Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
204 E 17th St Alley Paving
204 E 17th St
December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)
Poplars Redevelopment Project
400 E 7th St
February 17, 2025 to November 21, 2025
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52971398338842 39.16844890303665,-86.5283524160322 39.168441760864965),LINESTRING(-86.52975083230503 39.16849461292935,-86.52882039716067 39.16849461292935,-86.52869695334626 39.16847747171627,-86.52855324251527 39.16847604324985,-86.52842427130713 39.16849604134089,-86.52830266976989 39.168497469752396))
Duke 1-2 day closure of alleyway
1417 A S Walnut ST
March 15, 2025 to August 31, 2025
Replacement of overhead equipment on pole # 151-247. 1-2 day closure of the alley between S Walnut St and S Washington St occuring between 03/15/2025 and 08/31/2025. No overnight closure.
Engineering
LINESTRING(-86.53311762861762 39.15075237627303,-86.53310396215177 39.15112095597746)
Winslow, Rogers Resurfacing Project (Allendale to Sare)
Winslow Rd from Allendale east, then east on Rogers Rd to Sare Rd
March 31, 2025 to July 15, 2025 daily until July 25, 2025
Winslow and Rogers Rd will be resurfaced from Allendale to Sare Rd. There are new curbs, curb ramps, and sidewalk being installed as well. There is also a median and rain garden being installed at Xavier Ct on Winslow Ave. A median at Spicewood Ln has been added to the project.
Engineering
LINESTRING(-86.51551749270192 39.13596711566274,-86.50934802393678 39.13601056246054,-86.50850382391799 39.13625262229468,-86.50812773400862 39.136147109263476,-86.50795969412214 39.136345722063936,-86.5081917494942 39.13651950815995,-86.5084718161752 39.13627744900657,-86.50811973222555 39.13613469588563,-86.50792768637935 39.13635192885292,-86.50714349942835 39.13644502849087,-86.50611925532218 39.136327102167286,-86.50398274688557 39.1359857356546,-86.49715712214058 39.135911255420865)
Longview Neighborhood Greenway Project
Longview Ave from Pete Ellis through to Smith Rd.
March 31, 2025 to July 25, 2025 daily until July 25, 2025
Along Longview Ave between Pete Ellis and through to Smith Rd, there will be new curbs installed as well as new curb ramps and sidewalk in areas. There is a multiuse path being installed along the north side of Longview between Pete Ellis and Kingston. There will also be asphalt speed humps installed. There may be time limited road closures when the speed humps are installed.
Engineering
LINESTRING(-86.4948113588396 39.16687841305256,-86.49211444628399 39.16686155054853,-86.49097260844732 39.16752761397052,-86.49009176145245 39.1677215298821,-86.49011351207203 39.16798289391835,-86.49011351207203 39.1677130985708,-86.48958065341932 39.16772996087067,-86.4887433060043 39.16762035633181,-86.48733184056242 39.167316835129554,-86.48605950730486 39.16719036752173,-86.4851134134292 39.16716507371555,-86.48441743674488 39.16718193614679,-86.48424344174413 39.16713134916259,-86.48421081747406 39.16700488122126,-86.4841890685138 39.166237637309706,-86.48139428480737 39.166254499963344)
Duke Energy Lane Closure
2425 S Walnut St
April 1, 2025 to August 31, 2025
WO # 40994471, single day lane closure for replacing pole # 151-161 and installing new pole # MNI-12336 along West side of S Walnut Street. No overnight closure. Work will take 1 day, but please allow up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.53042191860095 39.13757760681224,-86.53038739118523 39.137782399625735)
Kirkwood 2025 Pedestrian Season / Dining Closure
E kirkwood Ave
April 2, 2025 to November 14, 2025
Planned street closure of 1/2 of the 100 block, 300, 400, and 500 blocks of E Kirkwood from Walnut to Indiana.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53356764722223 39.16659167582003,-86.53296935044038 39.166583421954726),LINESTRING(-86.53104972965902 39.166569102177334,-86.52983561781902 39.166553457020115),LINESTRING(-86.52975826443308 39.16655345702014,-86.52829527648181 39.16654302691339),LINESTRING(-86.52820783352382 39.16654041938648,-86.52696345296756 39.16654302691339))
Duke Energy Lane Closure
1140 E Carnaby St
May 1, 2025 to August 31, 2025
WO #52890955.
Replacing elbows on 4 separate pads in between S Westminster Way and Acadia Court S. Replacing 718' of underground cable. No work will actually be within the right of way other than the South side of E Winslow Road. We will need a lane restriction on E Winslow Road where we will have flaggers. No overnight closure.
External Project
LINESTRING(-86.52047007232942 39.135984600359905,-86.51980745163719 39.13598082114379)
Crosswalk Installation and Improvements
Liberty Dr, Kinser Pike, 11th St and Monroe, 11th St and Adams
May 1, 2025 to August 1, 2025 daily until April 11, 2025
There will be median crosswalks added at Liberty Dr near Aldis and on Kinser Pike in front of Krogers. The intersections of 11th St and Monroe and at 11th St and Adams, New curb ramps and sidewalk areas will be added. At all locations there will lane restrictions and travel time may be delayed. There shall be signage and possibly flaggers to help with directing traffic.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5770807335556 39.1473602584563,-86.5771723877233 39.146584299658485),LINESTRING(-86.55001470124252 39.17327519095343,-86.54953925078647 39.173249771223624),LINESTRING(-86.54739972154526 39.173224351242226,-86.54691607316073 39.17323706123406),LINESTRING(-86.5377739398966 39.18810360696472,-86.53771619682068 39.18693100963756))
Duke Energy Lane Closure
1606 S Rogers St
May 1, 2025 to October 31, 2025
Lane restrictions for pole work
External Project
LINESTRING(-86.50848539581101 39.15037491562114,-86.50826085249109 39.13670205807966)
Thornton/Arden Greenway and S Washington Traffic Calming Project
Thornton Dr from Olive St to High St.
S Washington St from 1st St to Grimes Ln.
May 8, 2025 to August 5, 2025 daily until August 6, 2025
Thornton Dr will have new curbs and new curb ramps placed throughout. There will also be asphalt speed humps installed. Along S Washington St, there will be asphalt speed humps installed. When speed humps are being installed, there may be a limited time road closure.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53240062752748 39.15925941146645,-86.53244565087843 39.1534523969822),LINESTRING(-86.51876942440383 39.150406906903584,-86.51870939365088 39.148265429400965,-86.5142521277056 39.148207236172965,-86.51341169945431 39.14840509304068,-86.51338168465034 39.147636939814646,-86.51203099786146 39.14766021783302,-86.51191093635556 39.14735760920948,-86.51081537998047 39.14761366267649,-86.50979486061533 39.14760202321659,-86.50922457017978 39.147299415230805,-86.50845918237343 39.147276137981095))
Duke Energy Lane Closure
594 594 E Graham PL
May 14, 2025 to August 31, 2025
WO # 55906571, 1 day lane closure of S Henderson street to Replace 2 poles on West side of S Henderson Street, and replacing 1 pole on on east side of S Henderson St.
No overnight closure. Work should take 1 day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.52700331931196 39.141169823515156,-86.5269853151809 39.13982928346135,-86.52696731139316 39.13857668280437)
Duke Energy Overhead Equipment
2400 S Walnut St
May 15, 2025 to July 30, 2025
1 day lane closure of the western most lane of S Walnut St near 2400 S Walnut St to install overhead equipment on a pole. Work will occur in the date range 05/15/2025 to 07/30/2025.
Engineering
LINESTRING(-86.53050441163788 39.138834215157345,-86.53040407923476 39.13826589374628)
Winslow Rd/High St/Rogers Rd Round-A-Bout will have a full closure.
Round-A-Bout at Winslow Rd/High St/Rogers Rd.
May 21, 2025 to July 15, 2025 daily until July 20, 2025
The Round-A-Bout at Winslow Rd/High St/Rogers Rd will have a full closure for 45 days. This will start on May 27th 2025 and go through July 14th 2025. This closure is for reconstruction of the pedestrian crossing islands and reconstruction of the driving lanes.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.50813026793558 39.13699835222329,-86.50815757889197 39.136504075188014),LINESTRING(-86.50813937135622 39.13648995315148,-86.50850351373705 39.136306363456214),LINESTRING(-86.50850351373705 39.136306363456214,-86.50884793937752 39.13618983942371,-86.509359248471 39.13601685601904,-86.51193555574618 39.13600273361541),LINESTRING(-86.50882213832031 39.13614395698511,-86.5083036994338 39.136138522929826,-86.5081484747768 39.136136895931116),LINESTRING(-86.5081484747768 39.136115712226086,-86.50790267894754 39.13629930241848),LINESTRING(-86.50790267894754 39.13629930241848,-86.50791178236817 39.13636991384132),LINESTRING(-86.50788447210633 39.136398158228985,-86.50729274073741 39.13644758621689,-86.50435229003955 39.13599567254727),LINESTRING(-86.50789357552694 39.13634873047579,-86.50812116451496 39.13648289186284),LINESTRING(-86.5083032357054 39.13616514041226,-86.50842158156246 39.1363628525406))
North Dunn Street Sidewalk Connection
N Dunn Street just North of E 17th Street
June 9, 2025 to August 8, 2025 weekly on Monday, Tuesday, Wednesday, Thursday and Friday until August 8, 2025
Intermittent flagging for 400ft of N Dunn Street.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52832464277255 39.18017332723048,-86.52832069195294 39.179083058180424),LINESTRING(-86.52832069195294 39.179083058180424,-86.52831674113335 39.179079995603104))
Duke Energy Lane Closure
1890 S Walnut St
June 15, 2025 to July 31, 2025
WO # 42544990 Replacing pole # 765-566 along E side of S Walnut Street. Lane restriction only, no full road closure required. Traffic flaggers will be on site. No overnight closure. Work should be completed within 1 working day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.5323193519817 39.145937156670215,-86.53225102200278 39.14570711999781)
Duke Energy Lane Closure
911 S High St
June 15, 2025 to August 31, 2025
WO # 42544987, Lane closure for Installing new pole # MNI-12597 along E side of S High Street. No overnight closure. Work should only take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50840960956891 39.15771569950863,-86.50840960956891 39.15735330989088)
Duke Energy Lane Closure
610 E Hillside Dr
June 15, 2025 to August 31, 2025
WO # 42544905, lane closure for Installing pole # MNI-20134 along S side of E Hillside Drive. No overnight closure. Work should take one day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.52583520938855 39.150527338880664,-86.52511243758103 39.150510307008716)
EXTENSION: CBU will close N Indiana Ave from E Cottage Ave. to E 11th St.
N Indiana Ave from E Cottage Ave. to E 11th St.
June 23, 2025 to July 11, 2025
CBU will close N Indiana Ave from E Cottage Ave to E 11th St. starting June 23rd to July 11th for scheduled infrastructure maintenance. This is an extension of the previous end date of July 3rd.
Utilities
GEOMETRYCOLLECTION(POINT(-86.52696696219864 39.17255373382051),LINESTRING(-86.52696503192871 39.17255046662339,-86.52698632063579 39.17346148209842))
lane closure
921 Lindbergh DR
June 23, 2025 to July 14, 2025
-WO 57851741
-921 N Lindbergh Dr
-Bore new electrical service under N Lindbergh Dr
-Close Northbound lane of N Lindbergh Dr, close sidewalk on east side of N Lindbergh Dr, close parking lane on east side of N Lindbergh Dr
-Close for two days (no overnight closure) between 6/23-7/14 2025
-Total bore length is 104 ft
Engineering
LINESTRING(-86.55254001893981 39.176088294497816,-86.55250960056884 39.175030079494974)
QC Communications Boring work
2219 S Rogers St
June 24, 2025 to August 25, 2025
Using a mechanized bore machine to replace 52ft of coaxial cable in pipe crossing S Roger St just north of W Jud St. A lane closure and sidewalk closure are needed. Time frame of project 06/24/2025 to 08/25/2025. Construction should take no more than 2 days once started. Comcast JB0002250437
External Project
LINESTRING(-86.53892126020372 39.1430532630003,-86.53892437982152 39.14336537640227)
Bloomington Convention Center Site Preparation
302 S Walnut st
June 27, 2025 to January 26, 2026
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
External Project
LINESTRING(-86.53447106427768 39.16454766952046,-86.53368078602708 39.16453847855911)
Duke Energy Lane Closures
315 E North Dr
July 1, 2025 to November 30, 2025
WO #46704275, 1-2 days of lane closures per location
Sheet 1 - Replacing overhead equipment on pole # 765-564 on E side of S Walnut Street. Replacing pole # 161-169 on E side of S Walnut Street
Sheet 2 - Replacing pole # 164-173 on S side of E North Drive. Replacing pole # 164-174 on N side of E North Drive. Replacing overhead equipment on pole # 164-172 on N side of E North Drive.
Sheet 3 - Replacing pole #'s 174-456, 174-458, and 764-768 on N side of E North Drive.
No overnight closures. Please allow 3 business days in case of inclement weather.
External Project
LINESTRING(-86.53185312871959 39.14429073792101,-86.53178652543639 39.144056304423316,-86.5313971523961 39.14415166729623,-86.53115635591067 39.144270870705725,-86.53093092941367 39.14441788796606,-86.53072087290509 39.14451325034912,-86.53053130971445 39.14455695806484,-86.52997799013089 39.14458874547742,-86.5291428874261 39.14459669232832,-86.5273804620859 39.14458874547742)
Lineal Lane and Sidewalk Closures for Boring Work
1320 W Bloomfield Rd
July 1, 2025 to July 31, 2025
bore 1347' of innerduct from 1310-1400 w Bloomfield rd. bore 35' of innerduct at w 3rd St and s landmark Ave. bore 50' of innerduct under w ross ct. bore 50' of innerduct under s timothy ct. bore 877' of innerduct from s Christopher ln and w Allen St to 1911 s Christopher ln and place new handhole. bore 464' of innerduct from 1400-1412 s beech tree ln and place 2 handholes. bore 214' of innerduct along s Cory ln and place 1 handhole. each road will take 1-3 days to complete. project to take place between 7/1/25-07/31/25. project includes lane and sidewalk closures.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5508819535982 39.16038951038598,-86.55160417460499 39.16042979246578,-86.55210888541487 39.16039364431538,-86.55241900881276 39.160332349538805,-86.55251022160414 39.16030405964699,-86.55299263598482 39.16022233318225),LINESTRING(-86.55299433606473 39.16022425752843,-86.55317676164749 39.160191252552835,-86.55384160145628 39.16000579594953),LINESTRING(-86.55383754761631 39.16000736759386,-86.55413348257426 39.1599052090823,-86.55463616646412 39.15967888819506,-86.55528073691836 39.15929854165833),LINESTRING(-86.5585938088187 39.15675718233618,-86.5585673253609 39.1566853067641),LINESTRING(-86.55757129321621 39.15659119662138,-86.55757249708492 39.156472648285586))
Milling and Resurfacing on Grant St
Grant St from E 3rd St to E 10th St
July 2, 2025 06:00 am to 18:00 pm July 7, 2025
Lane Restrictions and No Parking on Grant St from E 3rd St to E 10th St for milling and paving by Milestone.
Street
LINESTRING(-86.52984447388664 39.164676842565655,-86.52980970358826 39.1665777977249,-86.5297862193574 39.16858971210186,-86.52977447724197 39.170565155739524,-86.52976273512655 39.17166664629798)
Smithville Boring Work
400 S Lincoln
July 3, 2025 to August 1, 2025
2 days of lane and sidewalk closures to occur between 7/3/25 and 8/1/25 at the intersection of Smith Ave. and Lincoln St. Smithville will be relocating a fiber due to the Jordan Culvert. Boring along Smith Ave. for about 120'. Closure of the south side sidewalk and the north side sidewalk when crews are boring. Sidewalk Reconstruction will also be needed. Night time lane closure of Westbound Smith Ave during splicing.
External Project
LINESTRING(-86.53359174409282 39.162855480422735,-86.53301838261233 39.16284679195516,-86.5324114036435 39.1628424477486)
Paving Grant from 3rd to 10th
Paving Grant from 3rd to 10th
July 3, 2025 to July 9, 2025
Milestone will be milling Grant from 3rd to 10th on 7/3/25; they will return to pave 7/8/25 & 7/9/25; they will pave block by block and if you need access the closed block you can let the flagger know; there will be No Parking on Grant from 3rd to 10th during milling and paving
Public Works
LINESTRING(-86.52974181582599 39.171671639082206,-86.52974458185408 39.171622578197656,-86.52981239145069 39.16460216512627)
JDH Fiber Boring
1900 S Walnut St
July 3, 2025 to July 18, 2025
Lane and shoulder closures on the west side of S Walnut St from E Burks Dr to E Miller Dr for Boring 7500' of 1.5"Duct and tracer wire. 8 Hand Holes will also be installed along the route.
External Project
LINESTRING(-86.53151740173263 39.14288829093434,-86.53122548417792 39.14191523093959,-86.53042887926863 39.13840162013929,-86.53042266835763 39.13799695693268,-86.5304537233864 39.137688641037585,-86.53047235659321 39.137558569519825,-86.53094473496792 39.136437682224255,-86.53116215455593 39.13589313683292,-86.53143543890384 39.13472727445571,-86.5314354389039 39.13329255762258,-86.53145876540121 39.131985581787376,-86.53141463633257 39.1294161856589,-86.53140259554154 39.126694591414065,-86.53280007183596 39.12671868242569)
Crown Castle Small Cell Tower Work
720 N grant St
July 7, 2025 to December 20, 2025
SC-IN E 11th St 510454_0003
Location: In the ROW at the intersecting corner of E 11th St and N Grant St.
Type of work: Type of work: Equipment swap/upgrade of telecommunications equipment at an existing small cell site. See attached drawing for more details and scope of work.
Extent of Closure: Closure at the side of an intersection, Crosswalk closures and pedestrian detours - see pages 9 & 10 of submitted drawing.
Expected date and/or duration: 6/20/2025-12/20/2025
The work is estimated to take 3 days max with the lanes and sidewalks open during the evenings when the crew is not onsite.
Engineering
POINT(-86.52695910510562 39.1734468149738)
Milling and Paving on the offset of E Winslow Rd
E Winslow Rd
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on the offset of E Winslow Rd from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51257500600484 39.1361449493632,-86.51199055871697 39.136125239551774,-86.51028077814193 39.13613087092702)
ROW2025-07-1737
West bound lane of East Short St at 1250
July 7, 2025
Single lane restriction lasting 1 day 07/07/2021
No sidewalk closure
install gas line for 1250 e short st - will have cut the asphalt
Engineering
LINESTRING(-86.515398812434 39.144056067070096,-86.51542563452415 39.14404451030265,-86.51551057119755 39.14404451030265,-86.51553739328767 39.14405491139027,-86.515398812434 39.14405491139027)
Closure for Utility work for Hub 2 Development
181 E 17th ST Bloomington
July 7, 2025 06:00 am to 17:00 pm July 18, 2025
10 sewer laterals to be removed/capped: 2 on Washington 7 on Lincoln, and 1 on 17th. 3-4 day road closure on Washington, 10 day road closure on Lincoln, and 3-4 day lane closure on E17th. Each cut estimated to be 6'x6' =36sqft for a total of 360 sqft of pavement.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53212932593961 39.18029933264927,-86.5322233198071 39.17989528716444),LINESTRING(-86.53096721994163 39.18031258000289,-86.53097149239015 39.179517734366726))
Axis Fiber Solutions Boring Work
1220 W Arlington Rd
July 7, 2025 to July 10, 2025
2 day lane and sidewalk closure on the west side of W Arlington Rd for UG fiber boring. 1072' of boring and 36 sq ft of non pavement excavation. Work dates are 7/725/ to 7/10/25.
External Project
LINESTRING(-86.5474409387453 39.17937906812827,-86.54818702615071 39.179774269968675,-86.54874037440463 39.1803429715161,-86.54935589660899 39.18121047326545)
Crossroads Communication Boring Work
3717 E 3rd St
July 7, 2025 to July 10, 2025
3 days of lane and shoulder closures for directional boring for Fiber Optic home service. Work includes Handholes, Splice Cases, and 1167' of boring. Approximately 1167 feet. Work path Starts at 3709 E 3rd St on south side of road and moves east to S Smith Rd and then north on S Smith Rd ending at 110 S Smith Rd.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.48426253036747 39.1642131038154,-86.48131102821013 39.164221492432034),LINESTRING(-86.48130503102406 39.16563498637893,-86.48126334792087 39.16439612787843))
EXTENSION: CBU Utilities will extend the closing of a portion of S Swain Ave for scheduled maintenance.
S Swain Ave mid way between E 3rd St and E Atwater.
July 7, 2025 to July 19, 2025
CBU Utilities will extend the closing of a portion of S Swain Ave between E 3rd St and E Atwater Ave, starting July 7th to July 19th. Local businesses will maintain access via parking lot and alleyway.
Utilities
LINESTRING(-86.51526480359296 39.16346885887083,-86.51525917247388 39.16309337558843)
ROW2025-07-1740
116 N clark
July 7, 2025
116 N Clark street
SIngle lane closure- lasting one day- 07/07/2025 for replacing 115' of gas line.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50498605410867 39.16735557912807,-86.50498605410867 39.167223875504305,-86.50500244539508 39.167223875504305,-86.50500393547482 39.167356734393536,-86.50498456394708 39.167356734393536),LINESTRING(-86.50498307386734 39.167356734393536,-86.50498307386734 39.167356734393536))
Milling and Resurfacing on N Dunn St
N Dunn St from E Cottage Grove Ave to E 11th St
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on N Dunn St from E Cottage Grove Ave to E 11th St for milling and resurfacing.
Street
LINESTRING(-86.52827611187989 39.172595482942256,-86.52830158481 39.17343969653689)
Milling and Paving on N Forrest Ave
N Forrest Ave from E 10th St to E 11th St
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on N Forrest Ave from E 10th St to E 11th St for milling and resurfacing.
Street
LINESTRING(-86.5223952425099 39.17338445945231,-86.52237651440174 39.17168574622244)
Milling and Resurfacing on E 11th St
E 11th St from N Woodlawn Ave to N Forrest Ave
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on E 11th St from N Woodlawn Ave to N Forrest Ave for milling and resurfacing.
Street
LINESTRING(-86.52346146516543 39.17342503040544,-86.52242174877269 39.1734149550648)
Paving alley between Kirkwood and 4th from Indiana to north/south alley past Grant
Alley between Kirkwood and 4th from Indiana to north/south alley past Grant
July 7, 2025 to July 27, 2025
The alley between Kirkwood and 4th from Indiana to north/south alley past Grant will be milled and paved. The section between Dunn and Grant will also receive stormwater upgrades.
Public Works
LINESTRING(-86.52697163873741 39.16605678855879,-86.53045079910586 39.16606715389989)
CBU will close South Swain Ave
South Swain Ave from E 3rd St to East Atwater Ave
July 7, 2025 to July 14, 2025
CBU will close South Swain Ave from E 3rd St to East Atwater Ave from July 7th to July 14th, 2025
Utilities
LINESTRING(-86.51528211035685 39.164206288793906,-86.51527246910867 39.16310742030771)
ROW2025-07-1748
840 S Woodscrest DR
July 10, 2025 to July 11, 2025
road repair
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50224698145422 39.15838634177942,-86.50222164960753 39.15837940917547,-86.50218886703469 39.15830661628462,-86.50219184719418 39.158283507491234,-86.50224400129474 39.158385186366644),LINESTRING(-86.50224400129474 39.158385186366644,-86.502242511215 39.15838287547754),LINESTRING(-86.50223059024968 39.15837709828617,-86.50223059024968 39.158378253699084))
ROW2025-06-1672
1730 S Walnut ST
July 10, 2025 to July 12, 2025
Real America intends to replace the entrance to the parking lot of The Retreat at the Switchyard and the Meineke Car Care Center with new concrete. The concrete entrance/approach will be poured over the course of 3 days. The existing sidewalk will be cut with a clean edge on both sides of the approach and replaced with new concrete. The work will require a lane closure on the southbound side of S Walnut St and a sidewalk closure on either side of the driveway entrance. The closure is planned between July 10th, 2025 and July 12th, 2025.
Engineering
LINESTRING(-86.53301584884403 39.14805191824351,-86.53269818272106 39.14699056727642,-86.53267420784894 39.1469952155353,-86.53299586978393 39.14804727002249,-86.53301584884403 39.14805501705379)
Milling and Resurfacing on E Longview Ave
E Longview Ave from N Glenwood Ave W to N Glenwood Ave E
July 14, 2025 06:00 am to 16:00 pm July 17, 2025
Lane Restrictions and No Parking on E Longview Ave from N Glenwood Ave W to N Glenwood Ave E for milling and resurfacing.
Street
LINESTRING(-86.49006102202522 39.16772820066117,-86.48964046038435 39.16775569982602,-86.4886169248246 39.16760249005637,-86.486990415346 39.167315711898254,-86.48635197237307 39.167233213855354,-86.48556658617626 39.16717428662264,-86.4849180091879 39.16717821510636,-86.48438090636944 39.167201786004085,-86.48428463322273 39.16717821510636)
ROW2025-07-1762
521 N Park
July 14, 2025 to July 18, 2025
sewer work-
Single lane restriction
Engineering
LINESTRING(-86.52467946546788 39.17133377012718,-86.52468140395487 39.17142093651094,-86.52465814157847 39.17138486765566,-86.52465814157847 39.17133527300106,-86.5246775268744 39.17130972422345,-86.52468140395487 39.171339781622464)
Milling and Resurfacing on N Glenwood Ave W
N Glenwood Ave W from E Longview Ave to the Dead End
July 14, 2025 06:00 am to 16:00 pm July 17, 2025
Lane Restrictions and No Parking on N Glenwood Ave W from E Longview Ave to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.49009308023123 39.167745839995405,-86.49009928140869 39.16803110066664)
Milling and Resurfacing on S Kingston Dr
S Kingston Dr from E 3rd St to the end of City maintenance by Target
July 14, 2025 06:00 am to 18:00 pm July 16, 2025
Lane Restrictions and No Parking on S Kingston Dr from E 3rd St to end of City maintenance by Target for milling and paving by E&B Paving.
Street
LINESTRING(-86.49303988182588 39.1641444364904,-86.49303988182588 39.163409278798895,-86.49322222217461 39.162692963914395,-86.4932404562095 39.16253273458665,-86.49321614416301 39.161519511269404)
Lineal Trenching Work
215 S Walnut St
July 14, 2025 to July 28, 2025
A050ACS DIG TRENCH TO PLACE FROM HAND HOLE TO SPARE DUCT 2' X 60' X 3' DEEP. The work will be in the alleyways behind 215 S Walnut St. The work is planned between 6/9 to 6/27. The alleys will be open every night after the work has started.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53448030430499 39.16509887598241,-86.5342946898846 39.16510039082567),LINESTRING(-86.53425756697071 39.16513068814601,-86.53425756697071 39.165262481349345))
Milling and Resurfacing on N Glenwood Ave E
N Glenwood Ave E from E Longview Ave to E Morningside Dr
July 14, 2025 06:00 am to 16:00 pm July 17, 2025
Lane Restrictions and No Parking on N Glenwood Ave E from E Longview Ave to E Morningside Dr for milling and resurfacing.
Street
LINESTRING(-86.48433908124589 39.16719367542706,-86.4842438238193 39.16714290100509,-86.48422298625724 39.16708751068481,-86.48421703266807 39.166533605082634,-86.48419917190058 39.166275114308775)
Lineal Pole and Boring Work
1320 W Arlington Rd
July 14, 2025 to July 16, 2025
A052WWY- Replacement of 3 fiber poles just north of the roundabout of Arlington Rd and N Monroe St and W 17th St. After the poles have been relocated, the fiber on the original poles will be placed on the new poles. The work is expected to take 2 days to complete and will have only 1 lane closure.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54760204546919 39.17944752111052,-86.5478302186859 39.17956543664536),LINESTRING(-86.5487274198744 39.180343824854276,-86.54887166736086 39.18053695970096))
ROW2025-07-1730
513 W 7th
July 14, 2025 to July 18, 2025
single lane restriction
Engineering
LINESTRING(-86.53950481819214 39.168594831911975,-86.53947650602227 39.16861216099912,-86.53936772741821 39.16860985047768,-86.53936027685582 39.16859367663514,-86.53950481819214 39.16859714246564)
Smithville Communications Pole Transfers
116 S College Ave
July 14, 2025 to August 15, 2025
Pole Transfers for Duke Poles in 4 separate locations:
-100 S College Ave, S Gentry St lane and sidewalk closure on the east side of street 1-2 days.
-108 E 3rd St, east west alley closure between E 3rd and E Smith Ave and S Lincoln and S Grant 1-2 days.
-336 S Dunn St, S Kirby Alley closure between E 3rd St and E Smith St 1-2 days.
-700 Atwater, sidewalk and lane closure on south side of Atwater east of S Fess 1-2 days.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53554227711007 39.16594134367148,-86.5355384678484 39.16578776455148),LINESTRING(-86.53044197575566 39.165082225102765,-86.53019841033252 39.165089262771176),LINESTRING(-86.52914448973348 39.162892605551974,-86.52915401510451 39.16317642164927))
CBU Utilities will close S Swain Ave for scheduled maintenance. Stage 2
S Swain Ave between E Atwater Ave and E Hunter Ave, starting July 14th to July 18th.
July 14, 2025 to July 18, 2025
CBU Utilities will be closing a S Swain Ave between E Atwater Ave and E Hunter Ave, starting July 14th to July 18th.
Utilities
LINESTRING(-86.51526019789227 39.1630307603094,-86.51525756480564 39.16219371189351)
CBU will close South Swain Ave - Phase 2
South Swain Ave from East Atwater Ave to East Hunter Ave
July 14, 2025 to July 18, 2025
CBU will close South Swain Ave from East Atwater Ave to East Hunter Ave
Utilities
LINESTRING(-86.51526882108175 39.163025170287426,-86.51525967104456 39.16219274386114)
Smithville Communications Pole Transfers
116 S College Ave
July 14, 2025 to August 15, 2025
Pole Transfers for Duke Poles in 4 separate locations:
-100 S College Ave, S Gentry St lane and sidewalk closure on the east side of street 1-2 days.
-108 E 3rd St, east west alley closure between E 3rd and E Smith Ave and S Lincoln and S Grant 1-2 days.
-336 S Dunn St, S Kirby Alley closure between E 3rd St and E Smith St 1-2 days.
-700 Atwater, sidewalk and lane closure on south side of Atwater east of S Fess 1-2 days.
External Project
LINESTRING(-86.52583131563965 39.1631308792044,-86.52553898203813 39.16312702112731)
Duke Energy Pole Installation
2822 S Walnut Street Pike
July 15, 2025 to August 31, 2025
3 day lane closure on the west side of S Walnut St Pike just north of the intersection with S Henderson St to install a new pole. Work will occur in the date range of 07/15/2025 to 8/31/2025.
Engineering
LINESTRING(-86.52726663450107 39.13401449566953,-86.52698017452919 39.13366746504764)
Duke Energy Lane Closure
2490 S Burberry Ln
July 15, 2025 to October 31, 2025
WO # 42544946, lane closure for Installing new pole # MNI-20082 along S side of E Winslow Road. No overnight closure. Work will be completed in 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.52404820796333 39.13594800905645,-86.52297158888547 39.13595944848032)
Duke Energy Lane Closure
3874 S Laurel Ct
July 15, 2025 to October 31, 2025
WO # 56247048
Sheet 1 - Replacing overhead equipment on pole # 173-250 on west side of S Walnut Street Pike.
Sheet 2 - Replacing pole # 153-257 on E side of S Walnut Street Pike. Replacing pole #'s 153-256 and 153-253 on W side of S Walnut Street Pike.
Sheet 3 - Replacing pole #'s 153-260 and 153-258 along E side of S Walnut Street Pike.
Sheet 4 - Replacing pole # 151-208 along W side of S Walnut Street Pike. Replacing pole #'s 179-898 and 151-207 along W side of S Walnut Street Pike.
Sheet 5 - Replacing pole # 171-200 along E side of S Walnut Street Pike.
Sheet 6 - Replacing pole # 151-197 along W side of S Walnut Street Pike. Replacing overhead equipment on pole # 763-221 along E side of S Henderson Street.
No overnight closures. Work will take 1 day in each location, but please allow for 7 business days in case of inclement weather.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52679867430288 39.13354971016764,-86.52678505753391 39.13288955881259),LINESTRING(-86.52679842760878 39.13224505282196,-86.52676438516693 39.131035628067735),LINESTRING(-86.52666225732192 39.125975887719875,-86.52673034220562 39.12820475338694),LINESTRING(-86.5266507488023 39.12420264855925,-86.52666436557128 39.12502133653993))
Lineal Boring Work
331 S Washington
July 17, 2025 to July 25, 2025
3 days of lane closure on S Washington St adjacent to 331 S Washington for 3'x4' street cut on east side of street. 3'x4' non pavement excavation on west side of S Lincoln. boring from manhole to handhole. Work to occur between 7/17/25 and 7/25/25. A050ACS
External Project
LINESTRING(-86.53238430903951 39.16407219675256,-86.53238121765438 39.163729463502165)
Best Buddies Friendship Walk
N Fee Lane from McNutt to 17th to gate 2 into Assembly Hall
July 19, 2025 18:00 pm to 21:00 pm
Best Buddies Friendship Walk
Public Works
LINESTRING(-86.51883106575835 39.17641128068652,-86.51883106575835 39.17641128068652,-86.51896071837986 39.17904769405149,-86.52111161139439 39.179031755018315,-86.52111561335973 39.179758028741674)
Milling and Resurfacing on N Bryan Ave
N Bryan Ave from E 3rd St to the Dead End
July 21, 2025 06:00 am to 16:00 pm July 31, 2025
Lane Restrictions and No Parking on N Bryan Ave from E 3rd St to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.5082560465271 39.16432293969541,-86.50830352534851 39.16879547120871)
Milling and Resurfacing on N Clark St
N Clark St from E 3rd St to the Dead End
July 21, 2025 06:00 am to 16:00 pm July 31, 2025
Lane Restrictions and No Parking on N Clark St from E 3rd St to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.50495539940202 39.16430126666427,-86.50499827407235 39.16826530719615,-86.5050304300751 39.170545665833856)
Milling and Resurfacing on N Roosevelt St
N Roosevelt St from E 3rd St to the Dead End
July 21, 2025 06:00 am to 16:00 pm July 31, 2025
Lane Restrictions and No Parking on N Roosevelt St from E 3rd St to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.50604294228792 39.16430394541234,-86.50606513742508 39.16829625874843,-86.50612387208285 39.17065011290077)
Milling and Resurfacing on E 4th St
E 4th St from S Union St to S Hillsdale Dr
July 21, 2025 06:00 am to 16:00 pm July 31, 2025
Lane Restrictions and No Parking on E 4th St from S Union St to S Jefferson St, S Roosevelt St to S Clark St, and S Hillsdale Dr to the Dead End for milling and resurfacing.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.50934840870624 39.165590628623164,-86.50716111500469 39.16560989976969),LINESTRING(-86.50600947173001 39.16559705233925,-86.50501524732022 39.16561632348399),LINESTRING(-86.50451813511532 39.165629170910904,-86.50344934387479 39.16584757680894))
Milling and Resurfacing on N Kinser Pike
N Kinser Pike from W 17th St to W Acuff Rd
July 21, 2025 06:00 am to 18:00 pm July 25, 2025
Lane Restrictions on N Kinser Pike from W 17th St to W Acuff Rd for milling, paving, and pavement markings by Milestone.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53775603795899 39.17911200706018,-86.53772611991631 39.18633585490119),LINESTRING(-86.53769476803018 39.18666589494305,-86.537761765976 39.188268273975126,-86.5377234814356 39.19095846053614,-86.53773305257072 39.192167592758835,-86.53792447527304 39.19256074169877,-86.53831689181278 39.19283520286248,-86.5391208671625 39.19310224512802,-86.54036511472754 39.193525059972956,-86.54093720790893 39.19379614617944,-86.54113820174636 39.19414477972262,-86.5413797231324 39.19526183365028,-86.54199232327954 39.197747053361184,-86.54267148082894 39.200394078750634,-86.54279590558546 39.2007871816613,-86.54301604169312 39.20098002379436,-86.54347545617868 39.20105419370455,-86.54721777000894 39.20101710875926,-86.5472943390898 39.201180282372206,-86.54733262363027 39.20196647719493,-86.547390050441 39.20552225654913,-86.5474283349815 39.20834586944895))
Closure for Utility work for Hub 2 Development
181 E 17th ST Bloomington
July 21, 2025 06:00 am to 17:00 pm July 30, 2025
10 sewer laterals to be removed/capped: 2 on Washington 7 on Lincoln, and 1 on 17th. 3-4 day road closure on Washington, 10 day road closure on Lincoln, and 3-4 day lane closure on E17th. Each cut estimated to be 6'x6' =36sqft for a total of 360 sqft of pavement.
External Project
LINESTRING(-86.53202451180326 39.178990427330234,-86.5316511157369 39.17899304676675)
Axis Fiber Solutions Lane Closure for Boring Work
113 E 15th St
July 21, 2025 to July 23, 2025
N Walnut and E 15th St, install 88' of UG Fiber Optic Cable by directional bore along/crossing E 15TH St. Fiber to service 1000 N Walnut.
Less than 3 days single lane closure.
Construction Dates 7/21/25 thru 7/23/25.
9 sq ft excavation (bore pit)
No sidewalk repair expected.
External Project
LINESTRING(-86.53309799629378 39.17685863707345,-86.53286518058401 39.17685863707345)
Phase 1: CBU will close Monroe Street
Monroe Street between W Cottage Grove Ave to W 11th st.
July 21, 2025 to July 25, 2025
Phase 1 of 2: CBU will close Monroe Street between W Cottage Grove Ave to W 11th St. From Monday, July 21st until Friday, July 25th
Utilities
LINESTRING(-86.54710941176188 39.17227321734745,-86.5471441145321 39.17320944704585)
ROW2025-06-1656
Lane closure on S Morton for one day between 07/21/25 and 07/28/2025
July 21, 2025 to July 28, 2025
-WO 46298852
-229 W 1st St
-Bore new electrical cable underneath S Morton St and the B-Line Trail
-Close southbound lane of S Morton St, close sidewalk on west side of S Morton St.
-Work will take one day between 7/21 and 7/28
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53632911008529 39.159022224881255,-86.53631718911994 39.159022224881255,-86.53632165952288 39.15877380684637,-86.53634103096876 39.15877611772265,-86.53633358040636 39.15902338031532),LINESTRING(-86.53633358040636 39.15902338031532,-86.53633209032661 39.159022224881255))
Milling and Resurfacing on E Latimer Rd
E Latimer Rd from S Pleasant Ridge Rd to the Dead End
July 21, 2025 06:00 am to 16:00 pm July 31, 2025
Lane Restrictions and No Parking on E Latimer Rd from S Pleasant Ridge Rd to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.48912386754154 39.156951910220556,-86.48970881721723 39.15697739230416)
ROW2025-06-1713
Sidewalks, 2 lanes of Atwater Ave and complete closure of Woodlawn Ave
July 23, 2025 to August 5, 2025
-WO 58288534
-Replace underground electric cable and re-frame pole
-Close both lanes of S Woodlawn Ave from Woodlawn Ave/Atwater Ave intersection to parking lot behind 908 E 3rd St. Close part of alleyway behind 818 E 3rd St. Close left turn lane and northern lane of E Atwater Ave. Close sidewalk to the west of S Woodlawn Ave. Close parking spots on either side of the alley behind 818 E 3rd St
-Close for two non-consecutive days between 7/23/25 and 8/5/25
Engineering
LINESTRING(-86.52278276273094 39.16357179988165,-86.52277978257145 39.16354753739449,-86.52264120171778 39.163549848113945,-86.52265014235992 39.16314662765558,-86.52290495221634 39.16315124905731,-86.52290495221634 39.163123520388496,-86.52260692906522 39.16312120965503,-86.52260245866229 39.163578732005675,-86.52278127265119 39.16357179988165)
Banneker Block Party
Elm Street between 7th and 8th
July 25, 2025 13:00 pm to 21:00 pm
Banneker Block Party
Public Works
LINESTRING(-86.54526933567222 39.168672071374715,-86.54524181976373 39.169559683235576)
Phase 2: CBU will close Monroe Street
Monroe Street between W Cottage Grove Ave to W 10th St.
July 28, 2025 to August 1, 2025
Phase 2 of 2: CBU will close Monroe Street between W Cottage Grove Ave to W 10th St. From Monday, July 28th until Friday, August 1st, 2025
Utilities
LINESTRING(-86.54711534828516 39.172233488627796,-86.54710038430903 39.17141852539942)
Duke Energy Overhead Equipment Replacement
2315 S Rogers ST
August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Coolidge Dr to replace overhead equipment on pole # 814-4444 at the North East intersection of W Coolidge Dr and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53880925088721 39.141523443090136,-86.53875325010075 39.140949302825305)
Duke Energy Lane Closure
327 S Rogers
August 1, 2025 to November 30, 2025
WO # 41372422, Replacing overhead equipment on pole # 814-4426 at 2721 S Rogers Street. Pole is on the south east side of W Country Club Dr and S Rogers Street intersection. No overnight closure. Work will take 1-2 hours.
Engineering
LINESTRING(-86.53808061040431 39.13602458627568,-86.53789855805192 39.13601957886871)
Duke Energy Overhead Pole Equipment Replacement
2630 S Rogers ST
August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Watson St to replace overhead equipment on on pole # 814-4433 at the north west intersection of W Watson St and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53828638186843 39.13674252324108,-86.53840077414678 39.137766578257924)
ROW2025-06-1721
1730 S Walnut ST Bloomington, IN 47403
August 4, 2025 to August 8, 2025
light pole relocation 3 non consecutive days - lane closure, -sidewalk closure with sidewalk detour at crosswalks est date of construction aug 4th through aug 8th
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53301023304512 39.14804658886712,-86.53269329815524 39.14697929778498),LINESTRING(-86.53301448710121 39.14804493929748,-86.53298470800756 39.148051537643795,-86.53266351906159 39.14698589625388,-86.53269329815524 39.14697929778498))