Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Bloomington Convention Center Site Preparation
302 S Walnut st
June 27, 2025 to January 26, 2026
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
External Project
LINESTRING(-86.53447106427768 39.16454766952046,-86.53368078602708 39.16453847855911)
ROW2025-08-1837
Work Site: Along W. Arlington Rd., W. Gourley Pike, & W. Hickory Ln.
September 2, 2025 to January 1, 2026
1-2 day single lane closure and sidewalk detour when needed.
Type of work: replacing equipment only on 16 existing poles (814-1258, 155-359, 155-363, 176-557, 167-785, 167-786, 152-504, 289-338, 152-521, 761-193, 152-522, 176-556, 156-525, 152-524, 176-554, & 765-838), replacing 13 existing poles (155-404, 155-364, 155-366, 155-368, 152-541, 152-498, 152-499, 152-500, 152-501, 152-503, 152-506, 152-519, & 152-523), replacing span guy from Pole 155-364 to Pole 291-976, from Pole 155-366 to Pole 155-367, from Pole 155-368 to Pole 179-651, from Pole 152-519 to Pole 289-338, & from Pole 152-523 to Pole 152-524, restaple pole ground on existing Pole 167-784, installing new equipment only on existing Pole 167-783, & bond down guys on existing Pole 152-531
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55421487909233 39.19384258328114,-86.55416452901507 39.19376626714609,-86.55382791520819 39.19346734101603,-86.55304248186852 39.19278252378615,-86.55276197020227 39.19248902841798,-86.55249146136924 39.19217833491183,-86.55227806889042 39.191855315645455,-86.55215803580708 39.191620156613936,-86.55203800272378 39.19133072916978,-86.55193797530697 39.19098703246502,-86.55189116483221 39.190726201507545,-86.551863306509 39.19052755986769,-86.551863306509 39.19035482773097,-86.55187445014434 39.18959480063333,-86.55185773545647 39.1888995421337,-86.55184659182113 39.188510885003296,-86.55172941432227 39.18791916588725),LINESTRING(-86.55172941432227 39.18791916588725,-86.55170003581972 39.18789639526034),LINESTRING(-86.55160626666193 39.186529950238736,-86.55114099672214 39.186539967630324),LINESTRING(-86.55110222481878 39.186469845515205,-86.55110222481878 39.186469845515205,-86.55048186371577 39.18643979330611),LINESTRING(-86.55115392128154 39.186560002409266,-86.55085666528944 39.18597898943818,-86.55050771283459 39.18510746028832,-86.55022338140192 39.18433609848503,-86.55020543082198 39.183863020546056,-86.550194908464 39.18358570794612,-86.55018460949856 39.183314281709784,-86.54997782187262 39.182222323040236),LINESTRING(-86.55023630596135 39.18358476418783,-86.55023630596135 39.18358476418783,-86.55059818120074 39.18357474603113),LINESTRING(-86.55010706391695 39.18386526305392,-86.55010706391695 39.18386526305392,-86.54966764132111 39.183875281169264))
Crown Castle Small Cell Tower Work
1314 N Eagleson Ave
September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167
Location: In the ROW at the corner of E 17th St and the private driveway.
Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day.
Expected date and/or duration: 9/8/2025-3/8/2026
Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
Crown Castle Small Cell Tower Work
902 E Cottage Grove Ave
September 15, 2025 to March 15, 2026
SC-IN E Cottage Grove Ave 522219_0204
Location: In the ROW to the north of the apartment complex at 900 E Cottage Grove Ave
Type of Work: Replace existing utility pole with new 50' wood utility pole (43'-0" final above grade height) and install telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Lane closure and detour, sidewalk closure. See page 16 of submitted drawing.
Expected date and/or duration: 9/15/2025-3/15/2026.
The work is expected to take 3 days max with the area being opened during the evening hours.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.51363350457244 39.171563620591144,-86.51323187257547 39.171562725867915),LINESTRING(-86.52342163600183 39.17249634360991,-86.52243798259646 39.17248620978043))
ROW2025-10-2024
East-West alley North of 205 E Kirkwood AVE
November 8, 2025 to January 16, 2026
Alley closure for loading and unloading- along with parking spots.
Engineering
LINESTRING(-86.53223709950697 39.167079291184734,-86.5322385299966 39.16705156403265,-86.53173928141558 39.167052673070714,-86.53174071190521 39.167083727525466,-86.53223996040441 39.16708261845619)
Poplars Redevelopment
400 E 7th St
November 22, 2025 to March 2, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52971250992954 39.16849483132833,-86.5288075170272 39.16849314470889,-86.52871179662408 39.1684779651323,-86.52855733870085 39.16847627851246,-86.5284289863421 39.168498204567044,-86.5283463187212 39.168498204567044)
Poplars Redevelopment
400 E 7th St
November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
ROW2025-09-1983
Banneker CC.
December 8, 2025 to December 31, 2025
Full Closure of W 7th
Engineering
LINESTRING(-86.54524698146696 39.16865761066893,-86.54524698146696 39.16862017983675,-86.54495015028142 39.168618793498666,-86.54495015028142 39.168656224331585,-86.54524519335493 39.168656224331585)
ROW2025-10-2011
W 11th from W Fountain Dr. to N. Adams St.
December 11, 2025 to January 8, 2026
This phase will last 2 weeks and will include BPW approved lane restrictions and Sidewalk closure that MUST have PROWAG compliant detours.
Engineering
LINESTRING(-86.55505480917334 39.1732160069451,-86.55488886983682 39.1732126799638,-86.55477872041509 39.17321489794077,-86.55046284669338 39.17322428630828,-86.54983914371228 39.173216523405415,-86.54984486550715 39.173271972837654,-86.5504242228181 39.17327751779115,-86.55047858224322 39.17327751779115,-86.55249417309649 39.17327529981614,-86.55275452614121 39.173276408819504,-86.55484833577131 39.17326699225663,-86.5549298749499 39.173270319171905,-86.55509867530658 39.17327808210055,-86.55505003784006 39.173215978711)
Road Closed for Tree Removal
E 12th St between N Walnut St and N Washington St
December 30, 2025 08:30 am to 12:00 pm
E 12th St from N Walnut St to N Washington St
Street
LINESTRING(-86.53352917124461 39.174428213437466,-86.53232392153265 39.17441199222887)
ROW2025-12-2164
808 W 2nd
December 30, 2025 to January 1, 2026
Lane restriction
Engineering
LINESTRING(-86.54288877812898 39.16145755567675,-86.54288591706784 39.16142760795995,-86.54255833002745 39.161426498737995,-86.54256119100675 39.161461992372125,-86.54288877812898 39.16145977399276)
SERVICE MASTER
200 E 5TH ST
December 31, 2025 to January 14, 2026
METERS 201A&B, 203A&B, 205A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53224146408141 39.166605473057615),LINESTRING(-86.53224146408141 39.166605473057615,-86.53219635417646 39.16660641830509))
ROW2025-09-1931
1610 E 3rd
January 2, 2026 to January 4, 2026
Lane closure for pole replacement
Engineering
LINESTRING(-86.5137607787289 39.16425310830547,-86.5137607787289 39.16423092570608,-86.51348469005248 39.16422981659181,-86.51348612054214 39.16425310830547,-86.51376220930038 39.16425310830547)
ROW2025-10-2022
2744 S Pinehurst DR
January 12, 2026 to January 26, 2026
Closure of southbound lane of S Pinehurst for one day between 01/12/2026 and 01/26/2026
Engineering
LINESTRING(-86.54999546989382 39.13680207219903,-86.54997615811988 39.13680456877418,-86.54997776737979 39.13646753807697,-86.54999868865923 39.13647003450524,-86.54999546989382 39.13680207219903)