Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St.
Adams St along Fountain Dr., up Crescent Rd. to 17th St.
April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
Fiber Relocation for Broadview Learning Center at 705 W Coolidge Dr
705 W Coolidge Dr to W Graham Dr to S Rogers St and south to just past W Ralston Dr.
December 16, 2024 to May 16, 2025
Smithville has scheduled fiber relocation along W Graham Dr, S Rogers St, and just east of S Brown Ave for the Broadview Learning Center. The work is planned between 12/16/2024 and 5/16/2025, but will only take about a week to complete once work begins in the area. Temporary lane closures are expected and a sidewalk closure on S Rogers St for no more than 3 days is expected.
Engineering
LINESTRING(-86.54165863152343 39.14048866259188,-86.54160294424052 39.14016276545618,-86.54160800672078 39.13988005828523,-86.53865151824567 39.139805454814706,-86.53840547566134 39.137843542006095)
Utility Cabinet Install on east side of S Walnut St
S Walnut St just south of E Winslow Rd on the east side
December 16, 2024 to March 28, 2025
AT&T will be installing a utility cabinet on the east side of S Walnut St just south of E Winslow Rd that will take 2-3 days to install. The work is scheduled between 12/16/2024 and 3/28/2025. The work will primarily be on the road shoulder, but may include brief lane closures during the installation.
Engineering
LINESTRING(-86.53140196468983 39.134648252684315,-86.53139168876503 39.1347890677836,-86.53135058506582 39.134916598196554)
204 E 17th St Alley Paving
204 E 17th St
December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)
AT&T Fiber Installation along N Smith Rd
N Smith Rd between E Grandview Dr and E Morningside Dr, Morningside Dr to E Saratoga Dr
December 30, 2024 to March 28, 2025
AT&T will be installing fiber along N Smith Rd from E Morningside Dr and E Saratoga Dr between 12/30/2024 and 3/28/2025. The work will take 2-3 days once started and will only include a lane closure during that time period. The sidewalks will not be impacted.
Engineering
LINESTRING(-86.48127986784151 39.168652953912726,-86.48124060360924 39.16624806013084,-86.48099193013813 39.16624298642836,-86.48045531896362 39.16638504995993,-86.48019355741508 39.16600452199816)
Lane and Sidewalk Closures for Duke Energy Work
E Hillside Dr
January 1, 2025 to March 31, 2025
WO# 42365068. Replacing 9 poles, Replacing overhead equipment on 36 poles, removing equipment from 1 pole, and installing equipment on 2 poles along B-Line Trail/S Walnut Street, E Hillside Drive/S Henderson Street, and S High Street in Bloomington, IN 47403
Permitted closures include:
- 1 day of lane and sidewalk closures along the south side of E Hillside Dr between S Henderson St and S High St.
- 1 day of lane and sidewalk closures along the east side of S High St between E Hillside Dr and E Southdowns Dr.
- 1 day of lane and sidewalk closures along the east side of S Henderson St between E Hillside Dr and E Thornton Dr.
Closures will occur in the date range of 01/01/2025 03/31/2025
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.50857144679036 39.150400530436286,-86.52699265985356 39.150509224305694),LINESTRING(-86.52699265985356 39.150509224305694,-86.53350015359871 39.15044711354375))
Duke Energy Overhead work and Pole Replacement
S Walnut St Pike
January 1, 2025 to March 31, 2025
Rolling lane closures and shoulder work along S Walnut St Pike between S Walnut St and E Winslow Rd to replace overhead equipment on six poles and replace two poles. Lane closures will occur over 3 days in the date range of 01/01/2025 to 03/31/2025.
Engineering
LINESTRING(-86.52980615723311 39.13724019435821,-86.52901702137609 39.1362388677575)
Duke Energy Pole Replacement - W Tapp Rd and W Graham Dr
Near 1722 W Tapp RD and near 913 W Graham Dr
January 1, 2025 to April 30, 2025
WO# 40995283.
1-2 hour closure of the southern lane of W Graham Dr near S Broadview Dr for a pole replacement.
1-2 hour closure of the northern lane of W Tapp Rd near S Boardwalk Cir for a pole replacement.
Closures will occur in the date range of 01/01/2025 to 04/30/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55877613398205 39.13654860840089,-86.55780002275073 39.1365412720169),LINESTRING(-86.54365036332634 39.13994197229269,-86.54247186295382 39.13991791829332))
Duke Energy Pole Maintenance and Lane Closure
300 W 1st St
January 1, 2025 to March 31, 2025
Duke Energy Will be replacing overhead equipment on pole # 152-631. 1-2 day lane closure on S Morton St between W 1st St and W 2nd St occuring between 1/1/25 and 3/31/25. No overnight closure will occur.
Engineering
LINESTRING(-86.53629041294062 39.15972695157808,-86.53628327644239 39.16022912794409)
Duke Energy Pole Maintenance and Lane Closure
2333 E 3rd ST
January 1, 2025 to March 31, 2025
1-2 day lane closure on the east bound lane of E 3rd St adjacent to 2420 E 3rd St occuring between 1/1/25 and 3/31/25. Duke Energy will be replacing overhead equipment on pole # 168-648. No overnight closure will occur.
Engineering
LINESTRING(-86.50515985143561 39.1642149742589,-86.50417888918273 39.16421732606571)
Duke W Smith Ave Bike Lane Closure
350 S Walnut ST
January 1, 2025 to March 31, 2025
WO#46628241. Replacing overhead equipment on pole # 764-554. 1-2 day lane closure of the east bound bike lane on the south side of W Smith Ave between S College Ave and S Walnut St. Vehicle lane to remain open. No overnight closure.
Engineering
LINESTRING(-86.53367690841516 39.16284345646315,-86.53486691439286 39.16283897746581)
Duke - S High St Lane Closure
2000 E Wexley Rd
January 1, 2025 09:00 am to 14:30 pm March 31, 2025
WO# 46628237. Replacing overhead equipment on pole # MNI-6099. 1-2 day lane closure of S High St south of E Wexley Rd in the date range of 01/01/2025 to 03/31/2025. No overnight closure.
Engineering
LINESTRING(-86.50816896765443 39.13690697494957,-86.50817648644521 39.13735456822633)
Duke Energy Intermittent Lane Closure
various
February 1, 2025 to April 30, 2025
Intermittent lane closures 1-2 hours at each pole location for fuse replacement work. This work will take place sometime between 2/1/25 and 4/30/25. Lane restrictions only at each location, no full lane closures at any location. Work will take place over the course of no more than 3 total days at each location. This work is not extensive at any location, and should be completed very quickly with no full lane closures, road closures, or sidewalk closures.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5269283218295 39.137625442510114,-86.52694577821207 39.136472296423875),LINESTRING(-86.52687194723663 39.1360245746304,-86.52589561014001 39.136000925090514,-86.52453982769133 39.135933224672016,-86.52339360743895 39.13593931454048,-86.52200582158521 39.135968651376714,-86.52105444596131 39.13599121817876),LINESTRING(-86.52678296378286 39.130766199238565,-86.52673694594867 39.12765163247647),LINESTRING(-86.52105862092489 39.135990597983096,-86.52105280220471 39.13599736809121),LINESTRING(-86.52667565136474 39.126195730511995,-86.52666172909895 39.12450010014402),LINESTRING(-86.52664621810818 39.12450535679244,-86.52660734148361 39.12161998754169),LINESTRING(-86.53638482107857 39.139471353193215,-86.5361857864628 39.13749755115407,-86.53616182620135 39.137073825930315,-86.53615024460585 39.13686901029979),LINESTRING(-86.53727336750195 39.1371005784365,-86.53836805680402 39.1371005784365,-86.53842492344972 39.13782284624057),LINESTRING(-86.53841927439288 39.13782562926187,-86.53850933750303 39.13840925976194,-86.53857615864179 39.13893204435115),LINESTRING(-86.5387695807883 39.13841011692051,-86.53951623352455 39.13842589066675),LINESTRING(-86.53951332830584 39.13842363731149,-86.54025998082042 39.13844166440941,-86.5402570756017 39.138781925307626,-86.54028612823218 39.13899148919546),LINESTRING(-86.52698028094841 39.13990405364632,-86.52695991498378 39.138940498335955),LINESTRING(-86.54118909098842 39.14395050914473,-86.54181357467367 39.14336449888566,-86.54247570610103 39.14274315497235),LINESTRING(-86.54182173560802 39.143355104122236,-86.54219847950846 39.14352600803906,-86.54266763191154 39.143509468812454,-86.54287377479022 39.14343779955661),LINESTRING(-86.54084641293912 39.14577609812014,-86.53941052213585 39.14573199540766,-86.53905510356651 39.146062765393026),LINESTRING(-86.53882269024751 39.14867573292767,-86.5388679921293 39.14704207856113),LINESTRING(-86.53836805680402 39.1371060922948,-86.53831829787893 39.13659884623064),LINESTRING(-86.53813507902707 39.13416461175058,-86.53767314215816 39.13413756941634),LINESTRING(-86.53798400543727 39.134784328670406,-86.53762665799374 39.13475728657414),LINESTRING(-86.5361857864628 39.1370730108211,-86.53727336750195 39.13711160573206,-86.53718095845697 39.136604359707604),LINESTRING(-86.53646050543936 39.13604019959479,-86.53375348281376 39.13598980667044),LINESTRING(-86.52971468522536 39.13711946078908,-86.53005508568405 39.13742410711316,-86.53037512017814 39.137536938718654,-86.53057877849255 39.13757755803516,-86.53081153085188 39.13757304475979))
Duke 1-2 day lane closure on W Ralston Dr
609 W Ralston Dr
February 1, 2025 to April 30, 2025
WO# 42544962.1-2 day lane closure of the east bound lane of W Ralston Dr occurring between 02/01/2025 and 04/30/2025. Replacing pole # 150-719. No overnight closure.
Engineering
LINESTRING(-86.54049066140601 39.13844399926006,-86.53993472838191 39.138425499176265)
Fiber Installation along N Kinser Pike
N Kinser Pike between W 17th St and the SR 45/46 Bypass
February 3, 2025 to April 3, 2025
QC Communications will have a moving lane closure along N Kinser Pike between W 17th St and the SR 46/45 Bypass and a brief sidewalk closure near Gourley Pike and Kinser Pike intersection for fiber installation. Most of the work will be overhead along the utility pole lines, but there will be a section of underground work near Gourley Pike. The work is anticipated to take 1 to 2 days to complete between 2/3/25 and 4/3/25.
Engineering
LINESTRING(-86.5376701541887 39.18537977570617,-86.53767015418869 39.17907839756984)
Crown Castle Fiber Installation - Lane and Sidewalk Closures
Multiple locations, see description
February 12, 2025 to May 12, 2025
Crown Castle Fiber will be installing aerial and underground fiber optic cable at Walnut St/Rohrer Rd, Walnut St Pike to Henderson St to E Miller Dr, E Cottage Grove at Woodlawn Ave, E 10th St at Campbell St, and E 17th St at David Baker Ave. The work will include moving lane closures and temporary sidewalk closures of the course of the work. The work is expected to take 3 months to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.511316309707 39.178756221667214,-86.51058099402903 39.17880507888793),LINESTRING(-86.51377082415429 39.17159340857546,-86.51339180442777 39.17159615472474),LINESTRING(-86.52362777555173 39.17207632946449,-86.52349489228465 39.17208029169802,-86.52349489228465 39.17251613602352,-86.52323423664534 39.17251613602352),LINESTRING(-86.52624106963043 39.14703518583394,-86.52696218882984 39.14694197770095,-86.52687204893004 39.13600284068116,-86.52685443577126 39.13082877457407,-86.52670420260472 39.12387117730759,-86.52667415597148 39.12340286299303),LINESTRING(-86.53135012242667 39.122052937951054,-86.53135012242667 39.12144686789679,-86.53070411981055 39.121458523139324))
Duke Energy Pole Installation and Maintenance
W Tapp Rd near S Adams St and near S Pinehurst Dr
February 15, 2025 to April 30, 2025
Duke Energy will be Installing pole # MNI-17844 and replacing equipment on pole # 290-490. 1-2 day lane closure on W Tapp Rd near S Adams St and near S Pinehurst Dr between 2/15/25 and 4/30/25. No overnight closure will occur.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55545613892689 39.136501702376705,-86.55338623969163 39.136482122961155),LINESTRING(-86.55038526065282 39.13640382162504,-86.5495815285469 39.136377008198906))
N Park Ridge Rd Lift Station
N Park Ridge Rd
February 17, 2025 to April 21, 2025
Road and sidewalk closure on N Park Ridge Rd to install a lift station on behalf of the City of Bloomington Utilities. The closures will last approximately two months. Local access will be maintained for the closures, and a sidewalk will remain open on the street. Kokosing Industrial will provide advance notice to homeowners affected by the closures through door hangers. The closures will begin on February 17, 2025, and end on April 21, 2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.47287975210232 39.17373860259275,-86.47266306579559 39.1734698298979,-86.47264730679146 39.17317356789624,-86.47280489683271 39.17291090157252,-86.47309249865802 39.17274597105387),LINESTRING(-86.47300582413533 39.17271542832276,-86.47276549932239 39.17285287050822,-86.47263548753837 39.173069723187865,-86.47256851177083 39.173274358201866,-86.47261972853423 39.17350648078039,-86.47276549932239 39.173747765280154))
Lane Closure for Fiber Installation - QC Communications
613 E Moody Dr
February 17, 2025 to May 9, 2025
For 1 to 2 days, QC Communications will have a lane closure on E Moody Dr for fiber installation. The work is scheduled to occur some time between 2/17/2025 and 5/9/2025.
Engineering
LINESTRING(-86.52606631732746 39.14785329284075,-86.52571720770078 39.14783440391122)
Poplars Redevelopment Project
400 E 7th St
February 17, 2025 to November 21, 2025
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52971398338842 39.16844890303665,-86.5283524160322 39.168441760864965),LINESTRING(-86.52975083230503 39.16849461292935,-86.52882039716067 39.16849461292935,-86.52869695334626 39.16847747171627,-86.52855324251527 39.16847604324985,-86.52842427130713 39.16849604134089,-86.52830266976989 39.168497469752396))
Overhead Fiber Work along E Smith Ave
E Smith Ave from S College Ave to the alleyway east of S Walnut St and then down the alleyway
February 18, 2025 to April 12, 2025
QC Communication will be performing overhead fiber optic cable work along E Smith Ave between S College Ave and the alleyway east of S Walnut St and then down the alleyway to the parking lots in the south sometime between 2/18/2025 and 4/12/2025. The work once scheduled will take a max of 2 days and will not interfere with school pick up and drop off.
Engineering
LINESTRING(-86.53488377026235 39.162858052206275,-86.53302068267173 39.162825490564785,-86.53303595388151 39.16208248901364)
Coaxial cable installation along E Clover Ln
302 E Clover Ln to N Dunn St
February 24, 2025 to May 6, 2025
QC Communication will be installing new coaxial cable along E Clover Ln from 302 E Clover Ln to N Dunn St. The work is scheduled between 2/24/25 and 5/6/25, but will take 2-6 days once the work begins in that time frame. A lane closure will be present on E Clover Ln during the work.
Engineering
LINESTRING(-86.53091655490644 39.195216295100295,-86.53023326808018 39.19529474622908,-86.52975605188406 39.195446044587186,-86.52907638033203 39.195757045744585,-86.52871846818492 39.19591394670695)
Duke Overhead Equipment Replacement
812 S Morton ST
March 1, 2025 to May 31, 2025
Closure of the east lane of S Morton St south of W Dodds St to replace overhead equipment on pole # 152-591. The closure and work will take 1-2 hours and will occur in the date range of 3/1/25-5/31/25
Engineering
LINESTRING(-86.53634193473056 39.1571619668764,-86.5363419347306 39.156700189685864)
Duke Overhead Equipment Replacement
701 W Dodds ST
March 1, 2025 to May 31, 2025
Closure of the west lane of S Fairview St between W Dodds St and W Dixie St to replace overhead equipment on pole # 150-924. Work and closure will take 1-2 hours and will occur in the date range of 03/01/2025-05/31/2025.
Engineering
LINESTRING(-86.5410748801752 39.15741136623572,-86.54109004504988 39.1566728936221)
Duke Energy Fuse Replacements
-S Fairview St
-S Walker St
March 1, 2025 to April 30, 2025
No overnight closures. Lane restrictions only, work will take between 1-3 hours at each location. No full lane closures at any location. Work is not extensive at any location, and will not take more than 1 day at each location but please allow 3 days in case of inclement weather.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54103621039071 39.15831323290615,-86.54104863999407 39.15756630368924),LINESTRING(-86.54103621039066 39.158457799119304,-86.54102999582605 39.15935892070863),LINESTRING(-86.5437644459785 39.15761449309409,-86.54345992757122 39.15718560797691),LINESTRING(-86.54107971281692 39.15651577068891,-86.5411045715495 39.15567726055022))
Buskirk Chumley Theater Roof Repair
114 E Kirkwood
March 3, 2025 to March 31, 2025
Alley closure in the east/west alley behind property. Lane closure on E Kirkwood for for a total of one day at the beginning and end of the project.
Parks & Recreation
GEOMETRYCOLLECTION(LINESTRING(-86.53295636953031 39.16607749114905,-86.53277288052972 39.16607485670056),LINESTRING(-86.5330243284002 39.16655169750388,-86.53276948237882 39.16655169750388))
CBU Road Closure: E 11th St
CBU Road Closure: E 11th St between Forrest & Woodlawn
March 6, 2025 12:00 pm to 17:00 pm March 28, 2025
Please be advised starting on Thursday, March 6, 11th St from Forrest Ave, to N Woodlawn Ave, will be closed for CBU Water Main replacement. Duration of closure will be approximately 6 weeks.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52352276939219 39.17342785847919,-86.52239817090737 39.17341939410056),LINESTRING(-86.52239817090737 39.17341657264083,-86.52240181038466 39.173420804830414))
Duke Energy Lane Closure
2002 W 3rd St
March 7, 2025 to March 21, 2025
WO # 544658670, two days on lane, sidewalk and bike like closure of the northern lanes and sidewalk adjacent to 2002 W 3rd St to Relocate two existing poles 5' to the north.
External Project
LINESTRING(-86.56174046127148 39.16454626273185,-86.56094602347449 39.16453523071539)
Duke Energy Pole Installations
1030 W Acuff Rd
March 7, 2025 to March 21, 2025
2 week intermittent lane closures on W Acuff Rd near 1030 W Acuff Rd in order to remove one pole, install two new ones, and trench in a new primary cable. Work will occur in the date range of 03/07/2025 to 03/21/2025.
Engineering
LINESTRING(-86.55158266567732 39.208395789799425,-86.55032901491342 39.20837482935917)
Duke Energy Pole Replacement and Alley Closure
Alley between W 3rd St and W 4th St and adjacent to 918 W 3rd St
March 11, 2025 to April 22, 2025
1 day closure of the alley between W 3rd St and W 4th St and adjacent to 918 W 3rd St in order to replace pole # 151-648, occuring in the date range of 3/11/25-4/22/25.
Engineering
LINESTRING(-86.54442165260595 39.16438978832653,-86.54441471918811 39.164719050157146)
Utility Pole Removal by Boldyn Networks
E 10th St & N Union St - NE corner
March 13, 2025 to April 30, 2025
Boldyn Networks will be at E 10th St and N Union St to removal an old utility pole at the northeast corner. The work is anticipated to take 1 day with the work scheduled between 3/13/25 and 4/30/25. The work will include a sidewalk and lane closure during the removal.
Engineering
LINESTRING(-86.5092920381249 39.17159320153175,-86.50892171612433 39.1715851895778)
Duke Energy Pole Replacement and Lane Closure
1030 W Ralston Dr
March 13, 2025 to May 13, 2025
Single day lane closure of the northbound lane of S Rockport Rd in order to replace pole # 150-732. Work is anticipated to take 1-2 hours and will occur in the date range of 03/13/2025 to 05/13/2025.
Engineering
LINESTRING(-86.54638314354395 39.138668816759605,-86.5458666971984 39.13920745511706)
Duke 1-2 day closure of alleyway
1417 A S Walnut ST
March 15, 2025 to August 31, 2025
Replacement of overhead equipment on pole # 151-247. 1-2 day closure of the alley between S Walnut St and S Washington St occuring between 03/15/2025 and 08/31/2025. No overnight closure.
Engineering
LINESTRING(-86.53311762861762 39.15075237627303,-86.53310396215177 39.15112095597746)
Duke Pole Replacement
324 S Highland AVE
March 15, 2025 to May 15, 2025
Closure of the west sidewalk and lane of S Highland Ave adjacent to 324 S Highland Ave to replace pole # 763-646. The work and closures will take 1-2 hours and will occur in the date range of 03/15/2025-05/15/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.51775471236752 39.16401071955406,-86.51774331718104 39.16355305679804),LINESTRING(-86.51780257211597 39.164012486592554,-86.51780713012101 39.163556590898025))
Street Crack Seal Project
E Winslow Rd from S Walnut St to S Allendale Dr
March 17, 2025 to March 21, 2025
Street crack sealing project scheduled, there may be some temporary disruptions.
Street
LINESTRING(-86.53111588370281 39.13596673138579,-86.51585863882067 39.13596673138579)
Street Crack Seal Project
S Walnut St Pike from E Winslow Rd to E Rhorer Rd
March 17, 2025 to March 21, 2025
Street crack sealing project scheduled, there may be some temporary disruptions.
Street
LINESTRING(-86.52693977655592 39.136020360671836,-86.52662464245223 39.121377292434545)
Alley Closure north of Atwater between Fess and Woodlawn
Alleyway north of Atwater Ave between Fess Ave and Woodlawn Ave
March 17, 2025 to March 21, 2025
Smithville aerial fiber transfer between old utility poles to new utility poles for 3 to 4 hours. The work is planned over IU Spring Break ( 3-17-25 to 3-21-25).
Engineering
LINESTRING(-86.5258338646929 39.163565816699276,-86.52394176835871 39.16355550969777)
Duke Energy Lane Restriction
3610 S Leonard Springs Rd
March 17, 2025 to April 25, 2025
WO 54880423, 2 day lane closure of southbound ln to replace underground cable that runs under S Leonard Springs Rd.
External Project
LINESTRING(-86.58249971330814 39.12668493384038,-86.58250887881498 39.12735329655078)
CBU Road Closer - E University
E University St. between S Eagleson Ave and S Swain Ave.
March 18, 2025
Please be advised that CBU crews will close E University St between S Eagleson Ave and S Swain Ave due to water main repair on Tuesday 3/18/25. Normal traffic flow is expected to resume at 5:00pm. Road signs will be in place.
Utilities
LINESTRING(-86.5163098560259 39.16014838582106,-86.51525298362012 39.16014653178968)
Gas Service Replacement on Briarcliff Dr
811 W Briarcliff Dr
March 19, 2025
Centerpoint is replacing the gas service at 811 W Briarcliff. This will require digging on either of the road and running the line under the roadway. A lane closure may be present on site. The work is planned for 1 day on 3/19/25.
Engineering
LINESTRING(-86.5417619552698 39.19416018850231,-86.54156772289636 39.19415837486591)
CBU Road Closure - N Forrest Ave
N Forrest Ave between 11th and Cottage Grove
March 19, 2025 to March 28, 2025
Please be advised that CBU crews will close N Forrest Ave between 11th and Cottage Grove due to water main replacement starting WED 3/19/25. Normal traffic flow is expected to resume 3/28/25. Road signs will be in place.
Utilities
LINESTRING(-86.52239367496502 39.17336586513446,-86.52238026552979 39.172565406578514)
CBU Lane Closure - S Walnut St
S Walnut St between 6th and 7th
March 19, 2025 01:00 am to 06:00 am
Please be advised that CBU crews will close the middle lane of S Walnut St between 6th and 7th due to sewer maintenance. Closure starts at 1:00AM 3/19/25 and normal traffic is expected to resume at 6:00AM. Road signs are in place.
Utilities
LINESTRING(-86.53360612464515 39.16766971798893,-86.53360344243613 39.168474487366325)
E University Street - Street Cut Repairs
E University Street from S Eagleson Ave to S Swain Ave
March 20, 2025
Street closing for street cut repairs; signage in place.
Street
LINESTRING(-86.51636849560573 39.1601563812703,-86.51519678714648 39.16014587822377)
Duke Energy Lane Closure
E Winslow, S Rogers, S Smith
March 20, 2025 to June 30, 2025
1-2 Day lane and sidewalk closures to take place between 3/20/25 and 4/10/25 for pole work in three locations:
-East side of S Rogers St between W Ralston Dr and W Graham Dr
-South side of E Winslow Rd between E Allendale Dr and S Xavier Ct
-West side of S Smith Rd between E 3rd St and Stonegate Dr
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.48078203954958 39.16126744620985,-86.48081416974918 39.162351142508044),LINESTRING(-86.51569032760239 39.13596333876856,-86.5135508405162 39.1360142881845),LINESTRING(-86.53866744088982 39.13973269385326,-86.5385725730021 39.138514521268604))
S Eagleson Ave - Street Cut Repairs
S Eagleson Ave from E University to mid block E 2nd Street
March 20, 2025
Lane restrictions; signage in place.
Street
LINESTRING(-86.51636790791251 39.16054614827465,-86.51637184074983 39.160143602974216)
Road Closure for use of a Crane
301 N Washington St
March 22, 2025
HFI will be utilizing a crane on N Washington St adjacent to the AT&T building to move equipment from the AT&T building to the ground level. The sidewalk, bike lane, and roadway in that block will be closed while they complete this work. It is planned for Saturday, March 22nd.
Engineering
LINESTRING(-86.53232695382455 39.16860940994067,-86.53231248332528 39.169465776382935)
Overlashing and Underground fiber work in the alleyways and along S Maple St at W 2nd St
W 2nd St north on S Maple St to Maple and Smith Ave intersection
March 24, 2025 to May 24, 2025
Smithville will be performing aerial and underground work along the alleys along S Maple St to W 2nd St and along W 2nd St. The work will involve 1 day of lane closures and maybe include a sidewalk closure if required at the location. The work is planned between March 2025 and Map 2025.
Engineering
LINESTRING(-86.54176418836957 39.16285288973222,-86.54180222948902 39.16143218328472,-86.5426753055688 39.161439115895405)
Courthouse adjacent lighting replacement
930 W Kirkwood Ave
March 24, 2025 to March 28, 2025
Closures of the northern lane and sidewalk on W Kirkwood Ave and the eastern lane and sidewalk on N College Ave adjacent to the Monroe County Courthouse. The closures will occur for a total of 5 days and will be used to replace city lighting around the courthouse. The closures will occur in the date range of 01/18/2025-01/31/2025
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53479121702988 39.1666171087339,-86.5336758572605 39.16660606262462),LINESTRING(-86.53486855949562 39.16665655910998,-86.53484006490297 39.16745660796272),LINESTRING(-86.53470776857998 39.16742662601996,-86.53471998054825 39.16671178959939),LINESTRING(-86.53469759193975 39.1667354597958,-86.53376134103846 39.16671494562601))
CBU Street Closure - E 11th St
E 11th Street between N Fess Ave. and N Park Ave.
March 24, 2025 05:00 am to 13:00 pm March 25, 2025
Starting Monday, 3/24/25 at 5:00 am CBU will close E 11th St from N Fess Ave to N Park Ave for planned maintenance. Full access will be restored by 1:00pm Tuesday 3/25/25
Utilities
LINESTRING(-86.52581378650828 39.17344499744419,-86.52470603418513 39.17344499744419)
Water and Sanitary Installation at 1213 & 1217 N Madison St
1213 & 1217 N Madison St
March 25, 2025 to March 28, 2025
Taycon will be installing new water and sanitary service to the newly built property on N Madison St. The work will also include work at the adjacent property of 1217 N Madison St. A lane closure will be in place as well as a sidewalk closure during the day time hours.
Engineering
LINESTRING(-86.5377701098402 39.178486025771804,-86.53776506370816 39.17807138758312)
NATURE'S WAY
200 N COLLEGE AVE
March 25, 2025 to March 26, 2025
METERS 200A, 202A
Controller
GEOMETRYCOLLECTION(POINT(-86.53485335183716 39.168188556148664),LINESTRING(-86.53485335183716 39.16817192011479,-86.5348962671814 39.16838818824857))
Cable Transfer on a Pole at Cory Ln and W 3rd St
301 S Cory Ln
March 25, 2025 to June 6, 2025
Smithville will be move cables on a pole on W 3rd St in front of 301 S Cory Ln for 2-3 hours between 3/25/25 and 6/6/25. The work may include a sidewalk and lane closure while the crew is working on the pole.
Engineering
LINESTRING(-86.56008139915842 39.16433597396369,-86.55966362604971 39.16433597396369)
CBU Lane closure - N Walnut
N Walnut St. Between 9th & 10th
March 26, 2025 01:00 am to 05:00 am
CBU will be making sewer line repairs on N Walnut St between 9th & 10th starting at 1am-5am on 3/26/25. West lane affected only.
Utilities
LINESTRING(-86.53361349062493 39.17162154446319,-86.53359355270149 39.17050200542744)
Potential Lane Restriction at Arlington/Prow Intersection
Arlington Rd and N Prow Rd intersection
March 26, 2025 to May 23, 2025
Smithville will complete work on the south-west side of the Arlington and Prow intersection that may impact the main thru lane on Arlington Rd. The crew will be performing cable transfers on two poles on the south-west side. The work once started will take about 4 hours to complete.
Engineering
LINESTRING(-86.55279534161603 39.192496475032755,-86.55259955178109 39.192287174778954)
Gilliatte Alley Closure
200 E Kirkwood
March 27, 2025 to March 28, 2025
2 Day alley closure for brickwork for Posh Hotel construction.
External Project
LINESTRING(-86.53231649024156 39.166079990253024,-86.53199194295075 39.166081030036196)
Longview Neighborhood Greenway Project
Longview Ave from Pete Ellis through to Smith Rd.
March 31, 2025 to July 11, 2025 daily until July 15, 2025
Along Longview Ave between Pete Ellis and through to Smith Rd, there will be new curbs installed as well as new curb ramps and sidewalk in areas. There is a multiuse path being installed along the north side of Longview between Pete Ellis and Kingston. There will also be asphalt speed humps installed. There may be time limited road closures when the speed humps are installed.
Engineering
LINESTRING(-86.4948113588396 39.16687841305256,-86.49211444628399 39.16686155054853,-86.49097260844732 39.16752761397052,-86.49009176145245 39.1677215298821,-86.49011351207203 39.16798289391835,-86.49011351207203 39.1677130985708,-86.48958065341932 39.16772996087067,-86.4887433060043 39.16762035633181,-86.48733184056242 39.167316835129554,-86.48605950730486 39.16719036752173,-86.4851134134292 39.16716507371555,-86.48441743674488 39.16718193614679,-86.48424344174413 39.16713134916259,-86.48421081747406 39.16700488122126,-86.4841890685138 39.166237637309706,-86.48139428480737 39.166254499963344)
Duke Energy Lane Closure
903 S Basswood Cir
March 31, 2025 to April 30, 2025
WO # 48543880, one day lane closure on the east side of S Basswood CIR to replace overhead equipment on PAD SG2 along east side of S Basswood Drive. No overnight closure. Work will be completed in 1 day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.57249525741292 39.1529961200132,-86.5724929131908 39.15272161892949)
Winslow, Rogers Resurfacing Project (Allendale to Sare)
Winslow Rd from Allendale east, then east on Rogers Rd to Sare Rd
March 31, 2025 to July 15, 2025 daily until July 25, 2025
Winslow and Rogers Rd will be resurfaced from Allendale to Sare Rd. There are new curbs, curb ramps, and sidewalk being installed as well. There is also a median and rain garden being installed at Xavier Ct on Winslow Ave.
Engineering
LINESTRING(-86.51551749270192 39.13596711566274,-86.50934802393678 39.13601056246057,-86.50850382391799 39.13625262229468,-86.50812773400862 39.136147109263476,-86.50795969412214 39.136345722063936,-86.5081917494942 39.13651950815995,-86.5084718161752 39.13627744900657,-86.50811973222555 39.13613469588563,-86.50792768637935 39.13635192885292,-86.50714349942835 39.13644502849087,-86.50611925532218 39.136327102167286,-86.50398274688557 39.1359857356546,-86.49715712214058 39.135911255420865)
Road Closed for Street Cut Repair
West 8th Street from North John Street to North Williams Street
March 31, 2025 08:00 am to 16:00 pm
W 8th St from N John St to N Williams St is closed for street repair due to water main break.
Street
LINESTRING(-86.54433108494403 39.169584762314514,-86.54328235967729 39.169584762314514)
Lane Closure for Gas line Replacement on W Allen St
2019 W Allen St
April 1, 2025
Miller Pipeline will be replacing the gas line at 2019 W Allen St for Centerpoint on April 1st, 2025. The work may involve a lane closure as they bore underneath W Allen St
Engineering
LINESTRING(-86.55950966097224 39.1559996893954,-86.55914939133282 39.15599287564498)
CBU Road Closure - N Kinser Pike at W Parrish Rd
N Kinser Pike at W Parrish Rd
April 1, 2025 22:30 pm to 06:00 am April 2, 2025
CBU is repairing a water main. Approx. 400ft of N Kinser Pike just North of W Parrish Rd will be closed. April 1st, 10:30 PM to April 2nd, 6:00 AM. Suggested detour route - W Club House Dr and W Acuff Rd, W Prow Rd
Utilities
LINESTRING(-86.53775183126353 39.18812277909885,-86.53774679127075 39.189146241862005)
Duke Energy Lane Closure
2425 S Walnut St
April 1, 2025 to August 31, 2025
WO # 40994471, single day lane closure for replacing pole # 151-161 and installing new pole # MNI-12336 along West side of S Walnut Street. No overnight closure. Work will take 1 day, but please allow up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.53042191860095 39.13757760681224,-86.53038739118523 39.137782399625735)
Bloomingscapes Lane Closure
1001 N Jackson
April 1, 2025 to June 9, 2025
Lane closure on the north side of W 15th St adjacent to 1001 N Jackson St property for driveway installation at 1001 N Jackson St - driveway will be located on 15th Street. Lane closure will occur for up to 3 days in the date range of 4/1/25 to 6/9/2025.
External Project
LINESTRING(-86.53972641778974 39.17663136406301,-86.54009201738587 39.17663811201288)
Kirkwood 2025 Pedestrian Season / Dining Closure
E kirkwood Ave
April 2, 2025 to November 14, 2025
Planned street closure of 1/2 of the 100 block, 300, 400, and 500 blocks of E Kirkwood from Walnut to Indiana.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53356764722223 39.16659167582003,-86.53296935044038 39.166583421954726),LINESTRING(-86.53104972965902 39.166569102177334,-86.52983561781902 39.166553457020115),LINESTRING(-86.52975826443308 39.16655345702014,-86.52829527648181 39.16654302691339),LINESTRING(-86.52820783352382 39.16654041938648,-86.52696345296756 39.16654302691339))
Water Service Install on N Washington St south of E 17th St
N Washington St south of W 17th St (204 E 17th St)
April 2, 2025 to April 7, 2025
Taycon will be installing a new water line for 204 E 17th St that will run behind the property into the E/W alleyway south of E 17th St and then run west into N Washington St where the service will attach to the water main. The eastern side of N Washington St at the alley entrance will be under a lane closure during the daytime hours and the alleyway will also be closed.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53221745859939 39.17868120541152,-86.53221855457495 39.17857925598861,-86.5322194524276 39.17849573617056),LINESTRING(-86.53220948328648 39.17857919738955,-86.53101518018082 39.17857301508042))
W 3rd St Median Maintenance
W 3rd St between Yancy Ln and Patterson Dr
April 3, 2025 to April 11, 2025
The Parks Department will have the innermost lanes of W 3rd St temporarily closed as they work on median maintenance. The work is expected to take a day or 2 once started.
Parks & Recreation
LINESTRING(-86.55647087583823 39.16443546668816,-86.56941288218 39.16459555586508,-86.56941288218 39.164501758782166,-86.55649027176558 39.1644009801671)
Parks Median Maintenance along S College Mall Rd
S College Mall Rd between E 2nd St and E Moores Pike
April 3, 2025 to April 11, 2025
The Parks Department will be working on median maintenance along the S College Mall Rd corridor. The work will close the innermost lanes of S College Mall Rd as the crew works on the medians. The work is estimated to take a day or 2 once started.
Parks & Recreation
LINESTRING(-86.49756871255454 39.15210289557385,-86.4976605640134 39.155152695223364,-86.49782775606873 39.158129818764905,-86.49766910354884 39.16075699238928,-86.49766075341624 39.16093018511589,-86.49776930514037 39.16093018511589,-86.49791125739497 39.158121264882624,-86.49771468669029 39.15211064231508)
Road Closed For Tree Removal
S Washington St between E Dixie St and E Dodds St
April 3, 2025 14:15 pm to 15:30 pm
S Washington St between E Dixie St and E Dodds St is closed to remove a tree that has fallen.
Street
LINESTRING(-86.53245335973328 39.15739112926241,-86.53245943002338 39.15653209839721)
CBU - Signal Managed Lane Restriction
S Patterson Dr from W Allen St. to W 2nd St.
April 7, 2025 05:00 am to 17:00 pm May 7, 2025
CBU is repairing a water main on South Patterson Drive between W Allen St. and W 2nd St. Close to the site of the repair traffic will be restricted to one alternating lane managed by an automated traffic control signal. Repairs are expected to take four weeks beginning April 7th, 2025 to May 7th, 2025. Traffic signs will be in place alerting drivers. The repairs will divert but not impede sidewalk access.
Utilities
LINESTRING(-86.54710463034594 39.15937471890172,-86.54337917274196 39.15589525639385,-86.54333743092009 39.15572532474815)
Smithville Transfer on Pole Line - S Morton St
In front of 922 S Morton St and 1140 S Morton St
April 7, 2025 to June 20, 2025
Sometime between April 7th, 25 and June 20th, 25, Smithville will have a temporary lane closure in front of 2 poles along S Morton St to transfer cables along the pole line. The closures will take about a day total once begun. No sidewalks will be effected.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53636334100577 39.154037091060076,-86.53636664381396 39.153404480027774),LINESTRING(-86.53633209839722 39.15598653952267,-86.53631986645033 39.156362382269634))
CBU Road Closure for Planned Maintenance
Between E Hillside Dr. to E Viva Dr.
April 9, 2025 21:00 pm to 06:00 am April 10, 2025
CBU will close the road between E Hillside Dr. and E Viva Dr. from 9:00pm 4/9/25 until 6:00am 4/10/25. After 6:00am traffic will be fully restored.
Utilities
LINESTRING(-86.50843642055952 39.1525762501704,-86.50843105614149 39.15050041395702)
Duke Energy Lane Restriction
1029 W Ralston
April 14, 2025 to May 16, 2025
WO # 48868802, two days of lane restrictions to replace pole 150-734 at the corner of S Rockport Rd and W Ralston Dr.
External Project
LINESTRING(-86.54668359083894 39.13834613532666,-86.5464679845154 39.138550017463814)
Duke Energy Pole Installation
301 S Kirby Alley
April 15, 2025 to May 31, 2025
Lane restriction on S Kirby Alley between E 3rd St and E Smith Ave to install new pole # MNI-12532. Work and closure will take 1-2 hours and will occur in the date range of 04/15/2025 to 05/31/2025.
Engineering
LINESTRING(-86.52920139414442 39.16446607999734,-86.5291836510689 39.16351341521417)
DUke Energy Pole Installation
850 E Winslow Rd
April 15, 2025 to May 31, 2025
3 day lane closure on the south side of W Winslow Rd just west of S Highland Ave to install a new pole.
Installing new pole on South side of E Winslow Road just before the intersection with S Highland Avenue. Work will occur between 04/15/2025 and 05/31/2025.
Engineering
LINESTRING(-86.51756930427086 39.13598672799296,-86.51887918836583 39.13597513707447)
Duke Energy Pole Replacements
604 E Allendale Dr
April 15, 2025 to June 30, 2025
WO 42544972. 3 day lane closure on the east side of S Walnut Street Pike south of E Allendale Dr to replace two poles. Work will occur in the date range of 04/15/2025 to 05/31/2025
Engineering
LINESTRING(-86.52679450552313 39.131191988602694,-86.52679450552311 39.13032243600347)