Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Poplars Redevelopment 400 E 7th St November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
Bloomington Convention Center Project Lane Restriction 302 S College Ave February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street.
The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street.
Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
Arlington Multifamily Project Lane Closures 1210 W Arlington Rd March 2, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.
Mayer Najem has supplied maintenance of traffic plans for all work. As a condition of the issuance of the ROW permit they will also be required to post signage notifying the public about the lane shifts at least 3 weeks prior to closure implementation.
External Project
LINESTRING(-86.547514919906 39.17939904581016,-86.54805384529433 39.179662415790176,-86.54835845521869 39.179889457965004,-86.54879193846948 39.1802981323784,-86.5490848327994 39.18073404869537,-86.54922542261407 39.180897515881156)
Arlington Multifamily Utility Work 1210 W Arlington March 9, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.
Engineering
LINESTRING(-86.54747272130943 39.179383055603836,-86.54803768028326 39.179662430757844,-86.54853445455336 39.18009281733603,-86.54874874933653 39.180289133145806)
2nd St Curb Ramps and Bumpouts Project, Lane Restrictions. 2nd St between Lincoln and Park. At Lincoln, Grant, Dunn, Fess, and Park intersections will all have construction on all corners. March 30, 2026 to May 4, 2026
There will be a reconstruction of Curb Ramps and Bump Outs added along E 2nd St. This will be between Lincoln and Park. Intersections will have work at all corners. Lane restrictions will be in place durin construction times.
Engineering
LINESTRING(-86.53128722544561 39.16135201596276,-86.52402290101114 39.1613283829702,-86.52399242102139 39.161052663435925,-86.52380954418348 39.16107629652112)
ROW2026-02-2258 W Briarcliff Road, from N Kinser Pike to N Valleyview Dr. April 10, 2026 to May 15, 2026
Sections within Fritz Terrace - Single lane closures
Engineering
LINESTRING(-86.54661272171674 39.194652066572786,-86.5466571326572 39.19463731572836,-86.54668039553079 39.19468648519771,-86.54670365840437 39.19475860035712,-86.54672269166457 39.19491266431339,-86.54672269166457 39.19504378230795,-86.54677987611622 39.19952873370184,-86.54672960066402 39.19952316785219,-86.54667234303443 39.19496783848348,-86.54665729320402 39.19475556030636,-86.54660913374677 39.194654086445695)
Centerpoint Gas Main Work 903 W Kirkwood April 13, 2026 to May 18, 2026
Lane and sidewalk closures on W Kirkwood with impacts to Elm, Waldron, and Maple Streets to accommodate gas main relocations and improvements. This includes 702 linear ft of boring and 88 sq ft of excavations that include sidewalk panels and street cuts.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5452439357437 39.1666471248289,-86.54374484935857 39.166634312511974,-86.54220346658947 39.166621138696),LINESTRING(-86.54374524779838 39.166606289472895,-86.54374524779838 39.166520906379134))
2026 Downtown Alley Project Portions of the alley between College and Walnut spanning from 7th to 11th April 27, 2026 to May 31, 2026
Portions of the alley between College and Walnut spanning from 7th to 11th will be closed intermittently for resurfacing as well as other improvements
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53422310435563 39.16908908812425,-86.53423469094652 39.16945976364744),LINESTRING(-86.53422303305354 39.169575269400724,-86.53421354987455 39.17045008319752),LINESTRING(-86.5341873463536 39.17176251841758,-86.53418330106125 39.1721072951365,-86.53417890158747 39.17248225650823,-86.53417022127073 39.17322206263546),LINESTRING(-86.53418950989536 39.17210733891983,-86.53470880295583 39.17209943374658),LINESTRING(-86.534181307079 39.17248228190087,-86.5347171620767 39.17247842355172))
ROW2026-01-2242 S Smith and E Moores Pike April 27, 2026 to May 1, 2026
Replacing equipment only on existing poles
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.48071828101652 39.15912787544181,-86.48072473490025 39.15912787544181,-86.48048343155216 39.15023957796592,-86.48044860449065 39.15023957796592,-86.48068608109425 39.15912813522789,-86.48072631422947 39.15912813522789),LINESTRING(-86.48040725255655 39.15017893465193,-86.4760203189885 39.15020677572875,-86.4760203189885 39.150233816185846,-86.48041091558298 39.150202446885885,-86.4804095744785 39.150178526471365))
North Jefferson Street North Jefferson Street; 8th to 10th April 27, 2026 to June 30, 2026
Intermittent lane closures will take place for the duration of the project to accommodate storm water improvements and Sidewalk installation.
Engineering
LINESTRING(-86.50719158491388 39.17130354710221,-86.507172758117 39.16955204365513)
ROW2026-03-2398 N Gates DR April 28, 2026 to May 13, 2026
lane closure
Engineering
LINESTRING(-86.57644358088342 39.17105808647247,-86.57641005327072 39.17105808647247,-86.5764207821068 39.17091668582847,-86.57646503855553 39.17091876525177,-86.57644894530145 39.17105808647247)
Cell Equipment Upgrade 1469 E 17th St East bound lane restriction at 1469 E 17th St April 29, 2026 to May 1, 2026
Lane restriction to accommodate a bucket truck for equipment upgrade.
Engineering
LINESTRING(-86.51086903086593 39.17883370933555,-86.51084957361375 39.17883622314085,-86.51064202959047 39.17885884738487)
ROW2026-02-2285 2110 E Rhorer Road May 1, 2026 to May 22, 2026
Lane closures with flaggers
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50494436329681 39.125937410817585,-86.50606661709679 39.12518006615656,-86.50642721588834 39.12496446024147,-86.50709388389804 39.12456190312733,-86.50733662845039 39.12442407795959,-86.50754771066983 39.12431218010033,-86.50840435267703 39.123870045356625,-86.5092398864623 39.12344701260284,-86.50975176084442 39.123202744146084,-86.50989600036102 39.123131783318314,-86.51010356454347 39.12304854071769,-86.51058201757418 39.12286567957756,-86.51071218494283 39.12282474045128,-86.51087049660741 39.12274968532469,-86.51100594103156 39.12267053619547,-86.51116425269613 39.12254635376178,-86.51122933638047 39.122498591228975,-86.51136302178611 39.122341656964664,-86.51145976780336 39.12219427490248,-86.51153540559856 39.122023693427025,-86.51157058596847 39.121915885721506,-86.51157762204245 39.121713916411466,-86.51157410400546 39.12152559315467,-86.51157410400546 39.12146827728094),LINESTRING(-86.51157410400546 39.12146827728094,-86.51157762204245 39.12152013450202))
Milling and Resurfacing on N Bankers Dr N Bankers Dr from E Rusgan Dr to E Blue Ridge Dr May 4, 2026 06:00 am to 16:00 pm May 7, 2026
Lane Restrictions and No Parking on N Bankers Dr from E Rusgan Dr to E Blue Ridge Dr for milling and resurfacing.
Street
LINESTRING(-86.53274384640756 39.20072518654507,-86.53248399780713 39.20017981773913,-86.53242986268206 39.199840008880756,-86.53238655458199 39.199256876268635,-86.5323594870194 39.19881218195894,-86.53227828433177 39.198560466951136,-86.5321862546191 39.198325532130184,-86.53200219519383 39.1980905965236,-86.53178024118097 39.19790180841329,-86.53149873853052 39.19773819164067,-86.53105483050483 39.197578769803414,-86.53080580892943 39.19750325407003)
Milling and Resurfacing on E Rusgan Dr E Rusgan Dr from N Ramble Rd W to N Ramble Rd E May 4, 2026 06:00 am to 16:00 pm May 14, 2026
Lane Restrictions and No Parking on E Rusgan Dr from N Ramble Rd W to N Ramble Rd E for milling and resurfacing.
Street
LINESTRING(-86.53393847629839 39.20076953813148,-86.53313556513243 39.200642157512476,-86.53299015602362 39.20065685528803,-86.53274991488735 39.20074504187653,-86.53247806307525 39.20093121319994,-86.5322314998038 39.201038996372176,-86.53179527247741 39.20124966300406,-86.53144123290816 39.20140153855607,-86.53137801155651 39.201435832990086)
Milling and Resurfacing on N Ramble Road Ct N Ramble Road Ct May 4, 2026 06:00 am to 16:00 pm May 7, 2026
Lane Restrictions and No Parking on N Ramble Road Ct from N Ramble Rd to Dead End for milling and resurfacing.
Street
LINESTRING(-86.53295458460987 39.20536480771153,-86.5330049880507 39.20601761262449)
CBU - Stormwater Maintenance Near 2803 North Blue Ridge Drive - West Lane May 6, 2026 to May 13, 2026
Beginning Wednesday, May 6 at 9:00 a.m. and continuing for approximately one week, City of Bloomington Utilities (CBU) will implement a lane restriction near 2803 North Blue Ridge Drive to complete stormwater maintenance in the area.
CBU staff will coordinate with local traffic to maintain access to nearby residences and driveways throughout the project. Motorists are advised to use caution and watch for CBU crews and equipment while work is underway. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53259262253322 39.19648239203951,-86.53184477943428 39.1958402801169,-86.53177483727396 39.19561929218884),LINESTRING(-86.53177483727396 39.19561929218884,-86.53176945710777 39.19561929218884))
ROW2026-03-2393 Intersection of W Allen Street and Strong Drive. Southbound Strong Drive and Eastbound West Allen Street. 3 Days between listed dates May 7, 2026 to May 21, 2026
Lane Closures
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54477149128924 39.15562936891084,-86.54431223886432 39.15563098796676),LINESTRING(-86.544316913891 39.15561104951141,-86.54425613854426 39.1552811578847))
Crown Castle Core Hole Road Repair 900 E Cottage Grove Ave May 7, 2026 to May 8, 2026
Road repair for multiple core holes left after Crown Castle boring project. Closures should only require a few hours.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52341754471516 39.17250337078519,-86.52347789441798 39.172502331097036,-86.52347521220898 39.17245970386708),LINESTRING(-86.52352751528477 39.17250648984975,-86.52352751528477 39.17247945795248))
ROW2026-04-2452 and 2451 336 and 326 N Jefferson May 7, 2026 to May 9, 2026
Lane restriction
Engineering
LINESTRING(-86.5071589025673 39.16947988966342,-86.50718572465743 39.16947988966342,-86.50718706576194 39.169195002270385,-86.50715622035827 39.169195002270385,-86.50715756146278 39.16947988966342)
11th Street Traffic Calming Project Along W. 11th street between Maple and Monroe May 7, 2026 to May 15, 2026
This project includes the installation of speed cushions and pavement markings. There will be lane restrictions with flagging in place.
Engineering
LINESTRING(-86.5418227032382 39.17325773342989,-86.5470631573579 39.17324428077998)
ROW2026-02-2266 N Dunn Street Between 6th Street and Kirkwood Avenue May 11, 2026 to May 12, 2026
Single lane closure
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52826479257214 39.16750705710567,-86.52826438199187 39.167495570912706,-86.52824869931806 39.167056838687984,-86.52821248949637 39.16705579891928,-86.52822858275044 39.16751329567782,-86.52826345146765 39.16751329567782),LINESTRING(-86.52826211036313 39.16750289805725,-86.52826211036313 39.16749561972199))
ROW2026-02-2266 N Grant street at the intersection with 6th Street May 11, 2026 to May 19, 2026
Single lane restriction
Engineering
LINESTRING(-86.52981814928978 39.16751845098233,-86.52978864499062 39.16751741122039,-86.52978998609512 39.167322975472985,-86.52981680818527 39.16732401523777,-86.52981546708077 39.16751949074421)
2026 Kirkwood Brick Paver Repair Project Kirkwood b/t Indiana and Dunn May 11, 2026 to May 31, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.52700032039083 39.166520058681954,-86.52815935243942 39.166529424041414)
Milling & Resurfacing on N Ramble Rd W & Ramble Rd E N Ramble Rd W from N Blue Ridge Dr to N Ramble Rd Ct, N Ramble R E from N Ramble Rd Ct to E Blue Ridge Dr May 11, 2026 to May 14, 2026
Milling & Resurfacing with lane restrictions from 6am to 3pm.
Street
LINESTRING(-86.533553475235 39.19742500501877,-86.53378049262186 39.19773288590588,-86.53417777304882 39.20016949561935,-86.53396210653132 39.2007412509997,-86.53407561522475 39.201656049929085,-86.53347524782174 39.20509596064983,-86.53299851130936 39.20532464732136,-86.53265798522908 39.205280669173135,-86.53226070480213 39.2048232947991,-86.53169316133501 39.20447146633089,-86.5315796526416 39.20429555143593,-86.53152289829488 39.2018502887729,-86.5314774948175 39.201674367313444,-86.53120507395327 39.20125215401333,-86.53095535482775 39.19975679483312,-86.5305126709234 39.199079474613086,-86.5298089170242 39.19865724571716,-86.52932082964249 39.19851650218797)
ROW2026-04-2450 910 South Adams Street May 11, 2026 to May 25, 2026
lane restriction, 2 days between listed dates
Engineering
LINESTRING(-86.55057763162391 39.15582934542621,-86.5505548328473 39.15582934542621,-86.5505575150563 39.155685834293166,-86.55058031383294 39.15568063460901,-86.5505789727284 39.1558283054915)
ROW2026-04-2458 717 S Henderson Street May 12, 2026 to May 13, 2026
lane closures for concrete truck
Engineering
LINESTRING(-86.52713651099363 39.1597752787919,-86.5271660152928 39.1597752787919,-86.52715662756124 39.15954130622103,-86.52712444105306 39.15954130622103,-86.52713516988912 39.1597773585446)
2026 Family Night Out on Kirkwood Kirkwood between Lincoln and Grant (300 block) May 13, 2026 14:00 pm to 08:00 am May 14, 2026 monthly on Wednesday for 6 times
Family Night Out is a monthly block party designed for easy, low-pressure community connection right in the heart of downtown.
On the second Wednesday of every month from 4:30–8pm, Kirkwood Avenue in front of the Monroe County Public Library transforms into a shared dining room and open-air gathering space. Bring your people, grab takeout from participating local restaurants offering special deals, and sit down together at long family-style tables set right in the middle of the street.
Along the block you’ll find local art vendors, community partners hosting hands-on activities, and a rotating lineup of buskers filling the air with live music. The Front Porch Trailer brings casual lawn games and extra space to hang out, play, and linger a little longer.
It’s part dinner, part street fair, part neighborhood hangout. Come eat, wander, play, and stay awhile.
Public Works
LINESTRING(-86.53105275175663 39.16656784835857,-86.52981581908548 39.16655345688898)
Road Closed for Limb Removal N Washington St from E 7th St to E 8th St May 14, 2026 07:00 am to 08:00 am
N Washington St between E 7th St and E 8th St will be closed for around 1 hour for a limb removal.
Street
LINESTRING(-86.53233585525223 39.16859733300376,-86.53231332162181 39.16946733938866)
ROW2026-05-2480 2017 E 2nd Street May 15, 2026 to May 22, 2026
ROW2026-05-2480
Engineering
LINESTRING(-86.50858023484722 39.16102699027448,-86.50956906987784 39.16101342005743,-86.50956906987784 39.16099080302314,-86.50858752714095 39.161003242392894,-86.50858461022345 39.16102812112581)
ROW2026-02-2288 1347 E Bradshire Street May 15, 2026 to May 30, 2026
1-2 day Lane restriction
Engineering
LINESTRING(-86.51593333546191 39.135956936316205,-86.51654887604005 39.13596413396911,-86.51654887604005 39.13598692653184,-86.51593333546191 39.13597972888124,-86.51593333546191 39.135959335533926)
ROW2026-04-2440 1201 12th Street May 15, 2026 to May 22, 2026
Lane closures
Engineering
LINESTRING(-86.54826989601018 39.17423464860465,-86.5480816741068 39.17423626988253,-86.54768222540075 39.17421195071091,-86.54720748793336 39.174158448503704)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
ROW2025-05-2495 312 S Arbutus May 18, 2026 to May 20, 2026
Lane closure
Engineering
LINESTRING(-86.5122098348092 39.16399511320827,-86.51218584881249 39.16399225207914,-86.51218953896583 39.163744763971124,-86.51218769388916 39.16365034631312,-86.51221721511591 39.16363604059637,-86.51221167988588 39.16399940490166)
Milling and Resurfacing on Madison St Madison St from W 3rd St to W 7th St May 18, 2026 to May 22, 2026
No Parking and Lane Restrictions for milling and resurfacing on Madison St from W 3rd St to W 7th St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53742488411388 39.164716509869436,-86.5373985613592 39.16854307732754)
North Union Street 7th street to 10th street May 18, 2026 to June 1, 2026
A full Road closure for the installation of a raised crosswalk and new storm structure.
Detour will be East 7th street, North Jefferson Street and East 10th Street.
Engineering
LINESTRING(-86.50942855862212 39.1682802786076,-86.50944968575389 39.17150701419146)
ROW2026-05-2473 2500 W 3rd STreet May 18, 2026 to May 20, 2026
Lane closures
Engineering
LINESTRING(-86.56840766975048 39.164616540596825,-86.56840901085499 39.164585346445875,-86.56802277275685 39.16457910761403,-86.56802411386136 39.164617580401625,-86.56840766975048 39.164617580401625)
Milling and Resurfacing on N Blue Slopes Dr N Blue Slopes Dr from E Blue Ridge Dr to the Dead End May 18, 2026 06:00 am to 16:00 pm May 21, 2026
Lane Restrictions and No Parking on N Blue Slopes Dr from E Blue Ridge Dr to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.53397334312879 39.19710537904504,-86.5334325220167 39.19636574525481,-86.53328618218636 39.19613892266577,-86.53321619357185 39.19597127071634,-86.53322255617317 39.195833204104645,-86.53323528137582 39.19566062045848,-86.53324800657845 39.19553734616596,-86.53315893016 39.19529079693211,-86.53305712853889 39.1950541088537)
Milling and Resurfacing on N Blue Ridge Ct N Blue Ridge Ct from E Clover Ln to the Dead End May 18, 2026 06:00 am to 16:00 pm May 28, 2026
Lane Restrictions and No Parking on N Blue Ridge Ct from E Ramble Rd to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.53157243056752 39.19520161421653,-86.5318149047532 39.194663255722645,-86.5318607782478 39.19448549493674,-86.53184767153506 39.19430265480207,-86.53178213797136 39.1941858400225,-86.53167073091306 39.19411981419162,-86.53140204330191 39.19411473527899,-86.53115956911621 39.1941604454795,-86.53097607513786 39.19420615565025,-86.53087777479229 39.19422139236727,-86.53056321368653 39.19423662908102)
CBU Stormwater Maintenance Intersection of South Walnut Street and East Dodds Street May 18, 2026 to May 20, 2026
CBU will be performing stormwater maintenance near the intersection of South Walnut Street and East Dodds Street.
Utilities
LINESTRING(-86.5336026474676 39.15718592493943,-86.53360700048215 39.15739519939967)
CBU - Stormwater Maintenance A section of South Kingston Drive between East Volt Street and East Amp Way May 18, 2026 to May 19, 2026
Beginning Monday, May 18 at 7:30 a.m., City of Bloomington Utilities (CBU) will close a section of South Kingston Drive between East Volt Street and East Amp Way to address a sinkhole that has formed in the area.
Local access to residences and businesses will be maintained throughout the project. Motorists are advised to use alternate routes and to use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.49303828225682 39.16338612360897,-86.49323839610317 39.162644993072405,-86.49324265384459 39.16237924057717)
Milling and Resurfacing on W 7th St W 7th St from N Rogers St to N Morton St May 18, 2026 06:00 am to 18:00 pm May 22, 2026
No Parking and Lane Restrictions for milling and resurfacing W 7th St from N Rogers St to N Morton St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53865085720875 39.16859424134472,-86.53616214458206 39.16857315417187)
ROW2026-05-2502 Alley north of 4th Street between S Washington and S Lincoln. May 18, 2026
Alley closure
Engineering
LINESTRING(-86.5322606300342 39.16608178612216,-86.5322606300342 39.166057871105835,-86.53124004950402 39.16605371197173,-86.53123870839951 39.16607970655585,-86.5322592889297 39.16608178612216)
Milling and Resurfacing on W 6th St W 6th St from N Rogers St to N College Ave May 18, 2026 06:00 am to 18:00 pm May 22, 2026
No Parking and Lane Restrictions for milling and resurfacing W 6th St from N Rogers St to N College Ave. This will be completed by E&B Paving.
Street
LINESTRING(-86.53867252858575 39.167608744444436,-86.5349179538741 39.16756667899753)
ROW2026-02-2266 Dunn Street Just South of the intersection with 6th Street May 18, 2026 to June 1, 2026
Lane Closure-Dunn Street Just South of the intersection with 6th Street
Engineering
LINESTRING(-86.52830445333508 39.167510316603284,-86.52829908891705 39.167312761541524,-86.52826422019986 39.16731068201162,-86.5282709257224 39.16751343588925,-86.5283071355441 39.16751135636531)
Milling and Resurfacing on S Henderson St S Henderson St from E Hillside Dr to E 3rd St May 20, 2026 to May 29, 2026
No Parking and Lane Restrictions for milling and resurfacing S Henderson St from E Hillside Dr to E 3rd St. This will be completed by E&B Paving.
Street
LINESTRING(-86.52694883489212 39.15068296304716,-86.52701695875471 39.155582705659185,-86.52720429937683 39.16049531257252,-86.52728945420508 39.163241997025494,-86.52722133034248 39.163506095648074,-86.52696586585778 39.16388903688966,-86.52691477296084 39.16424556651634)
Centerpoint Energy Gas Main Relocation 2nd and Morton May 20, 2026 to May 27, 2026
Lane closures during normal construction hours and overnight road closures on West 2nd Street at South morton Street for gas main relocation. Trench cut running north/south on Morton across 2nd with a tap pit on each end that measures 3' x 115' x 5'. 1-3 days of overnight work to occur between May 20-27, 2026.
External Project
LINESTRING(-86.53666335108284 39.16140538881646,-86.53587977918097 39.16140175074344)
Centerpoint Energy Gas Main Relocation 2nd and Morton May 20, 2026 to May 27, 2026
Lane closures during normal construction hours and overnight road closures on West 2nd Street at South morton Street for gas main relocation. Trench cut running north/south on Morton across 2nd with a tap pit on each end that measures 3' x 115' x 5'. 1-3 days of overnight work to occur between May 20-27, 2026.
External Project
LINESTRING(-86.53641056281343 39.16140345591381,-86.53618973267234 39.16140130213918)
ROW2026-04-2436 711 E Cottage Grove Avenue May 21, 2026 to June 25, 2026
3 phases of 3 day closures between the listed dates
Engineering
LINESTRING(-86.52527259943822 39.17263101095142,-86.5252299785262 39.17263149579409,-86.52524094476512 39.173064236598776,-86.52527037828621 39.17306472414509,-86.52527037828621 39.17263221597463)
2026 Summer Science Blastoff Outside WonderLab - 4th b/t Madison and B-Line; alley b/t Wonderlab and adjacent apartment building May 21, 2026 12:00 pm to 22:00 pm
2026 Summer Science Blastoff
Public Works
LINESTRING(-86.53738893000485 39.1656267388484,-86.53614079148065 39.1656111034043)
ROW2026-03-2393 1009 W Allen Street May 21, 2026 to June 11, 2026
10 days of lane closure between listed dates
Engineering
LINESTRING(-86.54422811005446 39.15344293428984,-86.54424889154733 39.15345367773625,-86.54434587184734 39.15339727462441,-86.54432162677234 39.153386531169474,-86.54423503721874 39.153441591358956)
CBU - Stormwater Maintenance East Wylie Street will be closed to through traffic between South Walnut Street and South Lincoln Street May 22, 2026 to May 29, 2026
Beginning Tuesday, May 22 and continuing through Friday, May 29, City of Bloomington Utilities (CBU) will implement a lane restriction on South Walnut Street at the intersection with East Wylie Street to complete utility work in the area.
In addition, East Wylie Street will be closed to through traffic between South Walnut Street and South Lincoln Street for the duration of the work.
Local access to residences and businesses will be maintained throughout the project. Motorists are advised to use alternate routes and to use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53360286420642 39.15796944599086,-86.53244991075593 39.157948952939506)
CBU - Stormwater Maintenance South Walnut Street at the intersection with East Wylie Street May 22, 2026 to May 29, 2026
Beginning Tuesday, May 22 and continuing through Friday, May 29, City of Bloomington Utilities (CBU) will implement a lane restriction on South Walnut Street at the intersection with East Wylie Street to complete utility work in the area.
In addition, East Wylie Street will be closed to through traffic between South Walnut Street and South Lincoln Street for the duration of the work.
Local access to residences and businesses will be maintained throughout the project. Motorists are advised to use alternate routes and to use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.5336392295421 39.158109627277724,-86.53363517342315 39.15861284795568)
ROW2026-04-2442 1817 W Gray Street May 25, 2026 to June 8, 2026
Lane restrictions
Engineering
LINESTRING(-86.55805513236729 39.17275844608548,-86.55854329440801 39.17276884292903,-86.55860230300634 39.17277196198182,-86.55867472264974 39.17278963661158,-86.55875921223371 39.17287177159736)
Crane Installation at 115 E Kirkwood Project Site 115 E Kirkwood Ave May 26, 2026
Single day full road and northern sidewalk closure in 100 block of E Kirkwood Ave for crane installation.
External Project
LINESTRING(-86.53334784466709 39.166593749318025,-86.532451286797 39.16659193908728)
Milling and Resurfacing on E 9th St E 9th St from N Morton St to N Walnut St May 26, 2026 to May 29, 2026
No Parking and Lane Restrictions for milling and resurfacing on E 9th St from N Morton St to N Walnut St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53608743060303 39.17047101400527,-86.53485480679527 39.170467407905534,-86.53360822875577 39.170467407905534)
ROW2026-02-2299 3200 S S Southern Oaks DR May 26, 2026 to June 2, 2026
lane closure
Engineering
LINESTRING(-86.49877046627407 39.133002470625314,-86.5004579642037 39.13192734427403)
North Adams Full Road Closure 7 days 300 Block N. Adams Cross street W. 7th May 26, 2026 to June 2, 2026
Repair of the underside of the North Adams railroad bridge will require a 7 day full road closure. Approved by the BPW. Detour W. Kirkwood, N. Rogers, W. 11th St
Engineering
LINESTRING(-86.54965219930335 39.16954259891111,-86.54964446502065 39.168930980032144)
ROW2026-05-2485 1210 E 3rd St May 26, 2026 to June 12, 2026
Alley closure
Engineering
LINESTRING(-86.51871401738929 39.16352579691795,-86.51851681159239 39.1635323034223,-86.51836366240971 39.16352742354408)
Milling and Resurfacing on E 10th St E 10th St from N Morton St to N Walnut St May 26, 2026 to May 29, 2026
No Parking and Lane Restrictions for milling and resurfacing on E 10th St from N Morton St to N Walnut St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53605654999556 39.171679342553574,-86.53363647126123 39.171679342553574)
Powerline Trail Project Closure 1609 S Rogers St May 27, 2026 to June 7, 2026
Road Closure of S Rogers for installation of raised crosswalk
Engineering
LINESTRING(-86.5388343575103 39.148213444091226,-86.53884496544991 39.147853117175856)
ROW2026-03-2398 N Gates Drive May 27, 2026 to June 10, 2026
Lane closure for 2 day between listed dates
Engineering
LINESTRING(-86.57642511173452 39.171117615897145,-86.57640115207337 39.17110936032398,-86.5764197873654 39.17093599306338,-86.57645705794934 39.17093805696186,-86.57643043610365 39.171117615897145)
ROW2026-05-2472 711 E Cottage Grove Avenue May 28, 2026 to May 29, 2026
lane closure
Engineering
LINESTRING(-86.5252294007229 39.17255700066309,-86.52523208293192 39.17253516722403,-86.524886077969 39.172532048160775,-86.52488473686448 39.1725518022258,-86.5252294007229 39.17255388160075)
CBU - Sanitary Sewer Maintenance East 10th Street at North Washington Street intersection May 28, 2026 to May 29, 2026
Early Thursday, May 28, City of Bloomington Utilities (CBU) will close East 10th Street at North Washington Street to complete sanitary sewer work in the area. The closure is expected to last one working day, though the duration may be shorter depending on field conditions.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53238116601452 39.17167360235089,-86.53233935596695 39.17167360235089,-86.53230590792889 39.17167360235089),LINESTRING(-86.53233935596695 39.17167489889195,-86.53234102836885 39.171721574353484))
ROW2026-05-2478 220 W Gordon Pike May 28, 2026 to May 29, 2026
Closure of center turn lane and Westbound lane with Flaggers
Engineering
LINESTRING(-86.53363662023838 39.12153045263207,-86.53363930244741 39.12149091584672,-86.53322624225912 39.12147739009927,-86.53321953673658 39.12151692689224,-86.5336379613429 39.12153149307349)
CBU - Sanitary Sewer Maintenance North Washington Street will be closed to through traffic between East 10th Street and East Cottage Grove Avenue for approximately one week. May 29, 2026 to June 5, 2026
Beginning Friday, May 28, City of Bloomington Utilities (CBU) will close North Washington Street between East 10th Street and East Cottage Grove Avenue to complete sanitary sewer work in the area. The closure is expected to last one working day, though the duration may be shorter depending on field conditions.
Utilities
LINESTRING(-86.5323420119938 39.171692818151826,-86.53234656137657 39.17251459019579)
Utility Overlashing Project for Comcast W Tapp Rd, west bound lane moving closure from Rockport to Adams St May 29, 2026
Slow rolling lane closure in the west bound lane of Tapp Rd while crews complete cable installation by method of overlashing. Flaggers on site for one lane road.
Engineering
LINESTRING(-86.54922568626743 39.13637769537445,-86.55357998192565 39.13649803501221,-86.55407152666963 39.1365774649629,-86.55421489388664 39.136676752275235,-86.55437874213463 39.13668469525416,-86.55449650806288 39.136601293930596,-86.55467059682637 39.13655760748361,-86.55489588816737 39.13654172149617,-86.5550546161576 39.136521864006795)
CBU Sanitary Sewer Maintenance North Washington Street will be closed to through traffic between East 10th Street and East Cottage Grove Avenue May 29, 2026 to June 12, 2026
Beginning early Tuesday, May 26, City of Bloomington Utilities (CBU) will close East 10th Street at North Washington Street to complete sanitary sewer work in the area. The closure is expected to last one working day, though the duration may be shorter depending on field conditions.
Following the work on East 10th Street, North Washington Street will be closed to through traffic between East 10th Street and East Cottage Grove Avenue for approximately one week. After that, the closure will shift to North Washington Street between East Cottage Grove Avenue and just south of East 11th Street for an additional week.
Utilities
LINESTRING(-86.53234531533188 39.17170717659417,-86.53233768739898 39.17251536456459)
Please enable Javascript
To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.
This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.