Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
204 E 17th St Alley Paving
204 E 17th St
December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)
Poplars Redevelopment Project
400 E 7th St
February 17, 2025 to November 21, 2025
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52971398338842 39.16844890303665,-86.5283524160322 39.168441760864965),LINESTRING(-86.52975083230503 39.16849461292935,-86.52882039716067 39.16849461292935,-86.52869695334626 39.16847747171627,-86.52855324251527 39.16847604324985,-86.52842427130713 39.16849604134089,-86.52830266976989 39.168497469752396))
Duke 1-2 day closure of alleyway
1417 A S Walnut ST
March 15, 2025 to August 31, 2025
Replacement of overhead equipment on pole # 151-247. 1-2 day closure of the alley between S Walnut St and S Washington St occuring between 03/15/2025 and 08/31/2025. No overnight closure.
Engineering
LINESTRING(-86.53311762861762 39.15075237627303,-86.53310396215177 39.15112095597746)
Winslow, Rogers Resurfacing Project (Allendale to Sare)
Winslow Rd from Allendale east, then east on Rogers Rd to Sare Rd
March 31, 2025 to July 15, 2025 daily until July 25, 2025
Winslow and Rogers Rd will be resurfaced from Allendale to Sare Rd. There are new curbs, curb ramps, and sidewalk being installed as well. There is also a median and rain garden being installed at Xavier Ct on Winslow Ave. A median at Spicewood Ln has been added to the project.
Engineering
LINESTRING(-86.51551749270192 39.13596711566274,-86.50934802393678 39.13601056246054,-86.50850382391799 39.13625262229468,-86.50812773400862 39.136147109263476,-86.50795969412214 39.136345722063936,-86.5081917494942 39.13651950815995,-86.5084718161752 39.13627744900657,-86.50811973222555 39.13613469588563,-86.50792768637935 39.13635192885292,-86.50714349942835 39.13644502849087,-86.50611925532218 39.136327102167286,-86.50398274688557 39.1359857356546,-86.49715712214058 39.135911255420865)
Longview Neighborhood Greenway Project
Longview Ave from Pete Ellis through to Smith Rd.
March 31, 2025 to July 25, 2025 daily until July 25, 2025
Along Longview Ave between Pete Ellis and through to Smith Rd, there will be new curbs installed as well as new curb ramps and sidewalk in areas. There is a multiuse path being installed along the north side of Longview between Pete Ellis and Kingston. There will also be asphalt speed humps installed. There may be time limited road closures when the speed humps are installed.
Engineering
LINESTRING(-86.4948113588396 39.16687841305256,-86.49211444628399 39.16686155054853,-86.49097260844732 39.16752761397052,-86.49009176145245 39.1677215298821,-86.49011351207203 39.16798289391835,-86.49011351207203 39.1677130985708,-86.48958065341932 39.16772996087067,-86.4887433060043 39.16762035633181,-86.48733184056242 39.167316835129554,-86.48605950730486 39.16719036752173,-86.4851134134292 39.16716507371555,-86.48441743674488 39.16718193614679,-86.48424344174413 39.16713134916259,-86.48421081747406 39.16700488122126,-86.4841890685138 39.166237637309706,-86.48139428480737 39.166254499963344)
Duke Energy Lane Closure
2425 S Walnut St
April 1, 2025 to August 31, 2025
WO # 40994471, single day lane closure for replacing pole # 151-161 and installing new pole # MNI-12336 along West side of S Walnut Street. No overnight closure. Work will take 1 day, but please allow up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.53042191860095 39.13757760681224,-86.53038739118523 39.137782399625735)
Kirkwood 2025 Pedestrian Season / Dining Closure
E kirkwood Ave
April 2, 2025 to November 14, 2025
Planned street closure of 1/2 of the 100 block, 300, 400, and 500 blocks of E Kirkwood from Walnut to Indiana.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53356764722223 39.16659167582003,-86.53296935044038 39.166583421954726),LINESTRING(-86.53104972965902 39.166569102177334,-86.52983561781902 39.166553457020115),LINESTRING(-86.52975826443308 39.16655345702014,-86.52829527648181 39.16654302691339),LINESTRING(-86.52820783352382 39.16654041938648,-86.52696345296756 39.16654302691339))
Crosswalk Installation and Improvements
Liberty Dr, Kinser Pike, 11th St and Monroe, 11th St and Adams
May 1, 2025 to August 1, 2025 daily until April 11, 2025
There will be median crosswalks added at Liberty Dr near Aldis and on Kinser Pike in front of Krogers. The intersections of 11th St and Monroe and at 11th St and Adams, New curb ramps and sidewalk areas will be added. At all locations there will lane restrictions and travel time may be delayed. There shall be signage and possibly flaggers to help with directing traffic.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5770807335556 39.1473602584563,-86.5771723877233 39.146584299658485),LINESTRING(-86.55001470124252 39.17327519095343,-86.54953925078647 39.173249771223624),LINESTRING(-86.54739972154526 39.173224351242226,-86.54691607316073 39.17323706123406),LINESTRING(-86.5377739398966 39.18810360696472,-86.53771619682068 39.18693100963756))
Duke Energy Lane Closure
1606 S Rogers St
May 1, 2025 to October 31, 2025
Lane restrictions for pole work
External Project
LINESTRING(-86.50848539581101 39.15037491562114,-86.50826085249109 39.13670205807966)
Duke Energy Lane Closure
1140 E Carnaby St
May 1, 2025 to August 31, 2025
WO #52890955.
Replacing elbows on 4 separate pads in between S Westminster Way and Acadia Court S. Replacing 718' of underground cable. No work will actually be within the right of way other than the South side of E Winslow Road. We will need a lane restriction on E Winslow Road where we will have flaggers. No overnight closure.
External Project
LINESTRING(-86.52047007232942 39.135984600359905,-86.51980745163719 39.13598082114379)
Thornton/Arden Greenway and S Washington Traffic Calming Project
Thornton Dr from Olive St to High St.
S Washington St from 1st St to Grimes Ln.
May 8, 2025 to August 5, 2025 daily until August 6, 2025
Thornton Dr will have new curbs and new curb ramps placed throughout. There will also be asphalt speed humps installed. Along S Washington St, there will be asphalt speed humps installed. When speed humps are being installed, there may be a limited time road closure.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53240062752748 39.15925941146645,-86.53244565087843 39.1534523969822),LINESTRING(-86.51876942440383 39.150406906903584,-86.51870939365088 39.148265429400965,-86.5142521277056 39.148207236172965,-86.51341169945431 39.14840509304068,-86.51338168465034 39.147636939814646,-86.51203099786146 39.14766021783302,-86.51191093635556 39.14735760920948,-86.51081537998047 39.14761366267649,-86.50979486061533 39.14760202321659,-86.50922457017978 39.147299415230805,-86.50845918237343 39.147276137981095))
Duke Energy Lane Closure
594 594 E Graham PL
May 14, 2025 to August 31, 2025
WO # 55906571, 1 day lane closure of S Henderson street to Replace 2 poles on West side of S Henderson Street, and replacing 1 pole on on east side of S Henderson St.
No overnight closure. Work should take 1 day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.52700331931196 39.141169823515156,-86.5269853151809 39.13982928346135,-86.52696731139316 39.13857668280437)
Duke Energy Overhead Equipment
2400 S Walnut St
May 15, 2025 to July 30, 2025
1 day lane closure of the western most lane of S Walnut St near 2400 S Walnut St to install overhead equipment on a pole. Work will occur in the date range 05/15/2025 to 07/30/2025.
Engineering
LINESTRING(-86.53050441163788 39.138834215157345,-86.53040407923476 39.13826589374628)
Winslow Rd/High St/Rogers Rd Round-A-Bout will have a full closure.
Round-A-Bout at Winslow Rd/High St/Rogers Rd.
May 21, 2025 to July 15, 2025 daily until July 20, 2025
The Round-A-Bout at Winslow Rd/High St/Rogers Rd will have a full closure for 45 days. This will start on May 27th 2025 and go through July 14th 2025. This closure is for reconstruction of the pedestrian crossing islands and reconstruction of the driving lanes.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.50813026793558 39.13699835222329,-86.50815757889197 39.136504075188014),LINESTRING(-86.50813937135622 39.13648995315148,-86.50850351373705 39.136306363456214),LINESTRING(-86.50850351373705 39.136306363456214,-86.50884793937752 39.13618983942371,-86.509359248471 39.13601685601904,-86.51193555574618 39.13600273361541),LINESTRING(-86.50882213832031 39.13614395698511,-86.5083036994338 39.136138522929826,-86.5081484747768 39.136136895931116),LINESTRING(-86.5081484747768 39.136115712226086,-86.50790267894754 39.13629930241848),LINESTRING(-86.50790267894754 39.13629930241848,-86.50791178236817 39.13636991384132),LINESTRING(-86.50788447210633 39.136398158228985,-86.50729274073741 39.13644758621689,-86.50435229003955 39.13599567254727),LINESTRING(-86.50789357552694 39.13634873047579,-86.50812116451496 39.13648289186284),LINESTRING(-86.5083032357054 39.13616514041226,-86.50842158156246 39.1363628525406))
Arlington Rd Multifamily Utility Work
1404 W Arlington Rd
May 27, 2025 to August 1, 2025
lane and road closures on Arlington Rd northwest of the W 17th St Roundabout. These closures have been requested to start on May 27th, 2025 and end on August 1st, 2025, during MCCSC’s summer break. These are being requested to upgrade water, storm, and sanitary utility systems as well as add transportation infrastructure.
External Project
LINESTRING(-86.54726837380616 39.17934501130287,-86.5477069198091 39.17948524000445,-86.54815642946211 39.17973595122834,-86.54854015721469 39.18007164790771,-86.54920345804415 39.180959749114294)
North Dunn Street Sidewalk Connection
N Dunn Street just North of E 17th Street
June 9, 2025 to August 8, 2025 weekly on Monday, Tuesday, Wednesday, Thursday and Friday until August 8, 2025
Intermittent flagging for 400ft of N Dunn Street.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52832464277255 39.18017332723048,-86.52832069195294 39.179083058180424),LINESTRING(-86.52832069195294 39.179083058180424,-86.52831674113335 39.179079995603104))
Duke Energy Lane Closure
911 S High St
June 15, 2025 to August 31, 2025
WO # 42544987, Lane closure for Installing new pole # MNI-12597 along E side of S High Street. No overnight closure. Work should only take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50840960956891 39.15771569950863,-86.50840960956891 39.15735330989088)
Duke Energy Lane Closure
610 E Hillside Dr
June 15, 2025 to August 31, 2025
WO # 42544905, lane closure for Installing pole # MNI-20134 along S side of E Hillside Drive. No overnight closure. Work should take one day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.52583520938855 39.150527338880664,-86.52511243758103 39.150510307008716)
Duke Energy Lane Closure
1890 S Walnut St
June 15, 2025 to July 31, 2025
WO # 42544990 Replacing pole # 765-566 along E side of S Walnut Street. Lane restriction only, no full road closure required. Traffic flaggers will be on site. No overnight closure. Work should be completed within 1 working day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.5323193519817 39.145937156670215,-86.53225102200278 39.14570711999781)
lane closure
921 Lindbergh DR
June 23, 2025 to July 14, 2025
-WO 57851741
-921 N Lindbergh Dr
-Bore new electrical service under N Lindbergh Dr
-Close Northbound lane of N Lindbergh Dr, close sidewalk on east side of N Lindbergh Dr, close parking lane on east side of N Lindbergh Dr
-Close for two days (no overnight closure) between 6/23-7/14 2025
-Total bore length is 104 ft
Engineering
LINESTRING(-86.55254001893981 39.176088294497816,-86.55250960056884 39.175030079494974)
EXTENSION: CBU will close N Indiana Ave from E Cottage Ave. to E 11th St.
N Indiana Ave from E Cottage Ave. to E 11th St.
June 23, 2025 to July 11, 2025
CBU will close N Indiana Ave from E Cottage Ave to E 11th St. starting June 23rd to July 11th for scheduled infrastructure maintenance. This is an extension of the previous end date of July 3rd.
Utilities
GEOMETRYCOLLECTION(POINT(-86.52696696219864 39.17255373382051),LINESTRING(-86.52696503192871 39.17255046662339,-86.52698632063579 39.17346148209842))
QC Communications Boring work
2219 S Rogers St
June 24, 2025 to August 25, 2025
Using a mechanized bore machine to replace 52ft of coaxial cable in pipe crossing S Roger St just north of W Jud St. A lane closure and sidewalk closure are needed. Time frame of project 06/24/2025 to 08/25/2025. Construction should take no more than 2 days once started. Comcast JB0002250437
External Project
LINESTRING(-86.53892126020372 39.1430532630003,-86.53892437982152 39.14336537640227)
Bloomington Convention Center Site Preparation
302 S Walnut st
June 27, 2025 to January 26, 2026
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
External Project
LINESTRING(-86.53447106427768 39.16454766952046,-86.53368078602708 39.16453847855911)
Duke Energy Lane Closures
315 E North Dr
July 1, 2025 to November 30, 2025
WO #46704275, 1-2 days of lane closures per location
Sheet 1 - Replacing overhead equipment on pole # 765-564 on E side of S Walnut Street. Replacing pole # 161-169 on E side of S Walnut Street
Sheet 2 - Replacing pole # 164-173 on S side of E North Drive. Replacing pole # 164-174 on N side of E North Drive. Replacing overhead equipment on pole # 164-172 on N side of E North Drive.
Sheet 3 - Replacing pole #'s 174-456, 174-458, and 764-768 on N side of E North Drive.
No overnight closures. Please allow 3 business days in case of inclement weather.
External Project
LINESTRING(-86.53185312871959 39.14429073792101,-86.53178652543639 39.144056304423316,-86.5313971523961 39.14415166729623,-86.53115635591067 39.144270870705725,-86.53093092941367 39.14441788796606,-86.53072087290509 39.14451325034912,-86.53053130971445 39.14455695806484,-86.52997799013089 39.14458874547742,-86.5291428874261 39.14459669232832,-86.5273804620859 39.14458874547742)
Milling and Resurfacing on Grant St
Grant St from E 3rd St to E 10th St
July 2, 2025 06:00 am to 18:00 pm July 7, 2025
Lane Restrictions and No Parking on Grant St from E 3rd St to E 10th St for milling and paving by Milestone.
Street
LINESTRING(-86.52984447388664 39.164676842565655,-86.52980970358826 39.1665777977249,-86.5297862193574 39.16858971210186,-86.52977447724197 39.170565155739524,-86.52976273512655 39.17166664629798)
Smithville Boring Work
400 S Lincoln
July 3, 2025 to August 1, 2025
2 days of lane and sidewalk closures to occur between 7/3/25 and 8/1/25 at the intersection of Smith Ave. and Lincoln St. Smithville will be relocating a fiber due to the Jordan Culvert. Boring along Smith Ave. for about 120'. Closure of the south side sidewalk and the north side sidewalk when crews are boring. Sidewalk Reconstruction will also be needed. Night time lane closure of Westbound Smith Ave during splicing.
External Project
LINESTRING(-86.53359174409282 39.162855480422735,-86.53301838261233 39.16284679195516,-86.5324114036435 39.1628424477486)
JDH Fiber Boring
1900 S Walnut St
July 3, 2025 to July 18, 2025
Lane and shoulder closures on the west side of S Walnut St from E Burks Dr to E Miller Dr for Boring 7500' of 1.5"Duct and tracer wire. 8 Hand Holes will also be installed along the route.
External Project
LINESTRING(-86.53151740173263 39.14288829093434,-86.53122548417792 39.14191523093959,-86.53042887926863 39.13840162013929,-86.53042266835763 39.13799695693268,-86.5304537233864 39.137688641037585,-86.53047235659321 39.137558569519825,-86.53094473496792 39.136437682224255,-86.53116215455593 39.13589313683292,-86.53143543890384 39.13472727445571,-86.5314354389039 39.13329255762258,-86.53145876540121 39.131985581787376,-86.53141463633257 39.1294161856589,-86.53140259554154 39.126694591414065,-86.53280007183596 39.12671868242569)
Paving Grant from 3rd to 10th
Paving Grant from 3rd to 10th
July 3, 2025 to July 9, 2025
Milestone will be milling Grant from 3rd to 10th on 7/3/25; they will return to pave 7/8/25 & 7/9/25; they will pave block by block and if you need access the closed block you can let the flagger know; there will be No Parking on Grant from 3rd to 10th during milling and paving
Public Works
LINESTRING(-86.52974181582599 39.171671639082206,-86.52974458185408 39.171622578197656,-86.52981239145069 39.16460216512627)
Milling and Resurfacing on N Dunn St
N Dunn St from E Cottage Grove Ave to E 11th St
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on N Dunn St from E Cottage Grove Ave to E 11th St for milling and resurfacing.
Street
LINESTRING(-86.52827611187989 39.172595482942256,-86.52830158481 39.17343969653689)
Milling and Paving on N Forrest Ave
N Forrest Ave from E 10th St to E 11th St
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on N Forrest Ave from E 10th St to E 11th St for milling and resurfacing.
Street
LINESTRING(-86.5223952425099 39.17338445945231,-86.52237651440174 39.17168574622244)
Milling and Paving on the offset of E Winslow Rd
E Winslow Rd
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on the offset of E Winslow Rd from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51257500600484 39.1361449493632,-86.51199055871697 39.136125239551774,-86.51028077814193 39.13613087092702)
Crown Castle Small Cell Tower Work
720 N grant St
July 7, 2025 to December 20, 2025
SC-IN E 11th St 510454_0003
Location: In the ROW at the intersecting corner of E 11th St and N Grant St.
Type of work: Type of work: Equipment swap/upgrade of telecommunications equipment at an existing small cell site. See attached drawing for more details and scope of work.
Extent of Closure: Closure at the side of an intersection, Crosswalk closures and pedestrian detours - see pages 9 & 10 of submitted drawing.
Expected date and/or duration: 6/20/2025-12/20/2025
The work is estimated to take 3 days max with the lanes and sidewalks open during the evenings when the crew is not onsite.
Engineering
POINT(-86.52695910510562 39.1734468149738)
Milling and Resurfacing on E 11th St
E 11th St from N Woodlawn Ave to N Forrest Ave
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on E 11th St from N Woodlawn Ave to N Forrest Ave for milling and resurfacing.
Street
LINESTRING(-86.52346146516543 39.17342503040544,-86.52242174877269 39.1734149550648)
Paving alley between Kirkwood and 4th from Indiana to north/south alley past Grant
Alley between Kirkwood and 4th from Indiana to north/south alley past Grant
July 7, 2025 to July 27, 2025
The alley between Kirkwood and 4th from Indiana to north/south alley past Grant will be milled and paved. The section between Dunn and Grant will also receive stormwater upgrades.
Public Works
LINESTRING(-86.52697163873741 39.16605678855879,-86.53045079910586 39.16606715389989)
CBU Utilities will be closing a portion of S Swain Ave for scheduled maintenance of infrastructure. Stage 1
Portion of S Swain Ave between E 3rd St and E Atwater
July 7, 2025 to July 11, 2025
CBU Utilities will be closing a portion of S Swain Ave between E 3rd St and E Atwater Ave, starting July 7th to July 11th. Local businesses will maintain access via narrow alleyways.
Utilities
LINESTRING(-86.51526480359296 39.16346885887083,-86.51525917247388 39.16309337558843)
CBU will close South Swain Ave
South Swain Ave from E 3rd St to East Atwater Ave
July 7, 2025 to July 14, 2025
CBU will close South Swain Ave from E 3rd St to East Atwater Ave from July 7th to July 14th, 2025
Utilities
LINESTRING(-86.51528211035685 39.164206288793906,-86.51527246910867 39.16310742030771)
Closure for Utility work for Hub 2 Development
181 E 17th ST Bloomington
July 7, 2025 06:00 am to 17:00 pm July 18, 2025
10 sewer laterals to be removed/capped: 2 on Washington 7 on Lincoln, and 1 on 17th. 3-4 day road closure on Washington, 10 day road closure on Lincoln, and 3-4 day lane closure on E17th. Each cut estimated to be 6'x6' =36sqft for a total of 360 sqft of pavement.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53212932593961 39.18029933264927,-86.5322233198071 39.17989528716444),LINESTRING(-86.53096721994163 39.18031258000289,-86.53097149239015 39.179517734366726))
ROW2025-07-1737
West bound lane of East Short St at 1250
July 7, 2025
Single lane restriction lasting 1 day 07/07/2021
No sidewalk closure
install gas line for 1250 e short st - will have cut the asphalt
Engineering
LINESTRING(-86.515398812434 39.144056067070096,-86.51542563452415 39.14404451030265,-86.51551057119755 39.14404451030265,-86.51553739328767 39.14405491139027,-86.515398812434 39.14405491139027)
Axis Fiber Solutions Boring Work
1220 W Arlington Rd
July 7, 2025 to July 10, 2025
2 day lane and sidewalk closure on the west side of W Arlington Rd for UG fiber boring. 1072' of boring and 36 sq ft of non pavement excavation. Work dates are 7/725/ to 7/10/25.
External Project
LINESTRING(-86.5474409387453 39.17937906812827,-86.54818702615071 39.179774269968675,-86.54874037440463 39.1803429715161,-86.54935589660899 39.18121047326545)
Crossroads Communication Boring Work
3717 E 3rd St
July 7, 2025 to July 10, 2025
3 days of lane and shoulder closures for directional boring for Fiber Optic home service. Work includes Handholes, Splice Cases, and 1167' of boring. Approximately 1167 feet. Work path Starts at 3709 E 3rd St on south side of road and moves east to S Smith Rd and then north on S Smith Rd ending at 110 S Smith Rd.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.48426253036747 39.1642131038154,-86.48131102821013 39.164221492432034),LINESTRING(-86.48130503102406 39.16563498637893,-86.48126334792087 39.16439612787843))
Milling and Resurfacing on S Kingston Dr
S Kingston Dr from E 3rd St to the end of City maintenance by Target
July 12, 2025 06:00 am to 18:00 pm July 15, 2025
Lane Restrictions and No Parking on S Kingston Dr from E 3rd St to end of City maintenance by Target for milling and paving by E&B Paving.
Street
LINESTRING(-86.49303988182588 39.1641444364904,-86.49303988182588 39.163409278798895,-86.49322222217461 39.162692963914395,-86.4932404562095 39.16253273458665,-86.49321614416301 39.161519511269404)
CBU will close South Swain Ave - Phase 2
South Swain Ave from East Atwater Ave to East Hunter Ave
July 14, 2025 to July 18, 2025
CBU will close South Swain Ave from East Atwater Ave to East Hunter Ave
Utilities
LINESTRING(-86.51526882108175 39.163025170287426,-86.51525967104456 39.16219274386114)
CBU Utilities will close S Swain Ave for scheduled maintenance. Stage 2
S Swain Ave between E Atwater Ave and E Hunter Ave, starting July 14th to July 18th.
July 14, 2025 to July 18, 2025
CBU Utilities will be closing a S Swain Ave between E Atwater Ave and E Hunter Ave, starting July 14th to July 18th.
Utilities
LINESTRING(-86.51526019789227 39.1630307603094,-86.51525756480564 39.16219371189351)
Duke Energy Pole Installation
2822 S Walnut Street Pike
July 15, 2025 to August 31, 2025
3 day lane closure on the west side of S Walnut St Pike just north of the intersection with S Henderson St to install a new pole. Work will occur in the date range of 07/15/2025 to 8/31/2025.
Engineering
LINESTRING(-86.52726663450107 39.13401449566953,-86.52698017452919 39.13366746504764)
Duke Energy Lane Closure
3874 S Laurel Ct
July 15, 2025 to October 31, 2025
WO # 56247048
Sheet 1 - Replacing overhead equipment on pole # 173-250 on west side of S Walnut Street Pike.
Sheet 2 - Replacing pole # 153-257 on E side of S Walnut Street Pike. Replacing pole #'s 153-256 and 153-253 on W side of S Walnut Street Pike.
Sheet 3 - Replacing pole #'s 153-260 and 153-258 along E side of S Walnut Street Pike.
Sheet 4 - Replacing pole # 151-208 along W side of S Walnut Street Pike. Replacing pole #'s 179-898 and 151-207 along W side of S Walnut Street Pike.
Sheet 5 - Replacing pole # 171-200 along E side of S Walnut Street Pike.
Sheet 6 - Replacing pole # 151-197 along W side of S Walnut Street Pike. Replacing overhead equipment on pole # 763-221 along E side of S Henderson Street.
No overnight closures. Work will take 1 day in each location, but please allow for 7 business days in case of inclement weather.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52679867430288 39.13354971016764,-86.52678505753391 39.13288955881259),LINESTRING(-86.52679842760878 39.13224505282196,-86.52676438516693 39.131035628067735),LINESTRING(-86.52666225732192 39.125975887719875,-86.52673034220562 39.12820475338694),LINESTRING(-86.5266507488023 39.12420264855925,-86.52666436557128 39.12502133653993))
Duke Energy Lane Closure
2490 S Burberry Ln
July 15, 2025 to October 31, 2025
WO # 42544946, lane closure for Installing new pole # MNI-20082 along S side of E Winslow Road. No overnight closure. Work will be completed in 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.52404820796333 39.13594800905645,-86.52297158888547 39.13595944848032)
Closure for Utility work for Hub 2 Development
181 E 17th ST Bloomington
July 21, 2025 06:00 am to 17:00 pm July 30, 2025
10 sewer laterals to be removed/capped: 2 on Washington 7 on Lincoln, and 1 on 17th. 3-4 day road closure on Washington, 10 day road closure on Lincoln, and 3-4 day lane closure on E17th. Each cut estimated to be 6'x6' =36sqft for a total of 360 sqft of pavement.
External Project
LINESTRING(-86.53202451180326 39.178990427330234,-86.5316511157369 39.17899304676675)
ROW2025-06-1656
Lane closure on S Morton for one day between 07/21/25 and 07/28/2025
July 21, 2025 to July 28, 2025
-WO 46298852
-229 W 1st St
-Bore new electrical cable underneath S Morton St and the B-Line Trail
-Close southbound lane of S Morton St, close sidewalk on west side of S Morton St.
-Work will take one day between 7/21 and 7/28
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53632911008529 39.159022224881255,-86.53631718911994 39.159022224881255,-86.53632165952288 39.15877380684637,-86.53634103096876 39.15877611772265,-86.53633358040636 39.15902338031532),LINESTRING(-86.53633358040636 39.15902338031532,-86.53633209032661 39.159022224881255))
ROW2025-06-1713
Sidewalks, 2 lanes of Atwater Ave and complete closure of Woodlawn Ave
July 28, 2025 to August 8, 2025
-WO 58288534
-Replace underground electric cable and re-frame pole
-Close both lanes of S Woodlawn Ave from Woodlawn Ave/Atwater Ave intersection to parking lot behind 908 E 3rd St. Close part of alleyway behind 818 E 3rd St. Close left turn lane and northern lane of E Atwater Ave. Close sidewalk to the west of S Woodlawn Ave. Close parking spots on either side of the alley behind 818 E 3rd St
-Close for two non-consecutive days between 7/28/25 and 8/8/25
Engineering
LINESTRING(-86.52278276273094 39.16357179988165,-86.52277978257145 39.16354753739449,-86.52264120171778 39.163549848113945,-86.52265014235992 39.16314662765558,-86.52290495221634 39.16315124905731,-86.52290495221634 39.163123520388496,-86.52260692906522 39.16312120965503,-86.52260245866229 39.163578732005675,-86.52278127265119 39.16357179988165)
Duke Energy Lane Closure
327 S Rogers
August 1, 2025 to November 30, 2025
WO # 41372422, Replacing overhead equipment on pole # 814-4426 at 2721 S Rogers Street. Pole is on the south east side of W Country Club Dr and S Rogers Street intersection. No overnight closure. Work will take 1-2 hours.
Engineering
LINESTRING(-86.53808061040431 39.13602458627568,-86.53789855805192 39.13601957886871)
Duke Energy Overhead Pole Equipment Replacement
2630 S Rogers ST
August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Watson St to replace overhead equipment on on pole # 814-4433 at the north west intersection of W Watson St and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53828638186843 39.13674252324108,-86.53840077414678 39.137766578257924)
Duke Energy Overhead Equipment Replacement
2315 S Rogers ST
August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Coolidge Dr to replace overhead equipment on pole # 814-4444 at the North East intersection of W Coolidge Dr and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53880925088721 39.141523443090136,-86.53875325010075 39.140949302825305)