Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St. Adams St along Fountain Dr., up Crescent Rd. to 17th St. April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
204 E 17th St Alley Paving 204 E 17th St December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)
Poplars Redevelopment Project 400 E 7th St February 17, 2025 to November 21, 2025
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52971398338842 39.16844890303665,-86.5283524160322 39.168441760864965),LINESTRING(-86.52975083230503 39.16849461292935,-86.52882039716067 39.16849461292935,-86.52869695334626 39.16847747171627,-86.52855324251527 39.16847604324985,-86.52842427130713 39.16849604134089,-86.52830266976989 39.168497469752396))
Duke 1-2 day closure of alleyway 1417 A S Walnut ST March 15, 2025 to August 31, 2025
Replacement of overhead equipment on pole # 151-247. 1-2 day closure of the alley between S Walnut St and S Washington St occuring between 03/15/2025 and 08/31/2025. No overnight closure.
Engineering
LINESTRING(-86.53311762861762 39.15075237627303,-86.53310396215177 39.15112095597746)
Duke Energy Lane Closure E Winslow, S Rogers, S Smith March 20, 2025 to June 30, 2025
1-2 Day lane and sidewalk closures to take place between 3/20/25 and 4/10/25 for pole work in three locations: -East side of S Rogers St between W Ralston Dr and W Graham Dr -South side of E Winslow Rd between E Allendale Dr and S Xavier Ct -West side of S Smith Rd between E 3rd St and Stonegate Dr
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.48078203954958 39.16126744620985,-86.48081416974918 39.162351142508044),LINESTRING(-86.51569032760239 39.13596333876856,-86.5135508405162 39.1360142881845),LINESTRING(-86.53866744088982 39.13973269385326,-86.5385725730021 39.138514521268604))
Cable Transfer on a Pole at Cory Ln and W 3rd St 301 S Cory Ln March 25, 2025 to June 6, 2025
Smithville will be move cables on a pole on W 3rd St in front of 301 S Cory Ln for 2-3 hours between 3/25/25 and 6/6/25. The work may include a sidewalk and lane closure while the crew is working on the pole.
Engineering
LINESTRING(-86.56008139915842 39.16433597396369,-86.55966362604971 39.16433597396369)
Winslow, Rogers Resurfacing Project (Allendale to Sare) Winslow Rd from Allendale east, then east on Rogers Rd to Sare Rd March 31, 2025 to July 15, 2025 daily until July 25, 2025
Winslow and Rogers Rd will be resurfaced from Allendale to Sare Rd. There are new curbs, curb ramps, and sidewalk being installed as well. There is also a median and rain garden being installed at Xavier Ct on Winslow Ave. A median at Spicewood Ln has been added to the project.
Engineering
LINESTRING(-86.51551749270192 39.13596711566274,-86.50934802393678 39.13601056246054,-86.50850382391799 39.13625262229468,-86.50812773400862 39.136147109263476,-86.50795969412214 39.136345722063936,-86.5081917494942 39.13651950815995,-86.5084718161752 39.13627744900657,-86.50811973222555 39.13613469588563,-86.50792768637935 39.13635192885292,-86.50714349942835 39.13644502849087,-86.50611925532218 39.136327102167286,-86.50398274688557 39.1359857356546,-86.49715712214058 39.135911255420865)
Longview Neighborhood Greenway Project Longview Ave from Pete Ellis through to Smith Rd. March 31, 2025 to July 25, 2025 daily until July 25, 2025
Along Longview Ave between Pete Ellis and through to Smith Rd, there will be new curbs installed as well as new curb ramps and sidewalk in areas. There is a multiuse path being installed along the north side of Longview between Pete Ellis and Kingston. There will also be asphalt speed humps installed. There may be time limited road closures when the speed humps are installed.
Engineering
LINESTRING(-86.4948113588396 39.16687841305256,-86.49211444628399 39.16686155054853,-86.49097260844732 39.16752761397052,-86.49009176145245 39.1677215298821,-86.49011351207203 39.16798289391835,-86.49011351207203 39.1677130985708,-86.48958065341932 39.16772996087067,-86.4887433060043 39.16762035633181,-86.48733184056242 39.167316835129554,-86.48605950730486 39.16719036752173,-86.4851134134292 39.16716507371555,-86.48441743674488 39.16718193614679,-86.48424344174413 39.16713134916259,-86.48421081747406 39.16700488122126,-86.4841890685138 39.166237637309706,-86.48139428480737 39.166254499963344)
Bloomingscapes Lane Closure 1001 N Jackson April 1, 2025 to June 9, 2025
Lane closure on the north side of W 15th St adjacent to 1001 N Jackson St property for driveway installation at 1001 N Jackson St - driveway will be located on 15th Street. Lane closure will occur for up to 3 days in the date range of 4/1/25 to 6/9/2025.
External Project
LINESTRING(-86.53972641778974 39.17663136406301,-86.54009201738587 39.17663811201288)
Duke Energy Lane Closure 2425 S Walnut St April 1, 2025 to August 31, 2025
WO # 40994471, single day lane closure for replacing pole # 151-161 and installing new pole # MNI-12336 along West side of S Walnut Street. No overnight closure. Work will take 1 day, but please allow up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.53042191860095 39.13757760681224,-86.53038739118523 39.137782399625735)
Kirkwood 2025 Pedestrian Season / Dining Closure E kirkwood Ave April 2, 2025 to November 14, 2025
Planned street closure of 1/2 of the 100 block, 300, 400, and 500 blocks of E Kirkwood from Walnut to Indiana.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53356764722223 39.16659167582003,-86.53296935044038 39.166583421954726),LINESTRING(-86.53104972965902 39.166569102177334,-86.52983561781902 39.166553457020115),LINESTRING(-86.52975826443308 39.16655345702014,-86.52829527648181 39.16654302691339),LINESTRING(-86.52820783352382 39.16654041938648,-86.52696345296756 39.16654302691339))
Smithville Transfer on Pole Line - S Morton St In front of 922 S Morton St and 1140 S Morton St April 7, 2025 to June 20, 2025
Sometime between April 7th, 25 and June 20th, 25, Smithville will have a temporary lane closure in front of 2 poles along S Morton St to transfer cables along the pole line. The closures will take about a day total once begun. No sidewalks will be effected.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53636334100577 39.154037091060076,-86.53636664381396 39.153404480027774),LINESTRING(-86.53633209839722 39.15598653952267,-86.53631986645033 39.156362382269634))
Duke Energy Pole Replacements 604 E Allendale Dr April 15, 2025 to June 30, 2025
WO 42544972. 3 day lane closure on the east side of S Walnut Street Pike south of E Allendale Dr to replace two poles. Work will occur in the date range of 04/15/2025 to 05/31/2025
Engineering
LINESTRING(-86.52679450552313 39.131191988602694,-86.52679450552311 39.13032243600347)
Crosswalk Installation and Improvements Liberty Dr, Kinser Pike, 11th St and Monroe, 11th St and Adams May 1, 2025 to August 1, 2025 daily until April 11, 2025
There will be median crosswalks added at Liberty Dr near Aldis and on Kinser Pike in front of Krogers. The intersections of 11th St and Monroe and at 11th St and Adams, New curb ramps and sidewalk areas will be added. At all locations there will lane restrictions and travel time may be delayed. There shall be signage and possibly flaggers to help with directing traffic.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5770807335556 39.1473602584563,-86.5771723877233 39.146584299658485),LINESTRING(-86.55001470124252 39.17327519095343,-86.54953925078647 39.173249771223624),LINESTRING(-86.54739972154526 39.173224351242226,-86.54691607316073 39.17323706123406),LINESTRING(-86.5377739398966 39.18810360696472,-86.53771619682068 39.18693100963756))
Duke Energy Lane Closure 1606 S Rogers St May 1, 2025 to October 31, 2025
Lane restrictions for pole work
External Project
LINESTRING(-86.50848539581101 39.15037491562114,-86.50826085249109 39.13670205807966)
Duke Energy Lane Closure 1140 E Carnaby St May 1, 2025 to August 31, 2025
WO #52890955. Replacing elbows on 4 separate pads in between S Westminster Way and Acadia Court S. Replacing 718' of underground cable. No work will actually be within the right of way other than the South side of E Winslow Road. We will need a lane restriction on E Winslow Road where we will have flaggers. No overnight closure.
External Project
LINESTRING(-86.52047007232942 39.135984600359905,-86.51980745163719 39.13598082114379)
Thornton/Arden Greenway and S Washington Traffic Calming Project Thornton Dr from Olive St to High St. S Washington St from 1st St to Grimes Ln. May 8, 2025 to August 11, 2025 daily until August 6, 2025
Thornton Dr will have new curbs and new curb ramps placed throughout. There will also be asphalt speed humps installed. Along S Washington St, there will be asphalt speed humps installed. When speed humps are being installed, there may be a limited time road closure.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53240062752748 39.15925941146645,-86.53244565087843 39.1534523969822),LINESTRING(-86.51876942440383 39.150406906903584,-86.51870939365088 39.148265429400965,-86.5142521277056 39.148207236172965,-86.51341169945431 39.14840509304068,-86.51338168465034 39.147636939814646,-86.51203099786146 39.14766021783302,-86.51191093635556 39.14735760920948,-86.51081537998047 39.14761366267649,-86.50979486061533 39.14760202321659,-86.50922457017978 39.147299415230805,-86.50845918237343 39.147276137981095))
Duke Energy Lane Closure 594 594 E Graham PL May 14, 2025 to August 31, 2025
WO # 55906571, 1 day lane closure of S Henderson street to Replace 2 poles on West side of S Henderson Street, and replacing 1 pole on on east side of S Henderson St. No overnight closure. Work should take 1 day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.52700331931196 39.141169823515156,-86.5269853151809 39.13982928346135,-86.52696731139316 39.13857668280437)
Duke ENergy Pole Replacement E Miller Dr near S Park Ave May 15, 2025 to June 26, 2025
Single-day of lane closures along the northern lane of E Miller Dr near S Park Ave to replace 4 poles. Work will occur in the date range of 05/15/2025-06/26/2025.
Engineering
LINESTRING(-86.52402076872254 39.146909037031975,-86.52545362228012 39.14698241948852)
Duke Energy Overhead Equipment 2400 S Walnut St May 15, 2025 to July 30, 2025
1 day lane closure of the western most lane of S Walnut St near 2400 S Walnut St to install overhead equipment on a pole. Work will occur in the date range 05/15/2025 to 07/30/2025.
Engineering
LINESTRING(-86.53050441163788 39.138834215157345,-86.53040407923476 39.13826589374628)
Duke Energy Overhead Equipment 2400 S Walnut St May 15, 2025 to June 30, 2025
1 day lane closure of the western most lane of S Walnut St near 2400 S Walnut St to install overhead equipment on a pole. Work will occur in the date range 05/15/2025 to 06/30/2025.
Engineering
LINESTRING(-86.53050441163788 39.138834215157345,-86.53040407923476 39.13826589374628)
Milling and Resurfacing on S Bainbridge Dr S Bainbridge Dr May 22, 2025 06:00 am to 16:00 pm June 12, 2025
Lane Restrictions and No Parking on S Bainbridge Dr from E Allendale Dr to the dead end for milling and resurfacing.
Street
LINESTRING(-86.51967728177794 39.130709052786756,-86.51972357429119 39.13026467150348,-86.51969464147041 39.130085122714945,-86.51947475203248 39.1294566983502,-86.51930694167197 39.12897639880515,-86.51930115510781 39.12879235792454,-86.51929536854367 39.128693604083054,-86.51919699695301 39.12850956246348,-86.51905233284911 39.128383875227456,-86.5188324434112 39.12828512081316,-86.51850260925433 39.128258187767045,-86.51794131253122 39.12825369892505,-86.51774456934993 39.12827165429141,-86.51733372329487 39.12835694221911,-86.51709068760033 39.128392852894564,-86.51692866380398 39.128392852894564,-86.51648888492814 39.12835245338337,-86.51630371487516 39.128307565010374,-86.51617062389958 39.12822676586691,-86.51608382543725 39.12811005582938,-86.51603753292402 39.12794845699665,-86.51607225230894 39.12773748018472,-86.51607803887309 39.12766565814712,-86.51612433138634 39.1275220138522,-86.51621112984867 39.12744570270138)
AT&T Lane Closure 116 E 3rd St May 26, 2025 to June 30, 2025
BORE 57' OF INNERDUCT FROM P.169-288-BLM TO OUTSIDE OF RIGHT OF WAY. ALL WORK WILL TAKE APPROX. 1-2 DAYS TO COMPLETE. SIDEWALKS WILL NOT BE AFFECTED. A TEMPORARY LANE CLOSURE MAY BE UTILIZED. WORK PLANNED BETWEEN 5/20/25 AND 5/30/2025.
External Project
LINESTRING(-86.53238534327707 39.16438196267569,-86.5323880254861 39.164265504053134)
CBU Road Closing for Sewer Repair Both lanes of N Dunn St will be CLOSED between E Cottage Grove Ave & E 11th St beginning Mon. June 2 - Fri, June 6, 2025. June 2, 2025 to June 6, 2025 every 5 days until June 13, 2025
Both lanes of N Dunn St between E Cottage Grove & E 11th will be closed 24 hrs a/day between 6/2 & 6/6/25 for sewer repairs.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52828517141738 39.17264063461488,-86.52828517141738 39.17264063461488),LINESTRING(-86.52828517141738 39.172645399060855,-86.52830360857763 39.17340294186644),LINESTRING(-86.52829746285755 39.17339341307681,-86.52829746285755 39.17339341307681))
COB Utilities Lane and Sidewalk Restrictions 1501 S Rogers St June 2, 2025 to June 16, 2025
CBU project to update 24" sewer line that will require street and sidewalk cuts on the west side of S Rogers St adjacent to 1501 S Rogers. The work is expected to take 1-2 weeks and will require a stationary lane closure of the southbound traffic lane on S Rogers. Southbound traffic will be detoured to S Walnut St via Grimes ln to the north and Country club to the south. Sidewalk closures are also required on the west side of S Rogers.
Utilities
LINESTRING(-86.53876075802393 39.15377797688896,-86.53882865001296 39.15037499513218)
Kinser Ridge Subdivision Road Closure W Acuff Rd between entrance to Rosewood and entrance to the Cook building June 2, 2025 to June 6, 2025
Kinser Ridge Subdivision will have W Acuff Rd closed between the Cook entrance drive and the entrance into N Rosewood Dr from June 2nd, 2025 to June 6th, 2025. The work is for sanitary sewer installation for the Kinser Ridge Subdivision.
Engineering
LINESTRING(-86.55111883524721 39.20836505373646,-86.54947547911765 39.20835776699431)
No Parking for Curb Ramp Replacement The Intersection of S Washington St and E Driscoll St June 3, 2025 06:00 am to 16:00 pm June 14, 2025
No Parking posted on S Washington St for curb ramp replacement at the intersection of S Washington St and E Driscoll St. This project will be completed by Groomer Construction.
Street
LINESTRING(-86.53248721633189 39.15261487899002,-86.53249287265518 39.15227932687941)
Duke Energy Lane Closure 1320 W Arlington RD Bloomington, IN 47404 June 3, 2025 to June 17, 2025
-Work orders 57708547/57708571 -1210 W ARLINGTON RD -Install two spans of wire over W Arlington Rd. Install one pole on the east side of W Arlington Rd -Close southbound lane of W Arlington Rd, close sidewalk on west side of W Arlington Rd. -Work will take one day between 6/3 and 6/17
External Project
LINESTRING(-86.54985378366766 39.18205998606382,-86.5491886926745 39.181002860345245)
No Parking for Curb Ramp Replacement The Intersection of S Washington St and E Wilson St June 3, 2025 06:00 am to 16:00 pm June 14, 2025
No Parking posted on S Washington St for curb ramp replacement at the intersection of S Washington St and E Wilson St. This project will be completed by Groomer Construction.
Street
LINESTRING(-86.53251578852547 39.151638405298,-86.53252327443325 39.15124558874871)
No Parking for Curb Ramp Replacement The Intersection of S Washington St and E Davis St June 3, 2025 06:00 am to 16:00 pm June 14, 2025
No Parking posted on S Washington St for curb ramp replacement at the intersection of S Washington St and E Davis St. This project will be completed by Groomer Construction.
Street
LINESTRING(-86.53248228910167 39.15438244236029,-86.53248228910167 39.15401101687286)
Milling and Resurfacing on E Woods Edge Way E Woods Edge Way June 9, 2025 06:00 am to 16:00 pm June 26, 2025
Lane Restrictions and No Parking on E Woods Edge Way from S Jamie Ln to S Woods Edge Bend for milling and resurfacing.
Street
LINESTRING(-86.51760858243529 39.12550029968634,-86.51739485108445 39.12562925935333,-86.5173057963549 39.12565228784047,-86.51719299369752 39.1256753163201,-86.51627869847445 39.12572597894871)
Milling and Resurfacing on S Woods Edge BND S Woods Edge Bend June 9, 2025 06:00 am to 16:00 pm June 26, 2025
Lane Restrictions and No Parking on S Woods Edge Bend from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51774500154046 39.126579157740764,-86.51761424950098 39.12655149463009,-86.51733491559845 39.12656071566818,-86.51714473081377 39.12657454722304,-86.51700803549976 39.12656993670507,-86.51681190744053 39.12653305255026,-86.51658011973419 39.12644084207875,-86.51643153787111 39.12632096828534,-86.51630078583165 39.12615037830449,-86.51624135308641 39.12596595623884,-86.51622352326285 39.12570315396101,-86.51618786361574 39.12522365254145,-86.51616409051763 39.12506228113736,-86.5160987144979 39.124933183747856)
Curb Ramp Replacement The Intersection of E Allendale Dr and S Sowders Sq June 9, 2025 06:00 am to 16:00 pm June 19, 2025
Lane Restrictions at times during curb replacements at the intersection of E Allendale Dr and S Sowders Sq. Signage will be in place.
Street
LINESTRING(-86.5219714009742 39.13088792496356,-86.52219749415531 39.13085138705725)
Curb Ramp Replacement The Intersection of S Allendale Dr and E Bradshire St June 9, 2025 06:00 am to 16:00 pm June 19, 2025
Lane Restrictions at times during curb replacements at the intersection of S Allendale Dr and E Bradshire St. Signage will be in place.
Street
LINESTRING(-86.51590998709439 39.13547332446399,-86.5159153515124 39.135308967066834)
Curb Ramp Replacement The Intersection of E Bradshire St and S Uppington Ct June 9, 2025 06:00 am to 16:00 pm June 19, 2025
Lane Restrictions at times during curb replacements at the intersection of E Bradshire St and S Uppington Ct. Signage will be in place.
Street
LINESTRING(-86.51482213600124 39.13540486564315,-86.51464543752641 39.135407553041716)
Milling and Resurfacing on E Benson Ct E Benson Ct June 9, 2025 06:00 am to 16:00 pm June 19, 2025
Lane Restrictions and No Parking on E Benson Ct from S Jamie Ln to the Dead End on the east side of Jamie Ln for milling and resurfacing.
Street
LINESTRING(-86.51755142145535 39.12387392083869,-86.5170520843082 39.12396116797947,-86.51689463565822 39.12397512751198,-86.51669220167966 39.12396465786287,-86.51647627210251 39.12389835004899,-86.51629633078824 39.12380063315692,-86.51609839534251 39.12359472926201,-86.51599942761968 39.1234132541438)
North Dunn Street Sidewalk Connection N Dunn Street just North of E 17th Street June 9, 2025 to August 8, 2025 weekly on Monday, Tuesday, Wednesday, Thursday and Friday until August 8, 2025
Intermittent flagging for 400ft of N Dunn Street.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52832464277255 39.18017332723048,-86.52832069195294 39.179083058180424),LINESTRING(-86.52832069195294 39.179083058180424,-86.52831674113335 39.179079995603104))
Milling and Paving on W 6th St W 6th Street June 11, 2025 06:00 am to 16:00 pm June 14, 2025
Lane Restrictions and No Parking on W 6th St from N Elm St to N Rogers St for milling and paving by Lentz Paving.
Street
LINESTRING(-86.54524824990293 39.1676186724589,-86.54352670441085 39.16762893951133,-86.54212960403073 39.1676186724589,-86.54048751448444 39.16760840540499,-86.53869313437541 39.167598138349575)
Duke Energy Lane Closure 1890 S Walnut St June 15, 2025 to July 31, 2025
WO # 42544990 Replacing pole # 765-566 along E side of S Walnut Street. Lane restriction only, no full road closure required. Traffic flaggers will be on site. No overnight closure. Work should be completed within 1 working day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.5323193519817 39.145937156670215,-86.53225102200278 39.14570711999781)
Duke Energy Lane Closure 610 E Hillside Dr June 15, 2025 to August 31, 2025
WO # 42544905, lane closure for Installing pole # MNI-20134 along S side of E Hillside Drive. No overnight closure. Work should take one day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.52583520938855 39.150527338880664,-86.52511243758103 39.150510307008716)
Duke Energy Lane Closure 911 S High St June 15, 2025 to August 31, 2025
WO # 42544987, Lane closure for Installing new pole # MNI-12597 along E side of S High Street. No overnight closure. Work should only take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50840960956891 39.15771569950863,-86.50840960956891 39.15735330989088)
Milling and Resurfacing on S Sowders Sq S Sowders Sq June 16, 2025 06:00 am to 16:00 pm June 26, 2025
Lane Restrictions and No Parking on S Sowders Sq from E Allendale Dr to E Allendale Dr for milling and resurfacing.
Street
LINESTRING(-86.52324677964248 39.13061164212803,-86.52326083817186 39.12917212351644,-86.52205180464624 39.12917212351644,-86.52209398023433 39.130829748441755)
Taycon Lane and Sidewalk Closure for Utility Updates 317 E 10th St June 17, 2025 to June 20, 2025
1-3 day, daily lane and sidewalk closures on the north side of E 10th St for street cut for sewer and water updates adjacent to 317 E 10th St Asphalt 6'x3'=18sqft, 3'x14'=42sqft. 60sqft asphalt total. sidewalk 5'x6'=30sqft
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53037869873712 39.1716950749998,-86.53020461262189 39.171696313177904),LINESTRING(-86.53038029585744 39.17173964939772,-86.53021898670481 39.17173841122039))
CBU Road Closing S Woodlawn between E Maxwell & E 1st June 17, 2025 every 5 days until June 26, 2025
Closing NB Lane of S Woodlawn between E Maxwell & E 1st at 7am to 3pm.
Utilities
LINESTRING(-86.52264299516726 39.159240402899115,-86.52264299516726 39.1578095075933,-86.52264299516726 39.158574873818736,-86.52263319694748 39.15856305325303)
Lane restriction Eastern lane of N Walnut S. @ 2038 June 17, 2025 to June 18, 2025
Lane restriction
Engineering
LINESTRING(-86.53425475499124 39.18403869128912,-86.53429424465948 39.1841258098022,-86.53437626158573 39.184551982566035,-86.53433980967414 39.18455669165718,-86.53424564205505 39.18403869128912)
Taycon Lane and Sidewalk Closures for Utility Updates 621 W 10th St June 17, 2025 to June 20, 2025
1-3 day daily lane and sidewalk closures for street cut for sewer and water updates adjacent to 321 E 10th St. Asphalt 6'x3'=18sqft, 3'x14'=42sqft. 60sqft asphalt total. sidewalk 5'x6'=30sqft
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53018404292357 39.17173557558314,-86.53003383921872 39.17173557558314),LINESTRING(-86.53017867850552 39.17170438458956,-86.5300284748007 39.17170334488952))
CBU will close a portion of E Wylie Street E Wylie St from S Woodlawn Ave to S Hawthorne Dr. June 17, 2025 05:30 am to 16:00 pm
CBU will close a portion of E Wylie St from S Woodlawn Ave to S Hawthorne Dr for scheduled infrastructure maintenance on June 17th from 5:30am to 4:00pm
Utilities
LINESTRING(-86.52261056135907 39.15855250615641,-86.5202298080645 39.1585320595116)
CBU Road Closing for Sewer Repair 1000 Block of E Wylie between S Woodlawn & S Hawthorne 7am to 3 pm. June 17, 2025 every 5 days until June 26, 2025
Northbound lane of S Woodlawn closed from E Maxwell -S Hawthorne. 1000 Blk of E Wylie between E Maxwell-E 1st 7a-3pm.
Utilities
LINESTRING(-86.52265323032823 39.158550041080645,-86.52021277143065 39.158550041080645)
Lane restriction Northbound eastern lane of S Clarizz BLVD @ 487 June 18, 2025
Lane restriction for utility work
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.49064145445202 39.161745514605,-86.49066598092658 39.161745514605,-86.49066598092658 39.16164916147889,-86.4906332789605 39.16164916147889,-86.49063654908525 39.16174424679792),LINESTRING(-86.49063654908525 39.16174424679792,-86.49064799488117 39.16174678241208),LINESTRING(-86.49064799488117 39.16174424679792,-86.49066107573945 39.161745514605))
Poplars Redevelopment Investigatory Street Cut 400 E 7th St June 18, 2025 to June 26, 2025
FAW is requesting the temporary closure of a section at the 200 block of Dunn for one day, 6/18/2025. This is to perform an investigation of the existing water line that will tie into the future Poplars water vault. This will be four spots on the East side of N Dunn Street (see attached markup for specifics). This will just be investigation. This will be two spots to the north and two spots to the south of the alley bisecting Dunn and Indiana. This will be a one-day duration, 6/18. A 2' x 2' section of the road will be excavated and hydro-vac'd to examine the water main.
External Project
LINESTRING(-86.5282724685448 39.16848672230486,-86.5282690896745 39.167966727579966)
Due to a main break portion of N Kinser Pike is under a lane restriction Northbound lane of N Kinser Pike from the Bloomington High School Entrance to W Clubhouse Drive June 20, 2025 14:30 pm to 22:30 pm
Due to a main break portion of N Kinser Pike is under a lane restriction. Northbound lane of N Kinser Pike from the Bloomington High School Entrance to W Clubhouse Dr
Utilities
LINESTRING(-86.5428699070906 39.20083976300535,-86.54304255730912 39.20095781532021,-86.54337770185093 39.20104045182259,-86.54369253460233 39.201028646613906,-86.5472724876625 39.20101290633261)
Taycon Street Cuts for Utility Updates 415 E 10th St June 21, 2025 to June 25, 2025
1-3 day daily lane and sidewalk closures for street cut for sewer and water updates adjacent to 415 E 10th St. Asphalt 6'x3'=18sqft, 3'x14'=42sqft. 60sqft asphalt total. sidewalk 5'x6'=30sqft
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52871680297679 39.17169028332913,-86.52853267816009 39.17168889746509),LINESTRING(-86.52872216583553 39.171727701647654,-86.52853267816009 39.171726315784355))
EXTENSION: CBU will close N Indiana Ave from E Cottage Ave. to E 11th St. N Indiana Ave from E Cottage Ave. to E 11th St. June 23, 2025 to July 11, 2025
CBU will close N Indiana Ave from E Cottage Ave to E 11th St. starting June 23rd to July 11th for scheduled infrastructure maintenance. This is an extension of the previous end date of July 3rd.
Utilities
GEOMETRYCOLLECTION(POINT(-86.52696696219864 39.17255373382051),LINESTRING(-86.52696503192871 39.17255046662339,-86.52698632063579 39.17346148209842))
Milling and Resurfacing on E Bradshire St E Bradshire St June 23, 2025 06:00 am to 16:00 pm July 3, 2025
Lane Restrictions and No Parking on E Bradshire St from Dead End to E Bradshire Ct for milling and resurfacing.
Street
LINESTRING(-86.51693545698139 39.13542588373531,-86.51350901089478 39.13540549183054)
lane closure 921 Lindbergh DR June 23, 2025 to July 14, 2025
-WO 57851741 -921 N Lindbergh Dr -Bore new electrical service under N Lindbergh Dr -Close Northbound lane of N Lindbergh Dr, close sidewalk on east side of N Lindbergh Dr, close parking lane on east side of N Lindbergh Dr -Close for two days (no overnight closure) between 6/23-7/14 2025 -Total bore length is 104 ft
Engineering
LINESTRING(-86.55254001893981 39.176088294497816,-86.55250960056884 39.175030079494974)
Milling and Resurfacing on S Bradshire Ct S Bradshire Ct June 23, 2025 06:00 am to 16:00 pm July 3, 2025
Lane Restrictions and No Parking on S Bradshire Ct from E Bradshire St to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51352100952201 39.13543898750359,-86.51351126932241 39.134528598587394,-86.51340899722665 39.13432838699788)
Milling and Resurfacing on S Uppington Ct S Uppington Ct June 23, 2025 06:00 am to 16:00 pm July 3, 2025
Lane Restrictions and No Parking on S Uppington Ct from E Bradshire St to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51473386976328 39.1353842898198,-86.51472296710593 39.13493608223331)
Road Closed for Tree Removal E Dodds St from S Washington St to S Lincoln St June 24, 2025 06:00 am to 16:00 pm
E Dodds St from S Washington St to S Lincoln St closed for Tree Removal
Street
LINESTRING(-86.53243023526635 39.15740951371356,-86.53131575147636 39.15739846273527)
QC Communications Boring work 2219 S Rogers St June 24, 2025 to August 25, 2025
Using a mechanized bore machine to replace 52ft of coaxial cable in pipe crossing S Roger St just north of W Jud St. A lane closure and sidewalk closure are needed. Time frame of project 06/24/2025 to 08/25/2025. Construction should take no more than 2 days once started. Comcast JB0002250437
External Project
LINESTRING(-86.53892126020372 39.1430532630003,-86.53892437982152 39.14336537640227)
ROW2025-06-1658 (523 W 7th ST Bloomington, IN 47404) June 24, 2025 to June 27, 2025
523 W 7 St . Sewer tie in in 7st .. Closure of east bound lane of 7 St at property address. Work dates are 06/24-06/27/2025 ,2 days . 4'x4' pavement replacement MUST NOT CLOSE SIDEWALK. NOTIFY BLOOMINGTON ENG OF OF ANY SCOPE CHANGES
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53979776384965 39.16859879955237,-86.53975604063469 39.16861843919145,-86.53962491034342 39.16861612863852,-86.53958914761112 39.16859648899876,-86.5397962737699 39.16860111007415),LINESTRING(-86.53978882320749 39.1686022653509,-86.53979031328724 39.16860111007415))
HARRELL FISH INC 300 N WASHINGTON ST June 25, 2025
12 RESIDENTIAL SPACES
Public Works
GEOMETRYCOLLECTION(POINT(-86.53229501425442 39.16897635336923),POINT(-86.53229501425442 39.16897635336923),POINT(-86.53227550537478 39.1687192532367),POINT(-86.53227550537478 39.1687192532367),LINESTRING(-86.53227550537478 39.16873437724789,-86.5322364928542 39.169324192870704),LINESTRING(-86.5322364928542 39.169324192870704,-86.5322364928542 39.169324192870704))
Lane Restrictions for Utility Cut Repairs at the Intersection of E Hillside Dr and S High St E Hillside Dr and S High St June 25, 2025 01:30 am to 08:00 am
Lane Restrictions at the intersection of E Hillside Dr and S High St for a Utility Cut repair. The Traffic Signal will be placed in a 4-Way flash and signage will be in place.
Street
LINESTRING(-86.50846590448401 39.15049928481801,-86.50846724558853 39.150445204097394,-86.5083921437361 39.15044208405456,-86.50839080263161 39.15049824480454,-86.5084645633795 39.15050136484487)
Utility Cut Repairs at N Eagleson Ave and E 7th St N Eagleson Ave and E 7th St June 25, 2025 09:30 am to 13:00 pm
Lane Restrictions at the intersection of N Eagleson Ave and E 7th St for a Utility Cut repair. Signage will be in place.
Street
LINESTRING(-86.51618110874654 39.168882018037124,-86.51611539462566 39.16884770655122)
Road Closure for Crane Use for the AT&T Building 301 N Washington St June 25, 2025
The AT&T Building will have a crane setup on N Washington St between E 7th St and E 8th St in order to lift equipment up and into the building. The eastern sidewalk of N Washington St will be open, but the roadway and western sidewalk will be closed. The work is expected between 7 am and 4 pm.
Engineering
LINESTRING(-86.53231531064031 39.16946483031563,-86.53232925059166 39.1686056381686)
ROW2025-06-1702 840 S Woodscrest Dr. June 26, 2025 to June 27, 2025
Sewer repair, cutting portion of street, lane restriction only. 1-2 days
Engineering
LINESTRING(-86.50224743494935 39.158384887384045,-86.50222665468533 39.158391601231074,-86.50218682562404 39.1583110352457,-86.50221106939222 39.158305664161986,-86.50224916679656 39.15838757292292)
Road Closed for Tree Removal E 1st St from S Park Ave to S Woodlawn Ave June 26, 2025 07:30 am to 12:00 pm
E 1st St from S Park Ave to S Woodlawn Ave
Street
LINESTRING(-86.5237286018697 39.15931438839999,-86.52267464785467 39.1593038661417)
Milling and Resurfacing on E Hagan St E Hagan St from S Smith Rd to S Park Ridge Rd June 27, 2025 06:00 am to 18:00 pm June 28, 2025
Lane Restrictions and No Parking on E Hagan St from S Smith Rd to S Park Ridge Rd for milling and paving by E&B Paving.
Street
LINESTRING(-86.48075113774034 39.16295080651685,-86.47628104351874 39.16294405037419)
Milling and Resurfacing on S Smith Rd S Smith Rd from E 3rd St to E Moores Pike June 27, 2025 06:00 am to 18:00 pm July 1, 2025
Lane Restrictions on S Smith Rd from E 3rd St to E Moores Pike for milling and paving by E&B Paving.
Street
LINESTRING(-86.4812335537507 39.164170625484644,-86.48085434755804 39.163325331401666,-86.48072794549381 39.16104666197276,-86.48064894420365 39.15732222615446,-86.48055414265546 39.153916155019004,-86.48045934110726 39.15030161864959)
Bloomington Convention Center Site Preparation 302 S Walnut st June 27, 2025 to January 26, 2026
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
External Project
LINESTRING(-86.53447106427768 39.16454766952046,-86.53368078602708 39.16453847855911)
Paving on E Winslow Rd E Winslow Rd June 30, 2025 06:00 am to 16:00 pm July 1, 2025
Lane Restrictions and No Parking on E Winslow Rd from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51258640217146 39.13614420134823,-86.51027362129034 39.13612458391765)
QC Communications Lane and Sidewalk Closures for Underground Boring Work 2651 S Twin Oaks VLY June 30, 2025 to July 2, 2025
Using mechanized bore machine to replace 221ft of coaxial cable in pipe. Starting at NW corner of 2651 S Twin Oaks Vly, boring south along east side of road to SW corner of 1139 W Pine Meadows Dr, crossing W Pine Meadows Dr on route. Expected start date 06/30/2025. Construction should take approx 2 days once stated. Lane restriction on S Twin Oaks Vly and a side walk closure. Comcast JB0002263124
External Project
LINESTRING(-86.5504354699702 39.139248990647275,-86.55036962371906 39.13951191270888,-86.5504013274696 39.1398561688878)
Lineal Lane and Sidewalk Closures for Boring Work 1320 W Bloomfield Rd July 1, 2025 to July 31, 2025
bore 1347' of innerduct from 1310-1400 w Bloomfield rd. bore 35' of innerduct at w 3rd St and s landmark Ave. bore 50' of innerduct under w ross ct. bore 50' of innerduct under s timothy ct. bore 877' of innerduct from s Christopher ln and w Allen St to 1911 s Christopher ln and place new handhole. bore 464' of innerduct from 1400-1412 s beech tree ln and place 2 handholes. bore 214' of innerduct along s Cory ln and place 1 handhole. each road will take 1-3 days to complete. project to take place between 7/1/25-07/31/25. project includes lane and sidewalk closures.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5508819535982 39.16038951038598,-86.55160417460499 39.16042979246578,-86.55210888541487 39.16039364431538,-86.55241900881276 39.160332349538805,-86.55251022160414 39.16030405964699,-86.55299263598482 39.16022233318225),LINESTRING(-86.55299433606473 39.16022425752843,-86.55317676164749 39.160191252552835,-86.55384160145628 39.16000579594953),LINESTRING(-86.55383754761631 39.16000736759386,-86.55413348257426 39.1599052090823,-86.55463616646412 39.15967888819506,-86.55528073691836 39.15929854165833),LINESTRING(-86.5585938088187 39.15675718233618,-86.5585673253609 39.1566853067641),LINESTRING(-86.55757129321621 39.15659119662138,-86.55757249708492 39.156472648285586))
CBU road closure - South Washington ST South Washington ST from East 3RD St. to East 2ND St July 1, 2025 03:00 am to 06:00 am
Starting at 3:00AM until 6:00AM Tuesday July 1st, South Washington St. will be closed to all traffic starting at E 3RD St. and ending at East 2ND St. CBU will be posting No Parking signs on the West side of the 400 block of South Washington St. Crews will be inspecting underground storm drain networks
Utilities
LINESTRING(-86.53235748937597 39.164549864410134,-86.5323919370023 39.161420453123014)
Duke Energy Lane Closures 315 E North Dr July 1, 2025 to November 30, 2025
WO #46704275, 1-2 days of lane closures per location Sheet 1 - Replacing overhead equipment on pole # 765-564 on E side of S Walnut Street. Replacing pole # 161-169 on E side of S Walnut Street Sheet 2 - Replacing pole # 164-173 on S side of E North Drive. Replacing pole # 164-174 on N side of E North Drive. Replacing overhead equipment on pole # 164-172 on N side of E North Drive. Sheet 3 - Replacing pole #'s 174-456, 174-458, and 764-768 on N side of E North Drive. No overnight closures. Please allow 3 business days in case of inclement weather.
External Project
LINESTRING(-86.53185312871959 39.14429073792101,-86.53178652543639 39.144056304423316,-86.5313971523961 39.14415166729623,-86.53115635591067 39.144270870705725,-86.53093092941367 39.14441788796606,-86.53072087290509 39.14451325034912,-86.53053130971445 39.14455695806484,-86.52997799013089 39.14458874547742,-86.5291428874261 39.14459669232832,-86.5273804620859 39.14458874547742)
CBU will close the intersection at East Atwater Ave & South High St Intersection at East Atwater Ave & South High St July 1, 2025 22:00 pm to 06:00 am July 2, 2025
CBU will close the intersection at East Atwater Ave & South High St for repairs to infrastructure
Utilities
POINT(-86.50847515055187 39.16308730523187)
Utility Cut Repair at The Intersection of N Eagleson Ave and E 7th St N Eagleson Ave and E 7th St July 2, 2025
Lane Restrictions at the intersection of N Eagleson Ave and E 7th St for a utility cut repair.
Street
LINESTRING(-86.5161943165138 39.16888598583719,-86.51609499502226 39.1688406901049)
Milling and Resurfacing on Grant St Grant St from E 3rd St to E 10th St July 2, 2025 06:00 am to 18:00 pm July 7, 2025
Lane Restrictions and No Parking on Grant St from E 3rd St to E 10th St for milling and paving by Milestone.
Street
LINESTRING(-86.52984447388664 39.164676842565655,-86.52980970358826 39.1665777977249,-86.5297862193574 39.16858971210186,-86.52977447724197 39.170565155739524,-86.52976273512655 39.17166664629798)
JDH Fiber Boring 1900 S Walnut St July 3, 2025 to July 18, 2025
Lane and shoulder closures on the west side of S Walnut St from E Burks Dr to E Miller Dr for Boring 7500' of 1.5"Duct and tracer wire. 8 Hand Holes will also be installed along the route.
External Project
LINESTRING(-86.53151740173263 39.14288829093434,-86.53122548417792 39.14191523093959,-86.53042887926863 39.13840162013929,-86.53042266835763 39.13799695693268,-86.5304537233864 39.137688641037585,-86.53047235659321 39.137558569519825,-86.53094473496792 39.136437682224255,-86.53116215455593 39.13589313683292,-86.53143543890384 39.13472727445571,-86.5314354389039 39.13329255762258,-86.53145876540121 39.131985581787376,-86.53141463633257 39.1294161856589,-86.53140259554154 39.126694591414065,-86.53280007183596 39.12671868242569)
Smithville Boring Work 400 S Lincoln July 3, 2025 to August 1, 2025
2 days of lane and sidewalk closures to occur between 7/3/25 and 8/1/25 at the intersection of Smith Ave. and Lincoln St. Smithville will be relocating a fiber due to the Jordan Culvert. Boring along Smith Ave. for about 120'. Closure of the south side sidewalk and the north side sidewalk when crews are boring. Sidewalk Reconstruction will also be needed. Night time lane closure of Westbound Smith Ave during splicing.
External Project
LINESTRING(-86.53359174409282 39.162855480422735,-86.53301838261233 39.16284679195516,-86.5324114036435 39.1628424477486)
Paving Grant from 3rd to 10th Paving Grant from 3rd to 10th July 3, 2025 to July 9, 2025
Milestone will be milling Grant from 3rd to 10th on 7/3/25; they will return to pave 7/8/25 & 7/9/25; they will pave block by block and if you need access the closed block you can let the flagger know; there will be No Parking on Grant from 3rd to 10th during milling and paving
Public Works
LINESTRING(-86.52974181582599 39.171671639082206,-86.52974458185408 39.171622578197656,-86.52981239145069 39.16460216512627)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.