Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)
Construction for 115 E Kirkwood Lofts 115 E Kirkwood Ave January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
Poplar Redevelopment 400 E 7th St February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street. The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street. Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
North Jefferson Street North Jefferson Street; 8th to 10th April 27, 2026 to June 30, 2026
Intermittent lane closures will take place for the duration of the project to accommodate storm water improvements and Sidewalk installation.
Engineering
LINESTRING(-86.50719158491388 39.17130354710221,-86.507172758117 39.16955204365513)
W Club House Dr Closure W Club House Dr, west of N Old SR 37 May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)
ROW2026-04-2420 North Woodlawn Avenue, Between East 13th Street and E 12th Street June 1, 2026 to July 17, 2026
Full road closure for work associated with ROW2026-04-2420
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52363343342134 39.175180011100736,-86.52357676134712 39.17517835324318,-86.52356235488244 39.17517793180343,-86.52353467405678 39.174556420441746,-86.52351149891358 39.17432510842613,-86.52358971502188 39.17432510842613,-86.52361031242812 39.17454024856099,-86.52361299463715 39.17470763331403,-86.52363445230927 39.17517891077475,-86.52360763021912 39.17517891077475),LINESTRING(-86.52360763021912 39.17517891077475,-86.52357678481546 39.175177871126124))
West 2nd Street Modernization and Safety Improvements 2nd Street between Walker Street and Morton Street June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)
ROW2026-06-2540 3230 S Walnut June 4, 2026 to August 13, 2026
Lane closure for electric work
Engineering
LINESTRING(-86.53139824302374 39.12760036170292,-86.53141246531645 39.12667727495517)
2026 Kirkwood Brick Paver Repair Project Kirkwood b/t Lincoln and Washington June 22, 2026 to July 1, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.53116852983791 39.166563238379524,-86.53228402846483 39.16657370606072)
Milling and Resurfacing on E Sunny Slopes Dr E Sunny Slopes Dr from S Brookside Dr to S Walnut Street Pike June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on E Sunny Slopes Dr from E Ridgeview Dr to S Walnut Street Pike for milling and resurfacing.
Street
LINESTRING(-86.53063890578146 39.13367223884842,-86.5300243068952 39.1336770542965,-86.52978840025197 39.133600007087324,-86.52956490974788 39.133474805192634,-86.52947799677406 39.13337849589141,-86.52931658696555 39.133108829147204,-86.52916138522659 39.132940286907655,-86.52893168665292 39.13282471485314,-86.52865853159237 39.13279100630152,-86.52836054425356 39.13279100630152,-86.52818051023638 39.132786190792814,-86.52798806008008 39.13274766671137,-86.52765282432391 39.132651356415664,-86.52739208540247 39.132564677036925,-86.52703822543765 39.13253096836081,-86.5268519833509 39.13253096836081)
Milling and Resurfacing on E Ridgeview Dr E Ridgeview Dr from E Sunny Slopes Dr to S Walnut St June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on E Ridgeview Dr from E Sunny Slopes Dr to S Walnut St for milling and resurfacing.
Street
LINESTRING(-86.52796476408695 39.13271231234182,-86.5279816575028 39.13226240726084,-86.52802670661178 39.1321313664055,-86.52812243596834 39.13202653354563,-86.52826884557248 39.13194790879831,-86.528454673147 39.131899860298404,-86.52964284339603 39.131886756156376,-86.53029605547609 39.131873652011905,-86.53045372735745 39.131869283963226,-86.53074091542715 39.13191296443799,-86.53094926755612 39.13195664488569,-86.53113509513061 39.1319697490147,-86.53138286522994 39.131987221182925)
Milling and Resurfacing on S Brookside Dr S Brookside Dr from E Ridgeview Dr to E Sunny Slopes Dr June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on S Brookside Dr from E Sunny Slopes Dr to E Ridgeview Dr for milling and resurfacing.
Street
LINESTRING(-86.53071400558765 39.13194682305814,-86.53065657794518 39.13365626711817)
CBU - Sanitary Sewer Main Replacement North Washington Street between East Cottage Grove Avenue and just south of East 11th Street for an additional week. June 22, 2026 to July 3, 2026
This project began on 5/26 and projects delays have extended the original timeline. Local access to residences and businesses will be maintained throughout the project whenever possible. Motorists are advised to use alternate routes and to use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53232442635785 39.17256124668796,-86.532311874042 39.17439067837003)