Allen St. Bridge

Bridge between S Morton and S Walnut (150-156 W Allen St)

January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)

B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St.

Adams St along Fountain Dr., up Crescent Rd. to 17th St.

April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))

Fiber Relocation for Broadview Learning Center at 705 W Coolidge Dr

705 W Coolidge Dr to W Graham Dr to S Rogers St and south to just past W Ralston Dr.

December 16, 2024 to May 16, 2025
Smithville has scheduled fiber relocation along W Graham Dr, S Rogers St, and just east of S Brown Ave for the Broadview Learning Center. The work is planned between 12/16/2024 and 5/16/2025, but will only take about a week to complete once work begins in the area. Temporary lane closures are expected and a sidewalk closure on S Rogers St for no more than 3 days is expected.
Engineering
LINESTRING(-86.54165863152343 39.14048866259188,-86.54160294424052 39.14016276545618,-86.54160800672078 39.13988005828523,-86.53865151824567 39.139805454814706,-86.53840547566134 39.137843542006095)

204 E 17th St Alley Paving

204 E 17th St

December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)

Duke Energy Pole Replacement - W Tapp Rd and W Graham Dr

Near 1722 W Tapp RD and near 913 W Graham Dr

January 1, 2025 to April 30, 2025
WO# 40995283. 1-2 hour closure of the southern lane of W Graham Dr near S Broadview Dr for a pole replacement. 1-2 hour closure of the northern lane of W Tapp Rd near S Boardwalk Cir for a pole replacement. Closures will occur in the date range of 01/01/2025 to 04/30/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55877613398205 39.13654860840089,-86.55780002275073 39.1365412720169),LINESTRING(-86.54365036332634 39.13994197229269,-86.54247186295382 39.13991791829332))

Duke Energy Intermittent Lane Closure

various

February 1, 2025 to April 30, 2025
Intermittent lane closures 1-2 hours at each pole location for fuse replacement work. This work will take place sometime between 2/1/25 and 4/30/25. Lane restrictions only at each location, no full lane closures at any location. Work will take place over the course of no more than 3 total days at each location. This work is not extensive at any location, and should be completed very quickly with no full lane closures, road closures, or sidewalk closures.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5269283218295 39.137625442510114,-86.52694577821207 39.136472296423875),LINESTRING(-86.52687194723663 39.1360245746304,-86.52589561014001 39.136000925090514,-86.52453982769133 39.135933224672016,-86.52339360743895 39.13593931454048,-86.52200582158521 39.135968651376714,-86.52105444596131 39.13599121817876),LINESTRING(-86.52678296378286 39.130766199238565,-86.52673694594867 39.12765163247647),LINESTRING(-86.52105862092489 39.135990597983096,-86.52105280220471 39.13599736809121),LINESTRING(-86.52667565136474 39.126195730511995,-86.52666172909895 39.12450010014402),LINESTRING(-86.52664621810818 39.12450535679244,-86.52660734148361 39.12161998754169),LINESTRING(-86.53638482107857 39.139471353193215,-86.5361857864628 39.13749755115407,-86.53616182620135 39.137073825930315,-86.53615024460585 39.13686901029979),LINESTRING(-86.53727336750195 39.1371005784365,-86.53836805680402 39.1371005784365,-86.53842492344972 39.13782284624057),LINESTRING(-86.53841927439288 39.13782562926187,-86.53850933750303 39.13840925976194,-86.53857615864179 39.13893204435115),LINESTRING(-86.5387695807883 39.13841011692051,-86.53951623352455 39.13842589066675),LINESTRING(-86.53951332830584 39.13842363731149,-86.54025998082042 39.13844166440941,-86.5402570756017 39.138781925307626,-86.54028612823218 39.13899148919546),LINESTRING(-86.52698028094841 39.13990405364632,-86.52695991498378 39.138940498335955),LINESTRING(-86.54118909098842 39.14395050914473,-86.54181357467367 39.14336449888566,-86.54247570610103 39.14274315497235),LINESTRING(-86.54182173560802 39.143355104122236,-86.54219847950846 39.14352600803906,-86.54266763191154 39.143509468812454,-86.54287377479022 39.14343779955661),LINESTRING(-86.54084641293912 39.14577609812014,-86.53941052213585 39.14573199540766,-86.53905510356651 39.146062765393026),LINESTRING(-86.53882269024751 39.14867573292767,-86.5388679921293 39.14704207856113),LINESTRING(-86.53836805680402 39.1371060922948,-86.53831829787893 39.13659884623064),LINESTRING(-86.53813507902707 39.13416461175058,-86.53767314215816 39.13413756941634),LINESTRING(-86.53798400543727 39.134784328670406,-86.53762665799374 39.13475728657414),LINESTRING(-86.5361857864628 39.1370730108211,-86.53727336750195 39.13711160573206,-86.53718095845697 39.136604359707604),LINESTRING(-86.53646050543936 39.13604019959479,-86.53375348281376 39.13598980667044),LINESTRING(-86.52971468522536 39.13711946078908,-86.53005508568405 39.13742410711316,-86.53037512017814 39.137536938718654,-86.53057877849255 39.13757755803516,-86.53081153085188 39.13757304475979))

Duke 1-2 day lane closure on W Ralston Dr

609 W Ralston Dr

February 1, 2025 to April 30, 2025
WO# 42544962.1-2 day lane closure of the east bound lane of W Ralston Dr occurring between 02/01/2025 and 04/30/2025. Replacing pole # 150-719. No overnight closure.
Engineering
LINESTRING(-86.54049066140601 39.13844399926006,-86.53993472838191 39.138425499176265)

Crown Castle Fiber Installation - Lane and Sidewalk Closures

Multiple locations, see description

February 12, 2025 to May 12, 2025
Crown Castle Fiber will be installing aerial and underground fiber optic cable at Walnut St/Rohrer Rd, Walnut St Pike to Henderson St to E Miller Dr, E Cottage Grove at Woodlawn Ave, E 10th St at Campbell St, and E 17th St at David Baker Ave. The work will include moving lane closures and temporary sidewalk closures of the course of the work. The work is expected to take 3 months to complete.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.511316309707 39.178756221667214,-86.51058099402903 39.17880507888793),LINESTRING(-86.51377082415429 39.17159340857546,-86.51339180442777 39.17159615472474),LINESTRING(-86.52362777555173 39.17207632946449,-86.52349489228465 39.17208029169802,-86.52349489228465 39.17251613602352,-86.52323423664534 39.17251613602352),LINESTRING(-86.52624106963043 39.14703518583394,-86.52696218882984 39.14694197770095,-86.52687204893004 39.13600284068116,-86.52685443577126 39.13082877457407,-86.52670420260472 39.12387117730759,-86.52667415597148 39.12340286299303),LINESTRING(-86.53135012242667 39.122052937951054,-86.53135012242667 39.12144686789679,-86.53070411981055 39.121458523139324))

Duke Energy Pole Installation and Maintenance

W Tapp Rd near S Adams St and near S Pinehurst Dr

February 15, 2025 to April 30, 2025
Duke Energy will be Installing pole # MNI-17844 and replacing equipment on pole # 290-490. 1-2 day lane closure on W Tapp Rd near S Adams St and near S Pinehurst Dr between 2/15/25 and 4/30/25. No overnight closure will occur.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55545613892689 39.136501702376705,-86.55338623969163 39.136482122961155),LINESTRING(-86.55038526065282 39.13640382162504,-86.5495815285469 39.136377008198906))

Lane Closure for Fiber Installation - QC Communications

613 E Moody Dr

February 17, 2025 to May 9, 2025
For 1 to 2 days, QC Communications will have a lane closure on E Moody Dr for fiber installation. The work is scheduled to occur some time between 2/17/2025 and 5/9/2025.
Engineering
LINESTRING(-86.52606631732746 39.14785329284075,-86.52571720770078 39.14783440391122)

Poplars Redevelopment Project

400 E 7th St

February 17, 2025 to November 21, 2025
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52971398338842 39.16844890303665,-86.5283524160322 39.168441760864965),LINESTRING(-86.52975083230503 39.16849461292935,-86.52882039716067 39.16849461292935,-86.52869695334626 39.16847747171627,-86.52855324251527 39.16847604324985,-86.52842427130713 39.16849604134089,-86.52830266976989 39.168497469752396))

Coaxial cable installation along E Clover Ln

302 E Clover Ln to N Dunn St

February 24, 2025 to May 6, 2025
QC Communication will be installing new coaxial cable along E Clover Ln from 302 E Clover Ln to N Dunn St. The work is scheduled between 2/24/25 and 5/6/25, but will take 2-6 days once the work begins in that time frame. A lane closure will be present on E Clover Ln during the work.
Engineering
LINESTRING(-86.53091655490644 39.195216295100295,-86.53023326808018 39.19529474622908,-86.52975605188406 39.195446044587186,-86.52907638033203 39.195757045744585,-86.52871846818492 39.19591394670695)

Duke Energy Fuse Replacements

-S Fairview St -S Walker St

March 1, 2025 to April 30, 2025
No overnight closures. Lane restrictions only, work will take between 1-3 hours at each location. No full lane closures at any location. Work is not extensive at any location, and will not take more than 1 day at each location but please allow 3 days in case of inclement weather.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54103621039071 39.15831323290615,-86.54104863999407 39.15756630368924),LINESTRING(-86.54103621039066 39.158457799119304,-86.54102999582605 39.15935892070863),LINESTRING(-86.5437644459785 39.15761449309409,-86.54345992757122 39.15718560797691),LINESTRING(-86.54107971281692 39.15651577068891,-86.5411045715495 39.15567726055022))

Duke Overhead Equipment Replacement

812 S Morton ST

March 1, 2025 to May 31, 2025
Closure of the east lane of S Morton St south of W Dodds St to replace overhead equipment on pole # 152-591. The closure and work will take 1-2 hours and will occur in the date range of 3/1/25-5/31/25
Engineering
LINESTRING(-86.53634193473056 39.1571619668764,-86.5363419347306 39.156700189685864)

Duke Overhead Equipment Replacement

701 W Dodds ST

March 1, 2025 to May 31, 2025
Closure of the west lane of S Fairview St between W Dodds St and W Dixie St to replace overhead equipment on pole # 150-924. Work and closure will take 1-2 hours and will occur in the date range of 03/01/2025-05/31/2025.
Engineering
LINESTRING(-86.5410748801752 39.15741136623572,-86.54109004504988 39.1566728936221)

Duke Energy Pole Replacement and Lane Closure

1030 W Ralston Dr

March 13, 2025 to May 13, 2025
Single day lane closure of the northbound lane of S Rockport Rd in order to replace pole # 150-732. Work is anticipated to take 1-2 hours and will occur in the date range of 03/13/2025 to 05/13/2025.
Engineering
LINESTRING(-86.54638314354395 39.138668816759605,-86.5458666971984 39.13920745511706)

Utility Pole Removal by Boldyn Networks

E 10th St & N Union St - NE corner

March 13, 2025 to April 30, 2025
Boldyn Networks will be at E 10th St and N Union St to removal an old utility pole at the northeast corner. The work is anticipated to take 1 day with the work scheduled between 3/13/25 and 4/30/25. The work will include a sidewalk and lane closure during the removal.
Engineering
LINESTRING(-86.5092920381249 39.17159320153175,-86.50892171612433 39.1715851895778)

Duke 1-2 day closure of alleyway

1417 A S Walnut ST

March 15, 2025 to August 31, 2025
Replacement of overhead equipment on pole # 151-247. 1-2 day closure of the alley between S Walnut St and S Washington St occuring between 03/15/2025 and 08/31/2025. No overnight closure.
Engineering
LINESTRING(-86.53311762861762 39.15075237627303,-86.53310396215177 39.15112095597746)

Duke Pole Replacement

324 S Highland AVE

March 15, 2025 to May 15, 2025
Closure of the west sidewalk and lane of S Highland Ave adjacent to 324 S Highland Ave to replace pole # 763-646. The work and closures will take 1-2 hours and will occur in the date range of 03/15/2025-05/15/2025.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.51775471236752 39.16401071955406,-86.51774331718104 39.16355305679804),LINESTRING(-86.51780257211597 39.164012486592554,-86.51780713012101 39.163556590898025))

Duke Energy Lane Restriction

3610 S Leonard Springs Rd

March 17, 2025 to April 25, 2025
WO 54880423, 2 day lane closure of southbound ln to replace underground cable that runs under S Leonard Springs Rd.
External Project
LINESTRING(-86.58249971330814 39.12668493384038,-86.58250887881498 39.12735329655078)

Duke Energy Lane Closure

E Winslow, S Rogers, S Smith

March 20, 2025 to June 30, 2025
1-2 Day lane and sidewalk closures to take place between 3/20/25 and 4/10/25 for pole work in three locations: -East side of S Rogers St between W Ralston Dr and W Graham Dr -South side of E Winslow Rd between E Allendale Dr and S Xavier Ct -West side of S Smith Rd between E 3rd St and Stonegate Dr
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.48078203954958 39.16126744620985,-86.48081416974918 39.162351142508044),LINESTRING(-86.51569032760239 39.13596333876856,-86.5135508405162 39.1360142881845),LINESTRING(-86.53866744088982 39.13973269385326,-86.5385725730021 39.138514521268604))

Overlashing and Underground fiber work in the alleyways and along S Maple St at W 2nd St

W 2nd St north on S Maple St to Maple and Smith Ave intersection

March 24, 2025 to May 24, 2025
Smithville will be performing aerial and underground work along the alleys along S Maple St to W 2nd St and along W 2nd St. The work will involve 1 day of lane closures and maybe include a sidewalk closure if required at the location. The work is planned between March 2025 and Map 2025.
Engineering
LINESTRING(-86.54176418836957 39.16285288973222,-86.54180222948902 39.16143218328472,-86.5426753055688 39.161439115895405)

Cable Transfer on a Pole at Cory Ln and W 3rd St

301 S Cory Ln

March 25, 2025 to June 6, 2025
Smithville will be move cables on a pole on W 3rd St in front of 301 S Cory Ln for 2-3 hours between 3/25/25 and 6/6/25. The work may include a sidewalk and lane closure while the crew is working on the pole.
Engineering
LINESTRING(-86.56008139915842 39.16433597396369,-86.55966362604971 39.16433597396369)

Potential Lane Restriction at Arlington/Prow Intersection

Arlington Rd and N Prow Rd intersection

March 26, 2025 to May 23, 2025
Smithville will complete work on the south-west side of the Arlington and Prow intersection that may impact the main thru lane on Arlington Rd. The crew will be performing cable transfers on two poles on the south-west side. The work once started will take about 4 hours to complete.
Engineering
LINESTRING(-86.55279534161603 39.192496475032755,-86.55259955178109 39.192287174778954)

Winslow, Rogers Resurfacing Project (Allendale to Sare)

Winslow Rd from Allendale east, then east on Rogers Rd to Sare Rd

March 31, 2025 to July 15, 2025 daily until July 25, 2025
Winslow and Rogers Rd will be resurfaced from Allendale to Sare Rd. There are new curbs, curb ramps, and sidewalk being installed as well. There is also a median and rain garden being installed at Xavier Ct on Winslow Ave.
Engineering
LINESTRING(-86.51551749270192 39.13596711566274,-86.50934802393678 39.13601056246057,-86.50850382391799 39.13625262229468,-86.50812773400862 39.136147109263476,-86.50795969412214 39.136345722063936,-86.5081917494942 39.13651950815995,-86.5084718161752 39.13627744900657,-86.50811973222555 39.13613469588563,-86.50792768637935 39.13635192885292,-86.50714349942835 39.13644502849087,-86.50611925532218 39.136327102167286,-86.50398274688557 39.1359857356546,-86.49715712214058 39.135911255420865)

Longview Neighborhood Greenway Project

Longview Ave from Pete Ellis through to Smith Rd.

March 31, 2025 to July 11, 2025 daily until July 15, 2025
Along Longview Ave between Pete Ellis and through to Smith Rd, there will be new curbs installed as well as new curb ramps and sidewalk in areas. There is a multiuse path being installed along the north side of Longview between Pete Ellis and Kingston. There will also be asphalt speed humps installed. There may be time limited road closures when the speed humps are installed.
Engineering
LINESTRING(-86.4948113588396 39.16687841305256,-86.49211444628399 39.16686155054853,-86.49097260844732 39.16752761397052,-86.49009176145245 39.1677215298821,-86.49011351207203 39.16798289391835,-86.49011351207203 39.1677130985708,-86.48958065341932 39.16772996087067,-86.4887433060043 39.16762035633181,-86.48733184056242 39.167316835129554,-86.48605950730486 39.16719036752173,-86.4851134134292 39.16716507371555,-86.48441743674488 39.16718193614679,-86.48424344174413 39.16713134916259,-86.48421081747406 39.16700488122126,-86.4841890685138 39.166237637309706,-86.48139428480737 39.166254499963344)

Duke Energy Lane Closure

903 S Basswood Cir

March 31, 2025 to April 30, 2025
WO # 48543880, one day lane closure on the east side of S Basswood CIR to replace overhead equipment on PAD SG2 along east side of S Basswood Drive. No overnight closure. Work will be completed in 1 day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.57249525741292 39.1529961200132,-86.5724929131908 39.15272161892949)

Bloomingscapes Lane Closure

1001 N Jackson

April 1, 2025 to June 9, 2025
Lane closure on the north side of W 15th St adjacent to 1001 N Jackson St property for driveway installation at 1001 N Jackson St - driveway will be located on 15th Street. Lane closure will occur for up to 3 days in the date range of 4/1/25 to 6/9/2025.
External Project
LINESTRING(-86.53972641778974 39.17663136406301,-86.54009201738587 39.17663811201288)

Duke Energy Lane Closure

2425 S Walnut St

April 1, 2025 to August 31, 2025
WO # 40994471, single day lane closure for replacing pole # 151-161 and installing new pole # MNI-12336 along West side of S Walnut Street. No overnight closure. Work will take 1 day, but please allow up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.53042191860095 39.13757760681224,-86.53038739118523 39.137782399625735)

Kirkwood 2025 Pedestrian Season / Dining Closure

E kirkwood Ave

April 2, 2025 to November 14, 2025
Planned street closure of 1/2 of the 100 block, 300, 400, and 500 blocks of E Kirkwood from Walnut to Indiana.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53356764722223 39.16659167582003,-86.53296935044038 39.166583421954726),LINESTRING(-86.53104972965902 39.166569102177334,-86.52983561781902 39.166553457020115),LINESTRING(-86.52975826443308 39.16655345702014,-86.52829527648181 39.16654302691339),LINESTRING(-86.52820783352382 39.16654041938648,-86.52696345296756 39.16654302691339))

CBU - Signal Managed Lane Restriction

S Patterson Dr from W Allen St. to W 2nd St.

April 7, 2025 05:00 am to 17:00 pm May 7, 2025
CBU is repairing a water main on South Patterson Drive between W Allen St. and W 2nd St. Close to the site of the repair traffic will be restricted to one alternating lane managed by an automated traffic control signal. Repairs are expected to take four weeks beginning April 7th, 2025 to May 7th, 2025. Traffic signs will be in place alerting drivers. The repairs will divert but not impede sidewalk access.
Utilities
LINESTRING(-86.54710463034594 39.15937471890172,-86.54337917274196 39.15589525639385,-86.54333743092009 39.15572532474815)

Smithville Transfer on Pole Line - S Morton St

In front of 922 S Morton St and 1140 S Morton St

April 7, 2025 to June 20, 2025
Sometime between April 7th, 25 and June 20th, 25, Smithville will have a temporary lane closure in front of 2 poles along S Morton St to transfer cables along the pole line. The closures will take about a day total once begun. No sidewalks will be effected.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53636334100577 39.154037091060076,-86.53636664381396 39.153404480027774),LINESTRING(-86.53633209839722 39.15598653952267,-86.53631986645033 39.156362382269634))

Duke Energy Lane Restriction

1029 W Ralston

April 14, 2025 to May 16, 2025
WO # 48868802, two days of lane restrictions to replace pole 150-734 at the corner of S Rockport Rd and W Ralston Dr.
External Project
LINESTRING(-86.54668359083894 39.13834613532666,-86.5464679845154 39.138550017463814)

Duke Energy Pole Replacements

604 E Allendale Dr

April 15, 2025 to June 30, 2025
WO 42544972. 3 day lane closure on the east side of S Walnut Street Pike south of E Allendale Dr to replace two poles. Work will occur in the date range of 04/15/2025 to 05/31/2025
Engineering
LINESTRING(-86.52679450552313 39.131191988602694,-86.52679450552311 39.13032243600347)

DUke Energy Pole Installation

850 E Winslow Rd

April 15, 2025 to May 31, 2025
3 day lane closure on the south side of W Winslow Rd just west of S Highland Ave to install a new pole. Installing new pole on South side of E Winslow Road just before the intersection with S Highland Avenue. Work will occur between 04/15/2025 and 05/31/2025.
Engineering
LINESTRING(-86.51756930427086 39.13598672799296,-86.51887918836583 39.13597513707447)

Duke Energy Pole Installation

301 S Kirby Alley

April 15, 2025 to May 31, 2025
Lane restriction on S Kirby Alley between E 3rd St and E Smith Ave to install new pole # MNI-12532. Work and closure will take 1-2 hours and will occur in the date range of 04/15/2025 to 05/31/2025.
Engineering
LINESTRING(-86.52920139414442 39.16446607999734,-86.5291836510689 39.16351341521417)

Comcast Utility Relocation for Hub2 Development between E 19th St and E 17th St

N Washington St, E 19th St, N Lincoln St, and E 17th St

April 22, 2025 to May 5, 2025
Comcast will have temporary lane closures on the above streets as they relocate fiber facilities in the area. The work is expected to be complete by 5/5/25.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53220977308881 39.17989575698127,-86.53202523405244 39.18076317293381,-86.5319820440652 39.18126231270077,-86.5309219261967 39.18111013631807,-86.53094548437156 39.180422294958845),LINESTRING(-86.53096316787428 39.17902228919601,-86.53095531514931 39.179274909313136))

Road Closed for Utility Cut Repair

E 1st St from S Grant St to S Henderson St

April 24, 2025 10:30 am to 11:00 am
E 1st St from S Grant St to S Henderson St closed for utility cut repair.
Street
LINESTRING(-86.52986688125009 39.15934568002973,-86.52718352630217 39.15932224337277)

Duke Energy Lane Closure

1606 S Rogers St

May 1, 2025 to October 31, 2025
Lane restrictions for pole work
External Project
LINESTRING(-86.50848539581101 39.15037491562114,-86.50826085249109 39.13670205807966)

Duke Energy Lane Closure

1140 E Carnaby St

May 1, 2025 to August 31, 2025
WO #52890955. Replacing elbows on 4 separate pads in between S Westminster Way and Acadia Court S. Replacing 718' of underground cable. No work will actually be within the right of way other than the South side of E Winslow Road. We will need a lane restriction on E Winslow Road where we will have flaggers. No overnight closure.
External Project
LINESTRING(-86.52047007232942 39.135984600359905,-86.51980745163719 39.13598082114379)

Crosswalk Installation and Improvements

Liberty Dr, Kinser Pike, 11th St and Monroe, 11th St and Adams

May 1, 2025 to August 1, 2025 daily until April 11, 2025
There will be median crosswalks added at Liberty Dr near Aldis and on Kinser Pike in front of Krogers. The intersections of 11th St and Monroe and at 11th St and Adams, New curb ramps and sidewalk areas will be added. At all locations there will lane restrictions and travel time may be delayed. There shall be signage and possibly flaggers to help with directing traffic.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5770807335556 39.1473602584563,-86.5771723877233 39.146584299658485),LINESTRING(-86.55001470124252 39.17327519095343,-86.54953925078647 39.173249771223624),LINESTRING(-86.54739972154526 39.173224351242226,-86.54691607316073 39.17323706123406),LINESTRING(-86.5377739398966 39.18810360696472,-86.53771619682068 39.18693100963756))