.54287377479022 39.14343779955661),LINESTRING(-86.54084641293912 39.14577609812014,-86.53941052213585 39.14573199540766,-86.53905510356651 39.146062765393026),LINESTRING(-86.53882269024751 39.14867573292767,-86.5388679921293 39.14704207856113),LINESTRING(-86.53836805680402 39.1371060922948,-86.53831829787893 39.13659884623064),LINESTRING(-86.53813507902707 39.13416461175058,-86.53767314215816 39.13413756941634),LINESTRING(-86.53798400543727 39.134784328670406,-86.53762665799374 39.13475728657414),LINESTRING(-86.5361857864628 39.1370730108211,-86.53727336750195 39.13711160573206,-86.53718095845697 39.136604359707604),LINESTRING(-86.53646050543936 39.13604019959479,-86.53375348281376 39.13598980667044),LINESTRING(-86.52971468522536 39.13711946078908,-86.53005508568405 39.13742410711316,-86.53037512017814 39.137536938718654,-86.53057877849255 39.13757755803516,-86.53081153085188 39.13757304475979))

Fiber Installation along N Kinser Pike

N Kinser Pike between W 17th St and the SR 45/46 Bypass

February 3, 2025 to April 3, 2025
QC Communications will have a moving lane closure along N Kinser Pike between W 17th St and the SR 46/45 Bypass and a brief sidewalk closure near Gourley Pike and Kinser Pike intersection for fiber installation. Most of the work will be overhead along the utility pole lines, but there will be a section of underground work near Gourley Pike. The work is anticipated to take 1 to 2 days to complete between 2/3/25 and 4/3/25.
Engineering
LINESTRING(-86.5376701541887 39.18537977570617,-86.53767015418869 39.17907839756984)

Lane Closure for Cable Installation on S Hickory Dr

S Hickory Dr between W 3rd St and W Belle Ave

February 4, 2025 to March 4, 2025
QC Communications will be installing new conduit for coaxial cable along S Hickory Dr between W 3rd St and W Belle Ave. The work is planned between 2/4/25 and 3/4/25, but will only take 3-4 days once started. The work will involve a temporary lane closure for the works to access the site.
Engineering
LINESTRING(-86.58589540272872 39.16463369202975,-86.58587885671825 39.16378882594066)

Duke Energy Pad Mount Transformer Install

200 E Kirkwood Ave

February 7, 2025 to February 28, 2025
3 day closure of the east-west alley between E Kirkwood Ave and E 4th St from S Washington St to S Lincoln St to install a new pad mount transformer. Work will occur in the date range of 2/7/25-2/28/25
Engineering
LINESTRING(-86.53204728720455 39.1660794105845,-86.53131621388 39.1660779150541)

Gas Installation for 2038 N Walnut St

2038 N Walnut St

February 10, 2025 to February 28, 2025
Centerpoint will be installing a new gas service for 2038 N Walnut St between 2/10/25 and 2/28/25. The work will involve a lane closure of the right-most lane of N Walnut St and then a sidewalk closure adjacent to 2038 N Walnut St site.
Engineering
LINESTRING(-86.5342504630956 39.18402358439022,-86.5343095017446 39.18433918422386)

Crown Castle Fiber Installation - Lane and Sidewalk Closures

Multiple locations, see description

February 12, 2025 to May 12, 2025
Crown Castle Fiber will be installing aerial and underground fiber optic cable at Walnut St/Rohrer Rd, Walnut St Pike to Henderson St to E Miller Dr, E Cottage Grove at Woodlawn Ave, E 10th St at Campbell St, and E 17th St at David Baker Ave. The work will include moving lane closures and temporary sidewalk closures of the course of the work. The work is expected to take 3 months to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.511316309707 39.178756221667214,-86.51058099402903 39.17880507888793),LINESTRING(-86.51377082415429 39.17159340857546,-86.51339180442777 39.17159615472474),LINESTRING(-86.52362777555173 39.17207632946449,-86.52349489228465 39.17208029169802,-86.52349489228465 39.17251613602352,-86.52323423664534 39.17251613602352),LINESTRING(-86.52624106963043 39.14703518583394,-86.52696218882984 39.14694197770095,-86.52687204893004 39.13600284068116,-86.52685443577126 39.13082877457407,-86.52670420260472 39.12387117730759,-86.52667415597148 39.12340286299303),LINESTRING(-86.53135012242667 39.122052937951054,-86.53135012242667 39.12144686789679,-86.53070411981055 39.121458523139324))

Duke Energy Pole Installation and Maintenance

W Tapp Rd near S Adams St and near S Pinehurst Dr

February 15, 2025 to April 30, 2025
Duke Energy will be Installing pole # MNI-17844 and replacing equipment on pole # 290-490. 1-2 day lane closure on W Tapp Rd near S Adams St and near S Pinehurst Dr between 2/15/25 and 4/30/25. No overnight closure will occur.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55545613892689 39.136501702376705,-86.55338623969163 39.136482122961155),LINESTRING(-86.55038526065282 39.13640382162504,-86.5495815285469 39.136377008198906))

Poplars Redevelopment Project

400 E 7th St

February 17, 2025 to November 21, 2025
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52971398338842 39.16844890303665,-86.5283524160322 39.168441760864965),LINESTRING(-86.52975083230503 39.16849461292935,-86.52882039716067 39.16849461292935,-86.52869695334626 39.16847747171627,-86.52855324251527 39.16847604324985,-86.52842427130713 39.16849604134089,-86.52830266976989 39.168497469752396))

Landscape Median Maintenance along S College Mall Rd

S College Mall Rd between E 2nd St and E Moores Pike

February 17, 2025 to February 28, 2025
City of Bloomington Parks department will be performing landscape median maintenance for S College Mall Rd and E Moores Pike area. The work will involve two lane closures on either side of the medians for no more than 3 days and is planned between 2/17/25 and 2/28/25.
Engineering
LINESTRING(-86.49766773169208 39.15183946652047,-86.49778899718831 39.157638263364134,-86.49786984085246 39.15831214659573,-86.49770815352416 39.160850904526285)

Landscape Median Maintenance by City Parks along W 3rd St

W 3rd St between Yancy Ln and Patterson Dr

February 17, 2025 to February 28, 2025
City of Bloomington Parks department will be performing landscape median maintenance for W 3rd St between Yancy Ln and Patterson Dr. The work will involve two lane closures on either side of the medians for no more than 3 days and is planned between 2/17/25 and 2/28/25.
Engineering
LINESTRING(-86.56935188781134 39.16452693381828,-86.55230162197006 39.16439315081047)

Lane Closure for Fiber Installation - QC Communications

613 E Moody Dr

February 17, 2025 to May 9, 2025
For 1 to 2 days, QC Communications will have a lane closure on E Moody Dr for fiber installation. The work is scheduled to occur some time between 2/17/2025 and 5/9/2025.
Engineering
LINESTRING(-86.52606631732746 39.14785329284075,-86.52571720770078 39.14783440391122)

N Park Ridge Rd Lift Station

N Park Ridge Rd

February 17, 2025 to April 21, 2025
Road and sidewalk closure on N Park Ridge Rd to install a lift station on behalf of the City of Bloomington Utilities. The closures will last approximately two months. Local access will be maintained for the closures, and a sidewalk will remain open on the street. Kokosing Industrial will provide advance notice to homeowners affected by the closures through door hangers. The closures will begin on February 17, 2025, and end on April 21, 2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.47287975210232 39.17373860259275,-86.47266306579559 39.1734698298979,-86.47264730679146 39.17317356789624,-86.47280489683271 39.17291090157252,-86.47309249865802 39.17274597105387),LINESTRING(-86.47300582413533 39.17271542832276,-86.47276549932239 39.17285287050822,-86.47263548753837 39.173069723187865,-86.47256851177083 39.173274358201866,-86.47261972853423 39.17350648078039,-86.47276549932239 39.173747765280154))

Overhead Fiber Work along E Smith Ave

E Smith Ave from S College Ave to the alleyway east of S Walnut St and then down the alleyway

February 18, 2025 to April 12, 2025
QC Communication will be performing overhead fiber optic cable work along E Smith Ave between S College Ave and the alleyway east of S Walnut St and then down the alleyway to the parking lots in the south sometime between 2/18/2025 and 4/12/2025. The work once scheduled will take a max of 2 days and will not interfere with school pick up and drop off.
Engineering
LINESTRING(-86.53488377026235 39.162858052206275,-86.53302068267173 39.162825490564785,-86.53303595388151 39.16208248901364)

CBU Emergency Road Closing 600 Block of S Eagleson Avenue

both lanes of the 600 Block of S Eagleson Ave between E 2nd & E University Streets

February 21, 2025
City Utilities have closed both lanes of the 600 blk of S Eagleson Ave. between E 2nd & E University to repair a water line break.
Utilities
LINESTRING(-86.51638741116214 39.16100891090892,-86.51637687859393 39.160145959343794)

Coaxial cable installation along E Clover Ln

302 E Clover Ln to N Dunn St

February 24, 2025 to May 6, 2025
QC Communication will be installing new coaxial cable along E Clover Ln from 302 E Clover Ln to N Dunn St. The work is scheduled between 2/24/25 and 5/6/25, but will take 2-6 days once the work begins in that time frame. A lane closure will be present on E Clover Ln during the work.
Engineering
LINESTRING(-86.53091655490644 39.195216295100295,-86.53023326808018 39.19529474622908,-86.52975605188406 39.195446044587186,-86.52907638033203 39.195757045744585,-86.52871846818492 39.19591394670695)

Installation of New Water Service, Meter, and Tap for 1325 N Woodburn Ave

1325 N Woodburn Ave

February 24, 2025 to February 28, 2025
Taycon will be working on the installation of a new water service, meter, and tap for 1325 N Woodburn Ave. The work will involve cutting into Woodburn Ave and removing 1 piece of sidewalk. The sidewalk will be replaced within 24 hours and the road will be plated when not during working hours. The work is planned between 2/24/2025 and 2/28/2025.
Engineering
LINESTRING(-86.53596679121512 39.178385928146554,-86.53596475363345 39.178619693518954)

Gas Service Replacement on E Hector Dr

4301 E Hector Dr

February 25, 2025
Centerpoint is replacing a gas service line at 4301 E Hector Dr and will have a lane closure as they bore under the street to reach the gas main on the other side of the road. The work is planned for 2/25/2025.
Engineering
LINESTRING(-86.4787793558323 39.17405837931858,-86.47859597761725 39.174284612706884)

Gas Service Replacement along S Pickwick Pl

1610 S Pickwick Pl

February 25, 2025
Centerpoint will be replacing the gas service line for 1610 S Pickwick Pl on 2/25/2025. The work will involve a lane closure along S Pickwick Pl and will have the service line bored underneath Pickwick Pl.
Engineering
LINESTRING(-86.50274653080349 39.151923869383296,-86.50217097909174 39.15192234087061)

N Adams Street - Street Repair

N Adams Street - W 6th Street to W 7th Street from 7am to 3:30pm

February 25, 2025
N Adams Street between W 6th Street to W 7th Street. Detour and signage in place.
Street
LINESTRING(-86.54962162126664 39.16863365362033,-86.5496330370403 39.167624707281135)

Water Main Extension along W Guy Ave

635 W Guy Ave

February 26, 2025 to February 28, 2025
Goodman Construction will be extending the water main along W Guy Ave as part of the Habitat for Humanity construction near RCA park. Access to W Guy Ave will be maintained and is expected to begin 2/26/25 and be completed on 2/28/25.
Engineering
LINESTRING(-86.54308993871801 39.14500394141305,-86.54231090387749 39.1450063874903)

Duke Overhead Equipment Replacement

812 S Morton ST

March 1, 2025 to May 31, 2025
Closure of the east lane of S Morton St south of W Dodds St to replace overhead equipment on pole # 152-591. The closure and work will take 1-2 hours and will occur in the date range of 3/1/25-5/31/25
Engineering
LINESTRING(-86.53634193473056 39.1571619668764,-86.5363419347306 39.156700189685864)

Duke Overhead Equipment Replacement

701 W Dodds ST

March 1, 2025 to May 31, 2025
Closure of the west lane of S Fairview St between W Dodds St and W Dixie St to replace overhead equipment on pole # 150-924. Work and closure will take 1-2 hours and will occur in the date range of 03/01/2025-05/31/2025.
Engineering
LINESTRING(-86.5410748801752 39.15741136623572,-86.54109004504988 39.1566728936221)

Duke Energy Fuse Replacements

-S Fairview St -S Walker St

March 1, 2025 to April 30, 2025
No overnight closures. Lane restrictions only, work will take between 1-3 hours at each location. No full lane closures at any location. Work is not extensive at any location, and will not take more than 1 day at each location but please allow 3 days in case of inclement weather.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54103621039071 39.15831323290615,-86.54104863999407 39.15756630368924),LINESTRING(-86.54103621039066 39.158457799119304,-86.54102999582605 39.15935892070863),LINESTRING(-86.5437644459785 39.15761449309409,-86.54345992757122 39.15718560797691),LINESTRING(-86.54107971281692 39.15651577068891,-86.5411045715495 39.15567726055022))

CBU ROAD CLOSURE: N Forrest Ave

N Forrest Ave between 11th & Cottage Grove

March 3, 2025 07:00 am to 17:00 pm March 6, 2025
Please be advised that CBU crews will CLOSE N Forrest Ave. between E 11th & E Cottage Grove due to Water Main Replacement work on Monday, March 3rd at 0700 and normal traffic flow is expected to resume at 5:00pm Thursday, March 6th. Road signs will be in place.
Utilities
LINESTRING(-86.522400598948 39.17338280552107,-86.522400598948 39.17338280552107,-86.52238265737756 39.17253087487461)

Buskirk Chumley Theater Roof Repair

114 E Kirkwood

March 3, 2025 to March 31, 2025
Alley closure in the east/west alley behind property. Lane closure on E Kirkwood for for a total of one day at the beginning and end of the project.
Parks & Recreation
GEOMETRYCOLLECTION(LINESTRING(-86.53295636953031 39.16607749114905,-86.53277288052972 39.16607485670056),LINESTRING(-86.5330243284002 39.16655169750388,-86.53276948237882 39.16655169750388))

Road Closed for Street Cut

S Walker St from W Smith Ave to W Howe St

March 4, 2025 08:00 am to 16:00 pm
S Walker St from W Smith Ave to W Howe St is closed for a Utilities Street Cut
Street
LINESTRING(-86.54622202251284 39.16284859965728,-86.54620406636808 39.162439280752096)

W 13th St Lane and Alley Closure for Water and Sanitary Install

W 13th St at N Woodburn Ave

March 5, 2025 to March 12, 2025
Taycon will be installing new water and sanitary service for properties off of W 13th St just off of N Woodburn Ave. The work is scheduled between 3/5/25 and 3/12/25 and will include a lane and alley closure. Residents will have property access during construction.
Engineering
LINESTRING(-86.53719165411613 39.17549556195402,-86.53616013212084 39.175492957227476)

Duke Energy Lane, Sidewalk, and Alleyway Closure

218 E 17th St

March 6, 2025 to March 18, 2025
WO # 56917088, three day lane, alley sidewalk, and parking lane closures to replace one pole at SW corner of E 17th and N Lincoln St. Replace wire along N Lincoln St. Bore service under 17th St. Replace wire along N Washington St. Closures will occupy the South side of E 17th St and the east side of N Lincoln St. and will be reopened each night. Please see attached plans for details.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5302123589117 39.178998775393694,-86.53094977904617 39.178998775393694,-86.53094977904617 39.179680577108314,-86.53045953898113 39.179680577108314),LINESTRING(-86.53093476902215 39.18065790608159,-86.53094905641015 39.18000890925444))

CBU Road Closure: E 11th St

CBU Road Closure: E 11th St between Forrest & Woodlawn

March 6, 2025 12:00 pm to 17:00 pm March 28, 2025
Please be advised starting on Thursday, March 6, 11th St from Forrest Ave, to N Woodlawn Ave, will be closed for CBU Water Main replacement. Duration of closure will be approximately 6 weeks.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52352276939219 39.17342785847919,-86.52239817090737 39.17341939410056),LINESTRING(-86.52239817090737 39.17341657264083,-86.52240181038466 39.173420804830414))

Intersection 11th & Forrest Ave.

Intersection 11th & Forrest Ave.

March 6, 2025 to March 7, 2025
Please be advised that CBU crews will have the intersection of E 11th & N Forrest Ave., open to local traffic only Thursday & Friday, March 6th & 7th.
Utilities
POINT(-86.52239575880321 39.17341840710603)

Soil Borings for Utility Improvements along E 19th St

E 19th St between N Walnut St and N Washington St

March 7, 2025
Patriot Engineering will be performing soil testing by drilling 4 soil borings along E 19th St between N Walnut St and N Washington St. The work is planned for 3/7/25 and will involve a lane closure when the tests are being completed.
Engineering
LINESTRING(-86.53370878237047 39.18148165761255,-86.53235336846353 39.1813441895992,-86.53204618353602 39.18129263902489)

Duke Energy Lane Closure

2002 W 3rd St

March 7, 2025 to March 21, 2025
WO # 544658670, two days on lane, sidewalk and bike like closure of the northern lanes and sidewalk adjacent to 2002 W 3rd St to Relocate two existing poles 5' to the north.
External Project
LINESTRING(-86.56174046127148 39.16454626273185,-86.56094602347449 39.16453523071539)

Duke Energy Pole Installations

1030 W Acuff Rd

March 7, 2025 to March 21, 2025
2 week intermittent lane closures on W Acuff Rd near 1030 W Acuff Rd in order to remove one pole, install two new ones, and trench in a new primary cable. Work will occur in the date range of 03/07/2025 to 03/21/2025.
Engineering
LINESTRING(-86.55158266567732 39.208395789799425,-86.55032901491342 39.20837482935917)

Unscheduled Road Closing W 4th Street

CBU will Close Both lane of W 4th St between Elm & Waldron St. Camera truck will be there checking sewer lines.

March 10, 2025
City Utilities will have their camera truck checking sewer lines.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54533151802745 39.165702308170125,-86.54533151802745 39.165702308170125),LINESTRING(-86.5437113262087 39.1656533085565,-86.54532002730534 39.165697853661214),LINESTRING(-86.54374005301399 39.16564439953217,-86.5437113262087 39.1656533085565),LINESTRING(-86.54530279122216 39.165697853661214,-86.54369409012551 39.165662217579694))

17th Street Sidewalk Repairs

West 17th Street, from Madison to Woodburn (south side).

March 10, 2025 to March 11, 2025
Sidewalk repair on the south side of West 17th Street between Madison and Woodburn. Lane shifts possible.
Engineering
LINESTRING(-86.53770851137891 39.1789747571016,-86.53591786451449 39.178968055466726)

Westbound Lane of E 10th St Closed From N Fee Ln to N Eagleson Ave

E 10th St from N Fee Ln to N Eagleson Ave

March 10, 2025 06:00 am to 13:00 pm
The westbound lane of E 10th St from N Fee Ln to N Eagleson Ave will be closed to repair the street from a water main break. A detour and signage will be in place.
Street
LINESTRING(-86.51569653059066 39.17159281999682,-86.5189514756856 39.17160413578702)

Road Closed for Tree Removal

W 6th ST between N Pine St and N Oak St

March 10, 2025 08:00 am to 11:30 am
W 6th St between N Pine St and N Oak St closed for tree removal.
Street
LINESTRING(-86.54839341275922 39.16764856491449,-86.54687778310274 39.167642747738284)

CBU Unscheduled Road Closing

W 4th St Between S Elm St & S Waldron St

March 10, 2025 09:00 am to 10:45 am
W 4th St Between S Elm St & S Waldron St closed
Utilities
LINESTRING(-86.54530291333406 39.165668773266276,-86.54374178274442 39.16566096435909)

Road Closed For Street Repair

N Lincoln Street from E 7th Street to E 8th Street

March 11, 2025 08:00 am to 14:00 pm
N Lincoln Street form E 7th Street to E 8th Street closed for street repairs due to water main break. Detour and signage will be in place.
Street
LINESTRING(-86.5310640735641 39.16859827078977,-86.531060100566 39.16945456916332)

Duke Energy Pole Replacement and Alley Closure

Alley between W 3rd St and W 4th St and adjacent to 918 W 3rd St

March 11, 2025 to April 22, 2025
1 day closure of the alley between W 3rd St and W 4th St and adjacent to 918 W 3rd St in order to replace pole # 151-648, occuring in the date range of 3/11/25-4/22/25.
Engineering
LINESTRING(-86.54442165260595 39.16438978832653,-86.54441471918811 39.164719050157146)

Utility Pole Removal by Boldyn Networks

E 10th St & N Union St - NE corner

March 13, 2025 to April 30, 2025
Boldyn Networks will be at E 10th St and N Union St to removal an old utility pole at the northeast corner. The work is anticipated to take 1 day with the work scheduled between 3/13/25 and 4/30/25. The work will include a sidewalk and lane closure during the removal.
Engineering
LINESTRING(-86.5092920381249 39.17159320153175,-86.50892171612433 39.1715851895778)

Duke Energy Pole Replacement and Lane Closure

1030 W Ralston Dr

March 13, 2025 to May 13, 2025
Single day lane closure of the northbound lane of S Rockport Rd in order to replace pole # 150-732. Work is anticipated to take 1-2 hours and will occur in the date range of 03/13/2025 to 05/13/2025.
Engineering
LINESTRING(-86.54638314354395 39.138668816759605,-86.5458666971984 39.13920745511706)

Duke 1-2 day closure of alleyway

1417 A S Walnut ST

March 15, 2025 to August 31, 2025
Replacement of overhead equipment on pole # 151-247. 1-2 day closure of the alley between S Walnut St and S Washington St occuring between 03/15/2025 and 08/31/2025. No overnight closure.
Engineering
LINESTRING(-86.53311762861762 39.15075237627303,-86.53310396215177 39.15112095597746)

Duke Pole Replacement

324 S Highland AVE

March 15, 2025 to May 15, 2025
Closure of the west sidewalk and lane of S Highland Ave adjacent to 324 S Highland Ave to replace pole # 763-646. The work and closures will take 1-2 hours and will occur in the date range of 03/15/2025-05/15/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.51775471236752 39.16401071955406,-86.51774331718104 39.16355305679804),LINESTRING(-86.51780257211597 39.164012486592554,-86.51780713012101 39.163556590898025))

Street crack sealing project

E 7th Street from N Morton St to N Woodlawn Ave

March 17, 2025 to March 18, 2025
Street crack sealing project scheduled, there may be some temporary disruptions.
Street
LINESTRING(-86.5361222329538 39.168572688452485,-86.52570892216337 39.16850418741038,-86.52469914777366 39.16850418741038,-86.52341897425052 39.16850143782864)

Lane and sidewalk closure for roof repairs at 252 N Walnut St

252 N Walnut St

March 17, 2025
Omega Properties is closing the eastern most lane of N Walnut St, along with parking spots in front of La Una Cantina, and the sidewalk at that location. A crane to lift materials to the roof will be in place to make repairs on the building. The closure is scheduled for March 17th, 2025 between 6 AM and 10 AM.
Engineering
LINESTRING(-86.53357207486171 39.16807287232865,-86.53357018894312 39.16852759831892)

Street Crack Sealing Project

E 2nd Street from S High St to S Swain Ave

March 17, 2025 to March 18, 2025
Street crack sealing project scheduled, there may be some temporary disruptions.
Street
LINESTRING(-86.51517782977571 39.161038205290396,-86.50848413656264 39.1609993271409)

Street Crack Seal Project

E Winslow Rd from S Walnut St to S Allendale Dr

March 17, 2025 to March 21, 2025
Street crack sealing project scheduled, there may be some temporary disruptions.
Street
LINESTRING(-86.53111588370281 39.13596673138579,-86.51585863882067 39.13596673138579)

Street crack seal project

S Rogers St from W 4th St to W 11th St

March 17, 2025 to March 18, 2025
Street crack sealing project scheduled, there may be some temporary disruptions.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53863245219445 39.165630284101724,-86.53853217325916 39.173288190673844),LINESTRING(-86.53853217325916 39.173288190673844,-86.53853217325916 39.17326875531069))

Road Closed for Street Repairs

W 6th Street from N Fairview Street to N Jackson Street

March 17, 2025 08:30 am to 15:00 pm
W 6th Street from N Fairview Street to N Jackson Street is closed to repair the street from a water main break. Road signs will be in place.
Street
LINESTRING(-86.5408929870094 39.16760616236982,-86.53988349733986 39.16760616236982)

Duke Energy Lane Restriction

3610 S Leonard Springs Rd

March 17, 2025 to April 25, 2025
WO 54880423, 2 day lane closure of southbound ln to replace underground cable that runs under S Leonard Springs Rd.
External Project
LINESTRING(-86.58249971330814 39.12668493384038,-86.58250887881498 39.12735329655078)

Crack Sealing Project

E Kirkwood Ave from S Walnut St to N Indiana Ave

March 17, 2025
Street crack sealing project scheduled, there may be some temporary disruptions.
Street
LINESTRING(-86.5335653680122 39.166601930555544,-86.52696090119578 39.166580594902825)

CBU Road Closure - E University St

E University St between Eagleson and Swain

March 17, 2025 07:00 am to 17:00 pm
Please be advised that CBU crews will close E University St between Eagleson and Swain due to water main repair on Monday 3/17/25. Normal traffic flow is expected to resume at 5:00pm. Road signs will be in place.
Utilities
LINESTRING(-86.51632721521511 39.16014875447928,-86.51527042486325 39.160144594995785)

Street Crack Seal Project

S Walnut St Pike from E Winslow Rd to E Rhorer Rd

March 17, 2025 to March 21, 2025
Street crack sealing project scheduled, there may be some temporary disruptions.
Street
LINESTRING(-86.52693977655592 39.136020360671836,-86.52662464245223 39.121377292434545)

Alley Closure north of Atwater between Fess and Woodlawn

Alleyway north of Atwater Ave between Fess Ave and Woodlawn Ave

March 17, 2025 to March 21, 2025
Smithville aerial fiber transfer between old utility poles to new utility poles for 3 to 4 hours. The work is planned over IU Spring Break ( 3-17-25 to 3-21-25).
Engineering
LINESTRING(-86.5258338646929 39.163565816699276,-86.52394176835871 39.16355550969777)

CBU Road Closer - E University

E University St. between S Eagleson Ave and S Swain Ave.

March 18, 2025
Please be advised that CBU crews will close E University St between S Eagleson Ave and S Swain Ave due to water main repair on Tuesday 3/18/25. Normal traffic flow is expected to resume at 5:00pm. Road signs will be in place.
Utilities
LINESTRING(-86.5163098560259 39.16014838582106,-86.51525298362012 39.16014653178968)

Gas Service Replacement on Briarcliff Dr

811 W Briarcliff Dr

March 19, 2025
Centerpoint is replacing the gas service at 811 W Briarcliff. This will require digging on either of the road and running the line under the roadway. A lane closure may be present on site. The work is planned for 1 day on 3/19/25.
Engineering
LINESTRING(-86.5417619552698 39.19416018850231,-86.54156772289636 39.19415837486591)

CBU Road Closure - N Forrest Ave

N Forrest Ave between 11th and Cottage Grove

March 19, 2025 to March 28, 2025
Please be advised that CBU crews will close N Forrest Ave between 11th and Cottage Grove due to water main replacement starting WED 3/19/25. Normal traffic flow is expected to resume 3/28/25. Road signs will be in place.
Utilities
LINESTRING(-86.52239367496502 39.17336586513446,-86.52238026552979 39.172565406578514)

CBU Lane Closure - S Walnut St

S Walnut St between 6th and 7th

March 19, 2025 01:00 am to 06:00 am
Please be advised that CBU crews will close the middle lane of S Walnut St between 6th and 7th due to sewer maintenance. Closure starts at 1:00AM 3/19/25 and normal traffic is expected to resume at 6:00AM. Road signs are in place.
Utilities
LINESTRING(-86.53360612464515 39.16766971798893,-86.53360344243613 39.168474487366325)

S Eagleson Ave - Street Cut Repairs

S Eagleson Ave from E University to mid block E 2nd Street

March 20, 2025
Lane restrictions; signage in place.
Street
LINESTRING(-86.51636790791251 39.16054614827465,-86.51637184074983 39.160143602974216)

E University Street - Street Cut Repairs

E University Street from S Eagleson Ave to S Swain Ave

March 20, 2025
Street closing for street cut repairs; signage in place.
Street
LINESTRING(-86.51636849560573 39.1601563812703,-86.51519678714648 39.16014587822377)

Duke Energy Lane Closure

E Winslow, S Rogers, S Smith

March 20, 2025 to June 30, 2025
1-2 Day lane and sidewalk closures to take place between 3/20/25 and 4/10/25 for pole work in three locations: -East side of S Rogers St between W Ralston Dr and W Graham Dr -South side of E Winslow Rd between E Allendale Dr and S Xavier Ct -West side of S Smith Rd between E 3rd St and Stonegate Dr
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.48078203954958 39.16126744620985,-86.48081416974918 39.162351142508044),LINESTRING(-86.51569032760239 39.13596333876856,-86.5135508405162 39.1360142881845),LINESTRING(-86.53866744088982 39.13973269385326,-86.5385725730021 39.138514521268604))

Road Closure for use of a Crane

301 N Washington St

March 22, 2025
HFI will be utilizing a crane on N Washington St adjacent to the AT&T building to move equipment from the AT&T building to the ground level. The sidewalk, bike lane, and roadway in that block will be closed while they complete this work. It is planned for Saturday, March 22nd.
Engineering