Choose types

Allen St. Bridge

Bridge between S Morton and S Walnut (150-156 W Allen St)

January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53517957550848 39.155618114825785,-86.53479233158195 39.15561291513657)

Poplars Redevelopment

400 E 7th St

November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement. This phase includes: Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal. Bike lane closure from 11/22/25 to 3/2/26. Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)

Construction for 115 E Kirkwood Lofts

115 E Kirkwood Ave

January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)

Bloomington Convention Center Project Lane Restriction

302 S College Ave

February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)

Poplar Redevelopment

400 E 7th St

February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street. The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street. Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)

Arlington Multifamily Project Lane Closures

1210 W Arlington Rd

March 2, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025. Mayer Najem has supplied maintenance of traffic plans for all work. As a condition of the issuance of the ROW permit they will also be required to post signage notifying the public about the lane shifts at least 3 weeks prior to closure implementation.
External Project
LINESTRING(-86.547514919906 39.17939904581016,-86.54805384529433 39.179662415790176,-86.54835845521869 39.179889457965004,-86.54879193846948 39.1802981323784,-86.5490848327994 39.18073404869537,-86.54922542261407 39.180897515881156)

Arlington Multifamily Utility Work

1210 W Arlington

March 9, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.
Engineering
LINESTRING(-86.54747272130943 39.179383055603836,-86.54803768028326 39.179662430757844,-86.54853445455336 39.18009281733603,-86.54874874933653 39.180289133145806)

North Jefferson Street

North Jefferson Street; 8th to 10th

April 27, 2026 to June 30, 2026
Intermittent lane closures will take place for the duration of the project to accommodate storm water improvements and Sidewalk installation.
Engineering
LINESTRING(-86.50719158491388 39.17130354710221,-86.507172758117 39.16955204365513)

2026 Family Night Out on Kirkwood

Kirkwood between Lincoln and Grant (300 block)

May 13, 2026 14:00 pm to 08:00 am May 14, 2026 monthly on Wednesday for 6 times
Family Night Out is a monthly block party designed for easy, low-pressure community connection right in the heart of downtown. On the second Wednesday of every month from 4:30–8pm, Kirkwood Avenue in front of the Monroe County Public Library transforms into a shared dining room and open-air gathering space. Bring your people, grab takeout from participating local restaurants offering special deals, and sit down together at long family-style tables set right in the middle of the street. Along the block you’ll find local art vendors, community partners hosting hands-on activities, and a rotating lineup of buskers filling the air with live music. The Front Porch Trailer brings casual lawn games and extra space to hang out, play, and linger a little longer. It’s part dinner, part street fair, part neighborhood hangout. Come eat, wander, play, and stay awhile.
Public Works
LINESTRING(-86.53105275175663 39.16656784835857,-86.52981581908548 39.16655345688898)

W Club House Dr Closure

W Club House Dr, west of N Old SR 37

May 16, 2026 to December 31, 2031
W Club House Dr east of the Sycamore Shelter and to the intersection at N Old SR 37 has been closed. The Sycamore Shelter can still be accessed from the west via Kinser Pike and Club House Dr. Monroe County has accepted ownership of the bridge but does not currently have funding for repairs as of 8/3/26. A date for re-opening will be contingent upon necessary bridge repairs and is currently not known.
Engineering
LINESTRING(-86.53707976211632 39.19811710429795,-86.53700130750263 39.19812645808193)

ROW2026-03-2393

1009 W Allen Street

May 21, 2026 to June 11, 2026
10 days of lane closure between listed dates
Engineering
LINESTRING(-86.54422811005446 39.15344293428984,-86.54424889154733 39.15345367773625,-86.54434587184734 39.15339727462441,-86.54432162677234 39.153386531169474,-86.54423503721874 39.153441591358956)

ROW2026-04-2436

711 E Cottage Grove Avenue

May 21, 2026 to June 25, 2026
3 phases of 3 day closures between the listed dates
Engineering
LINESTRING(-86.52527259943822 39.17263101095142,-86.5252299785262 39.17263149579409,-86.52524094476512 39.173064236598776,-86.52527037828621 39.17306472414509,-86.52527037828621 39.17263221597463)

ROW2026-04-2442

1817 W Gray Street

May 25, 2026 to June 8, 2026
Lane restrictions
Engineering
LINESTRING(-86.55805513236729 39.17275844608548,-86.55854329440801 39.17276884292903,-86.55860230300634 39.17277196198182,-86.55867472264974 39.17278963661158,-86.55875921223371 39.17287177159736)

ROW2026-05-2485

1210 E 3rd St

May 26, 2026 to June 12, 2026
Alley closure
Engineering
LINESTRING(-86.51871401738929 39.16352579691795,-86.51851681159239 39.1635323034223,-86.51836366240971 39.16352742354408)

Powerline Trail Project Closure

1609 S Rogers St

May 27, 2026 to June 7, 2026
Road Closure of S Rogers for installation of raised crosswalk
Engineering
LINESTRING(-86.5388343575103 39.148213444091226,-86.53884496544991 39.147853117175856)

ROW2026-03-2398

N Gates Drive

May 27, 2026 to June 10, 2026
Lane closure for 2 day between listed dates
Engineering
LINESTRING(-86.57642511173452 39.171117615897145,-86.57640115207337 39.17110936032398,-86.5764197873654 39.17093599306338,-86.57645705794934 39.17093805696186,-86.57643043610365 39.171117615897145)

CBU - Sanitary Sewer Maintenance

North Washington Street will be closed to through traffic between East 10th Street and East Cottage Grove Avenue for approximately one week.

May 29, 2026 to June 5, 2026
Beginning Friday, May 28, City of Bloomington Utilities (CBU) will close North Washington Street between East 10th Street and East Cottage Grove Avenue to complete sanitary sewer work in the area. The closure is expected to last one working day, though the duration may be shorter depending on field conditions.
Utilities
LINESTRING(-86.5323420119938 39.171692818151826,-86.53234656137657 39.17251459019579)

CBU Sanitary Sewer Maintenance

North Washington Street will be closed to through traffic between East 10th Street and East Cottage Grove Avenue

May 29, 2026 to June 12, 2026
Beginning early Tuesday, May 26, City of Bloomington Utilities (CBU) will close East 10th Street at North Washington Street to complete sanitary sewer work in the area. The closure is expected to last one working day, though the duration may be shorter depending on field conditions. Following the work on East 10th Street, North Washington Street will be closed to through traffic between East 10th Street and East Cottage Grove Avenue for approximately one week. After that, the closure will shift to North Washington Street between East Cottage Grove Avenue and just south of East 11th Street for an additional week.
Utilities
LINESTRING(-86.53234531533188 39.17170717659417,-86.53233768739898 39.17251536456459)

Axis Fiber Relocation Project

S High Street from E 3rd St to Rock Creek Dr

June 1, 2026 to June 19, 2026
Three weeks of lane and sidewalk closures along S High Street from E 3rd St to Rock Creek Dr to relocate approximately 4200 ln ft of fiber conduit and hand holes. This project will take us 10-15 days to complete.
External Project
LINESTRING(-86.50852322030218 39.16410991686445,-86.5083404197909 39.146856511235995)

Lane Restrictions and No Parking on N Walnut St from E 14th St to E 15th St for milling and resurfacing.

N Walnut St from E 14th St to E 15th St

June 1, 2026 to June 4, 2026
Lane Restrictions and No Parking on N Walnut St from E 14th St to E 15th St for milling and resurfacing.
Street
LINESTRING(-86.53348229664714 39.1768433953348,-86.53350490408937 39.17594960005829)

Lane Restrictions and No Parking on N College Ave from W 15th St to W 17th St for milling and resurfacing.

N College Ave from W 15th St to W 17th St

June 1, 2026 to June 4, 2026
Lane Restrictions and No Parking on N College Ave from W 15th St to W 17th St for milling and resurfacing.
Street
LINESTRING(-86.53474920639277 39.17686409688699,-86.53469684148202 39.17899521072977)

Milling and Resurfacing on W 15th St

W 15th St between N College Ave and N Walnut St

June 1, 2026 to June 4, 2026
Lane Restrictions and No Parking on W 15th St from N College Ave to N Walnut St for milling and resurfacing.
Street
LINESTRING(-86.53469164137181 39.17686089397904,-86.53355691392669 39.17686089397904)

Milling and Resurfacing on W Yellowwood Ct

W Yellowwood Ct from N Rosewood Dr to the Dead End

June 1, 2026 to June 4, 2026
Lane Restrictions and No Parking on W Yellowwood Ct from N Rosewood Dr to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.54888186112201 39.20641079553957,-86.54820347423014 39.206418251769065,-86.54809762662998 39.206403339309304,-86.54798215652072 39.2063660581461)

West 2nd Street Modernization and Safety Improvements

2nd Street between Walker Street and Morton Street

June 1, 2026 to April 1, 2027
Intermittent lane restrictions and traffic switches will be implemented.
Engineering
LINESTRING(-86.54614342649008 39.161438835305034,-86.53498313659308 39.16139200980018)

Milling and Resurfacing on E Clover Ln

E Clover Ln from E Blue Ridge Dr to N Dunn St

June 1, 2026 06:00 am to 16:00 pm June 4, 2026
Lane Restrictions and No Parking on E Clover Ln from E Blue Ridge Dr to N Dunn St for milling and resurfacing.
Street
LINESTRING(-86.53184044531636 39.19585921376762,-86.53177266665799 39.19567244803119,-86.53172748088572 39.195462335984274,-86.53163710934119 39.195269732722664,-86.53145636625216 39.195223040943375,-86.53076351774415 39.19522887741749,-86.53011585500842 39.19533393386857,-86.52964140439967 39.195491518250606,-86.5290916441705 39.19575415810198,-86.52870003414424 39.195917577958454,-86.52857953875154 39.19594092362121)

ROW2026-04-2430

S High Street Closed with detours at E Southdowns Drive and E Maxwell Lane, with Local access maintained.

June 1, 2026 to June 5, 2026
One day closure of Street with sidewalk diversion, between listed dates
Engineering
LINESTRING(-86.5084877381341 39.15551103204484,-86.50840861050968 39.15551103204484,-86.5084065190564 39.15775447545738,-86.50847772945615 39.15775447545738,-86.508485236977 39.1555137811676)

ROW2026-02-2266

N Dunn Street between 6th Street and Kirkwood Avenue

June 1, 2026 to June 10, 2026
Single lane closure
Engineering
LINESTRING(-86.52826708032241 39.16750664697193,-86.52825903369536 39.16719887672377,-86.52822282387366 39.167199916490404,-86.52823087050069 39.16750872649607,-86.5282643981134 39.16750872649607)

ROW2026-04-2420

North Woodlawn Avenue, Between East 13th Street and E 12th Street

June 1, 2026 to July 17, 2026
Full road closure for work associated with ROW2026-04-2420
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52363343342134 39.175180011100736,-86.52357676134712 39.17517835324318,-86.52356235488244 39.17517793180343,-86.52353467405678 39.174556420441746,-86.52351149891358 39.17432510842613,-86.52358971502188 39.17432510842613,-86.52361031242812 39.17454024856099,-86.52361299463715 39.17470763331403,-86.52363445230927 39.17517891077475,-86.52360763021912 39.17517891077475),LINESTRING(-86.52360763021912 39.17517891077475,-86.52357678481546 39.175177871126124))

2026 Kirkwood Brick Paver Repair Project

Kirkwood b/t Dunn and Grant

June 1, 2026 to June 14, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.52834535896844 39.166555154617555,-86.52974075249998 39.16655902914971)

ROW2026-04-2450

910 South Adams Street

June 2, 2026 to June 16, 2026
Lane restriction, 3 days between listed dates
Engineering
LINESTRING(-86.55057558408082 39.15582271305843,-86.55054876199065 39.15582271305843,-86.55054742088616 39.15563760442339,-86.55057692518531 39.15563864436089,-86.55057692518531 39.155821673123626)

frhijfc

cdeec

June 2, 2026 daily for 10 times
dceed
Engineering
LINESTRING(-86.53865135980226 39.16425298473837,-86.52920998406984 39.16425298473837)

ROW2026-06-2540

3230 S Walnut

June 4, 2026 to August 13, 2026
Lane closure for electric work
Engineering
LINESTRING(-86.53139824302374 39.12760036170292,-86.53141246531645 39.12667727495517)

ROW2026-05-2518

1210 West Arlington Road

June 4, 2026 to June 6, 2026
SIngle lane closure
Engineering
GEOMETRYCOLLECTION(POINT(-86.54780482528298 39.1795133131001),POINT(-86.54776588285739 39.179487063515495),POINT(-86.54773371302757 39.179472626239715),POINT(-86.54770323634666 39.17945293904077),POINT(-86.54804525243226 39.179653748211365),POINT(-86.54807064966634 39.17967081040206),POINT(-86.54808758115574 39.17967999773384),POINT(-86.54810281949618 39.17968787258863),LINESTRING(-86.5481248304324 39.17968918506435,-86.548107898943 39.17970230982013,-86.54808106632179 39.179686747379236,-86.54806452630672 39.17967715446426,-86.54803768587624 39.17966158748854,-86.54797993639023 39.17962809379472,-86.54789181668771 39.17957698587472,-86.5477966452224 39.17952178801116,-86.54772587769811 39.17948074399854,-86.54763720353806 39.17942931439475,-86.54765074872958 39.17941487710718,-86.54768041885971 39.17943028673005,-86.54770967998844 39.179445483928674,-86.54777327386327 39.179478512333816,-86.54782006362345 39.17950281326739,-86.54785204509754 39.17952135269377,-86.54796458929293 39.17958659370089,-86.54801477575138 39.17961568638654,-86.54802843827275 39.17962508142125,-86.54811975098558 39.17968787258863),POINT(-86.54801816204926 39.17963406106318),POINT(-86.5479893785173 39.17961831134065),POINT(-86.54795551553853 39.179595999227615),POINT(-86.54790133477248 39.17956712471795),POINT(-86.54784207455963 39.17953168780352),POINT(-86.54767445281472 39.17943718927762))

2026 Bloomington Handmade Market

Kirkwood and 6th b/t College and Walnut

June 5, 2026 12:00 pm to 20:00 pm June 6, 2026
2027 Bloomington Handmade Market
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53480752349174 39.16757853875197,-86.53367671021839 39.1675658835203),LINESTRING(-86.53481692469535 39.16659381341955,-86.53368225451796 39.166582866758034))

Single lane closure

3182 South Walnut Street

June 5, 2026 to June 6, 2026
Single lane closure
Engineering
LINESTRING(-86.53140239437947 39.12862624643762,-86.53139828226597 39.12795477038293)

UTILITIES ROAD CLOSING

100 BLOCK OF NORTH WASHINGTON ST BETWEEN E 6TH & E KIRKWOOD - 11:30 AM THROUGH 5:30 PM

June 5, 2026
CITY UTILITIES WILL BE REPAIRING A WATER MAIN ON NORTH WASHINGTON ST BETWEEN E 6TH & E KIRKWOOD.
Utilities
LINESTRING(-86.53234398809732 39.16665559303843,-86.53234398809732 39.16666885846877,-86.53232687830342 39.1675355278297)

2026 Fourth & Rogers Block Party

4th St east and west of Rogers to the alleys

June 5, 2026 15:00 pm to 23:00 pm
2026 Fourth & Rogers Block Party
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.5393099373815 39.165633315318104,-86.53873849879282 39.16562931134723),LINESTRING(-86.5386467910769 39.165627482277955,-86.53809288717798 39.16562277127153))

ROW2026-05-2512

430 East 10th Street

June 8, 2026 to June 12, 2026
Lane closure for street cuts
Engineering
LINESTRING(-86.52831484096045 39.171602097001426,-86.52830877454355 39.17121997428032)

ROW2026-06-2536

1215 N Woodburn Avenue

June 8, 2026 to June 12, 2026
Lane closure of N Woodburn for street cuts.
Engineering
LINESTRING(-86.53596580242116 39.17833628657891,-86.53597087540588 39.1780557681445)

Milling and Resurfacing on S Southern Ridge Ct

S Southern Ridge Ct from S Southern Pines Ct to the Dead End

June 8, 2026 to June 12, 2026
Lane Restrictions and No Parking on S Southern Ridge Ct from S Southern Pines Ct to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.54754944176256 39.139342895888575,-86.54724849952058 39.13951949236352)

Milling and Resurfacing on S Southern Pines Ct

S Southern Pines Ct from W Pinehurst Dr to the Dead End

June 8, 2026 to June 12, 2026
Lane Restrictions and No Parking on S Southern Pines Ct from W Pinehurst Dr to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.54744238480099 39.13853134722521,-86.54736604810098 39.13877410137701,-86.54736223126598 39.13896948825712,-86.54740803328599 39.13910566667107,-86.547495820491 39.13924776560475,-86.54757215719101 39.13933953768037,-86.547686662241 39.13941650771605,-86.54785460298103 39.1394934776676)

Milling and Resurfacing on Pinehurst Dr

Pinehurst Dr from W Tapp Rd to S Rockport Rd

June 8, 2026 to June 17, 2026
Lane Restrictions and No Parking on Pinehurst Dr from W Tapp Rd to S Rockport Rd for milling and resurfacing.
Street
LINESTRING(-86.54997062441129 39.13643279955676,-86.54997606634309 39.13738674099403,-86.54997062441129 39.13769909069126,-86.54991076316131 39.13793968343222,-86.54976383100232 39.138154949924626,-86.54952982793428 39.13836599486643,-86.54918698622994 39.13852216771616,-86.54893665736647 39.13858126005542,-86.5486155833894 39.13858970181411,-86.54788092259442 39.13854749301049,-86.54741291645833 39.13850950506557,-86.54708640054943 39.138437750002566,-86.54682518782235 39.1382984605539)

Milling and Resurfacing on Pine Meadows Dr

Pine Meadows Dr from S Pinehurst Dr to S Twin Oaks Vly

June 8, 2026 to June 12, 2026
Lane Restrictions and No Parking on Pine Meadows Dr from S Pinehurst Dr to S Twin Oaks Vly for milling and resurfacing.
Street
LINESTRING(-86.54995432265784 39.136924783918715,-86.54936798479036 39.13693172723114,-86.54906362620265 39.13699421701227,-86.54891592277038 39.1370844799315,-86.54875926761494 39.13721987409343,-86.5486652745217 39.13739692760461,-86.54863841935219 39.13749413326457,-86.54864737107536 39.13804264840192,-86.54863841935219 39.13856338666676,-86.54864289521379 39.13876126619755,-86.54872793658386 39.13904593402066,-86.54893830207831 39.13927158452606,-86.54909048137215 39.13937920220468,-86.54934112962084 39.13949029124876,-86.54965443993173 39.13954930723219,-86.55033924675406 39.13955625028575)

CBU - Concrete work

Section of South Euclid Avenue just north of West Second Street

June 8, 2026
Beginning Monday, June 8, City of Bloomington Utilities (CBU) will close a portion of South Euclid Avenue just north of West Second Street to through traffic between 8:00 a.m. and 3:00 p.m. so crews can complete concrete work associated with previous water main relocation work in the area. The closure is expected to last one day, weather and field conditions permitting.
Utilities
LINESTRING(-86.543334527948 39.161468003176395,-86.54334410143926 39.161956063192406)

ROW2026-03-2376

1025 S Walnut- Closure on East Davis Street

June 8, 2026 to June 9, 2026
Full closure of Davis Street.
Engineering
LINESTRING(-86.53358371756566 39.154245374445054,-86.53358371756566 39.154208975902264,-86.5331921150495 39.15420689598497,-86.5331921150495 39.15424849431929,-86.53358371756566 39.154245374445054)

Lane Closure on W. 1st Near B-Line Trail

W 1st between S. Morton and College Ave.

June 9, 2026
Fiber Utility Spotting for a boring project with HSI Underground
Engineering
LINESTRING(-86.53610470849614 39.15939485129212,-86.53618122838618 39.15939485129212,-86.53601395234747 39.15939485129212)

Pavement Markings on Madison St from W 3rd St to W 7th St

Madison St from W 3rd St to W 7th St

June 10, 2026 to June 11, 2026
No Parking and Lane Restrictions for pavement markings on Madison St from W 3rd St to W 7th St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53743852127833 39.164689313305104,-86.53744929434647 39.16566657527511,-86.5374277482102 39.16671899605822,-86.53739542900577 39.16857322293299)

Pavement Markings on W 6th St from N Rogers St to N Morton St

W 6th St from N Rogers St to N Morton St

June 10, 2026 to June 11, 2026
No Parking and Lane Restrictions for pavement markings on W 6th St from N Rogers St to N Morton St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53864830928475 39.16759657241985,-86.53615197126108 39.16759124069685,-86.53487973287434 39.16758057724965)

CBU - Concrete work associated with water main relocation

West Second Street between South Walker Street and South Euclid Avenue.

June 10, 2026 to June 11, 2026
Beginning Wednesday, June 10, City of Bloomington Utilities (CBU) will implement an eastbound lane restriction on West Second Street between South Walker Street and South Euclid Avenue. The restriction will begin at 5:00 a.m. and is necessary for utility work in the area. On Thursday, June 11, the work zone will shift to the westbound lane of West Second Street between South Walker Street and South Euclid Avenue. The lane restriction is expected to remain in place throughout the day, weather and field conditions permitting.
Utilities
LINESTRING(-86.54333510736967 39.16142908375841,-86.54609667391813 39.16143784494966)

Single Lane Closure for Utility Spotting

West bound lane of W 1st St between S College Ave and S Morton St.

June 10, 2026
Fiber utility spotting with road cuts / core holes.
Engineering
LINESTRING(-86.53615017015447 39.15941228620076,-86.53584896323528 39.15941228620076)

Pavement Markings on W 7th St from N Rogers St to the B-Line

W 7th St from N Rogers St to the B-Line

June 10, 2026 to June 11, 2026
No Parking and Lane Restrictions for pavement markings on W 7th St from N Rogers St to the B-Line. This will be completed by E&B Paving.
Street
LINESTRING(-86.53865879551171 39.16861413800925,-86.5348751684459 39.1685936723519)

Milling and Resurfacing on S Rockport Rd from W Tapp Rd to W Graham Dr

S Rockport Rd from W Tapp Rd to W Graham Dr

June 11, 2026 06:00 am to 16:00 pm June 25, 2026
Lane Restrictions and No Parking on S Rockport Rd from W Tapp Rd to W Graham Dr for milling and resurfacing.
Street
LINESTRING(-86.54863066898712 39.13643992214705,-86.5463776134146 39.13867012107181,-86.54514379726776 39.13997658538935)

Milling and Resurfacing on S Zona Ct

S Zona Ct from W Countryside Ln to the Dead End

June 11, 2026 06:00 am to 16:00 pm June 25, 2026
Lane Restrictions and No Parking on S Zona Ct from W Countryside Ln to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.54632463492159 39.14313550103364,-86.54623122026172 39.14278203324969,-86.54612365186551 39.14253394610529,-86.54593116105121 39.14213876123782)

Single Lane Closure on W 1st

Between Morton and College Ave

June 11, 2026
Half day lane closure for utility spotting
Engineering
LINESTRING(-86.53622440210445 39.15940658672645,-86.53594005631224 39.15941209871309)

Pavement Markings on E 9th St from N Morton St to N Walnut St

E 9th St from N Morton St to N Walnut St

June 11, 2026 to June 12, 2026
No Parking and Lane Restrictions for pavement markings on E 9th St from N Morton St to N Walnut St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53607297090531 39.170470728047604,-86.53481211755722 39.17047406423157,-86.53362441952287 39.17046405567916)

Pavement Markings on E 10th St from N Morton St to N Walnut St

E 10th St from N Morton St to N Walnut St

June 11, 2026 to June 12, 2026
No Parking and Lane Restrictions for pavement markings on E 10th St from N Morton St to N Walnut St. This will be completed by E&B Paving.
Street
LINESTRING(-86.53607745663356 39.171677974206744,-86.53481757135215 39.17169026017609,-86.53360522891155 39.17167183122123)

Milling and Resurfacing on S Terra Ct

S Terra Ct from S Zona Ct to the Dead End

June 11, 2026 06:00 am to 16:00 pm June 17, 2026
Lane Restrictions and No Parking on S Terra Ct from S Zona Ct to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.54605428868012 39.14245372785905,-86.54583777299021 39.14250228446835,-86.5456890814923 39.14250228446835)

CBU Sanitary Sewer Maintenance

North Washington Street between East Cottage Grove Avenue and just south of East 11th Street

June 12, 2026 to June 19, 2026
Beginning Friday June 12, City of Bloomington Utilities (CBU) will close North Washington Street between East Cottage Grove Avenue and just south of East 11th Street to complete sanitary sewer work in the area.
Utilities
LINESTRING(-86.53233892640857 39.17255262896197,-86.53231514570115 39.1740029068643)

Rogers St between 2nd and 3rd, full road closure from June 15th through June 26th.

Rogers St between 2nd and 3rd, full road closure from June 15th through June 26th.

June 14, 2026 to June 27, 2026
Rogers St between 2nd and 3rd, full road closure from June 15th through June 26th. This will be for the installation of new curb ramps, bump-outs, and crosswalks.
Engineering
LINESTRING(-86.53869286625962 39.1614839237445,-86.53867363029752 39.16454450173788)

N Headley Road - Guardrail Repair

N Headley Road from top of hill to S Shore Trial

June 15, 2026
Contractor (Specialties Company) will have lane restrictions for guardrail repair.
Street
LINESTRING(-86.51254861751504 39.19495385568874,-86.51254861751504 39.19495385568874,-86.5127737411883 39.19554154461787,-86.51288037871774 39.19600985571407,-86.51305810793347 39.19634042637327,-86.51317659407731 39.19662508319459)

ROW2026-06-2535

200 E 17th

June 15, 2026 to June 16, 2026
Lane closure for street cut
Engineering
LINESTRING(-86.53222136370036 39.17893696988156,-86.53222136370036 39.1787103382255)

N Old State Road 37 - Guardrail Repair

N Old State Road 37

June 15, 2026
Contractor (Specialties Company) will have lane restrictions for guardrail repair.
Street
LINESTRING(-86.535231163236 39.194255207193436,-86.5351753749922 39.19405055494673)

2026 Kirkwood Brick Paver Repair Project

Kirkwood b/t Grant and Lincoln

June 15, 2026 to June 21, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.5298669209111 39.166562142816105,-86.53101115324554 39.166563165507625)

Alley Closure for Chimney Demo

108 S Indiana

June 15, 2026 to June 19, 2026
Alley Closure at the east end of the the alley between 108 and 114 S Indiana Ave to for chimney demolition. Closure to be implemented with type 3 barricades and road closed signs at both sides of the closure. Applicant is responsible for notification and coordination of services with the affected adjacent properties.
External Project
LINESTRING(-86.52702829177802 39.16605219544067,-86.52723493477035 39.166051148289)

Pavement Markings on S Henderson St from E Hillside Dr to E 3rd St

S Henderson St from E Hillside Dr to E 3rd St

June 15, 2026 to June 16, 2026
No Parking and Lane Restrictions for pavement markings on S Henderson St from E Hillside Dr to E 3rd St. This will be completed by E&B Paving.
Street
LINESTRING(-86.5269225518846 39.15058355037638,-86.52698245950566 39.15333611644775,-86.52702739022146 39.15563564606046,-86.52711725165307 39.15822543034085,-86.52714720546359 39.159328672716384,-86.52720711308466 39.16134930336372,-86.52725204380046 39.163137629200605,-86.52726702070572 39.163485999072805,-86.52704236712671 39.16368340790126,-86.52690757497932 39.16399693843124,-86.52692255188458 39.16422918236728)

ROW2026-03-2347

2540 E Clay CT

June 15, 2026 to June 17, 2026
SIngle lane closure
Engineering
LINESTRING(-86.50534616879024 39.12567714213276,-86.50611763667699 39.12517994428748)

W 3rd Street handrail repair

W 3rd Street from S Madison Street to S College Ave

June 16, 2026
Contractor (Specialties Company) will have lane restrictions for handrail installation.
Street
LINESTRING(-86.53740736258834 39.164662805177244,-86.53489368095548 39.16466009831166)

ROW2026-05-2511

407 North Roosevelt Street

June 16, 2026 to June 19, 2026
Lane closure for street cuts
Engineering
LINESTRING(-86.50610895222376 39.169898343900655,-86.50610351415712 39.16959373688758)

Moving Lane Closures Along Indiana Ave

East side of Indiana Avenue between E 13th St and E 3rd St.

June 18, 2026 to June 27, 2026
Fiber boring project working along the east side of Indiana Ave. Multiple lane closures will occur as the work advances over the course of a week or so.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52695261383738 39.17517641062099,-86.52694350801626 39.17448462534668),LINESTRING(-86.52694350801626 39.174188143859936,-86.52693440219511 39.17358105881988),LINESTRING(-86.52695261383738 39.17331281027208,-86.52693440219511 39.17268453993145),LINESTRING(-86.52693440219511 39.1724304065138,-86.52692529637396 39.17175977225202),LINESTRING(-86.52694110527642 39.17152523099148,-86.52692963266067 39.17058243493011),LINESTRING(-86.52689521481348 39.170315603561335,-86.52688374219774 39.16957736483238),LINESTRING(-86.5269066874292 39.16932831869383,-86.52689521481348 39.16866122647767),LINESTRING(-86.52690659685281 39.168346826529046,-86.52686323308262 39.16448046042518))

2026 Kirkwood Brick Paver Repair Project

Kirkwood b/t Lincoln and Washington

June 22, 2026 to July 1, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.53116852983791 39.166563238379524,-86.53228402846483 39.16657370606072)

Milling and Resurfacing on E Sunny Slopes Dr

E Sunny Slopes Dr from S Brookside Dr to S Walnut Street Pike

June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on E Sunny Slopes Dr from E Ridgeview Dr to S Walnut Street Pike for milling and resurfacing.
Street
LINESTRING(-86.53063890578146 39.13367223884842,-86.5300243068952 39.1336770542965,-86.52978840025197 39.133600007087324,-86.52956490974788 39.133474805192634,-86.52947799677406 39.13337849589141,-86.52931658696555 39.133108829147204,-86.52916138522659 39.132940286907655,-86.52893168665292 39.13282471485314,-86.52865853159237 39.13279100630152,-86.52836054425356 39.13279100630152,-86.52818051023638 39.132786190792814,-86.52798806008008 39.13274766671137,-86.52765282432391 39.132651356415664,-86.52739208540247 39.132564677036925,-86.52703822543765 39.13253096836081,-86.5268519833509 39.13253096836081)

CBU - Sanitary Sewer Main Replacement

North Washington Street between East Cottage Grove Avenue and just south of East 11th Street for an additional week.

June 22, 2026 to July 3, 2026
This project began on 5/26 and projects delays have extended the original timeline. Local access to residences and businesses will be maintained throughout the project whenever possible. Motorists are advised to use alternate routes and to use caution near the work zone while CBU crews and equipment are on site. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.53232442635785 39.17256124668796,-86.532311874042 39.17439067837003)

gfsd

fds

June 22, 2026
fd
Engineering
POINT(-86.5321067698059 39.16932707536898)

Lane Closures for Water Utility Connection

430 E 10th St

June 22, 2026 to June 23, 2026
Working with CBU to connect new water service and sewer lines for 430 E 10th St.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5284903385787 39.17166073985376,-86.5283459960503 39.17166225205045),LINESTRING(-86.52826797306197 39.17160932514702,-86.52826602248727 39.171492885819276))

Milling and Resurfacing on E Ridgeview Dr

E Ridgeview Dr from E Sunny Slopes Dr to S Walnut St

June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on E Ridgeview Dr from E Sunny Slopes Dr to S Walnut St for milling and resurfacing.
Street
LINESTRING(-86.52796476408695 39.13271231234182,-86.5279816575028 39.13226240726084,-86.52802670661178 39.1321313664055,-86.52812243596834 39.13202653354563,-86.52826884557248 39.13194790879831,-86.528454673147 39.131899860298404,-86.52964284339603 39.131886756156376,-86.53029605547609 39.131873652011905,-86.53045372735745 39.131869283963226,-86.53074091542715 39.13191296443799,-86.53094926755612 39.13195664488569,-86.53113509513061 39.1319697490147,-86.53138286522994 39.131987221182925)

Milling and Resurfacing on S Brookside Dr

S Brookside Dr from E Ridgeview Dr to E Sunny Slopes Dr

June 22, 2026 06:00 am to 16:00 pm July 2, 2026
Lane Restrictions and No Parking on S Brookside Dr from E Sunny Slopes Dr to E Ridgeview Dr for milling and resurfacing.
Street
LINESTRING(-86.53071400558765 39.13194682305814,-86.53065657794518 39.13365626711817)

Lane Closures / Road Cuts

430 E 10th St & 521 N Dunn

June 22, 2026 to June 23, 2026
Updating sewer and water service and connecting to city infrastructure. Coordinated with CBU
Engineering
GEOMETRYCOLLECTION(GEOMETRYCOLLECTION(LINESTRING(-86.52846277672354 39.17166304454756,-86.52834590060516 39.17166107478607),LINESTRING(-86.52827221783485 39.171623649307634,-86.52826713626449 39.17145030998984)),LINESTRING(-86.52826442687662 39.17143030394993,-86.52825935781921 39.17110019702437))

Speed Hump Installation on W Pinehurst Dr

W Pinehurst Dr between W Pine Meadows Dr and S Southern Pines Ct

June 23, 2026 06:00 am to 16:00 pm June 24, 2026
Intermittent lane changes for speed hump installation
Street
LINESTRING(-86.54859451745618 39.13857946683348,-86.5474628749398 39.13850802395493)

Speed Hump Installation on S Pine Meadows Dr

S Pine Meadows Dr from S Pinehurst Dr to W Pinehurst Dr

June 23, 2026 06:00 am to 16:00 pm June 24, 2026
Intermittent lane changes for speed hump installation
Street
LINESTRING(-86.54995373563573 39.136926792648666,-86.54923419578516 39.13692992806281,-86.54885825642504 39.13711805265618,-86.54867635028303 39.137353207691035,-86.5486278419785 39.13756954962946,-86.54864401141334 39.138557189164686)

Speed Hump Installation on S Pinehurst Dr

S Pinehurst Dr between S Pine Meadows Dr and W Pine Meadows Dr

June 23, 2026 06:00 am to 16:00 pm June 24, 2026
Intermittent lane changes for speed hump installation
Street
LINESTRING(-86.54996730506858 39.13692200390281,-86.54997837354102 39.137691801308705,-86.54991565219714 39.1379264590671,-86.54978652001853 39.13813536104769,-86.54961311395007 39.13830133752188,-86.54943970788163 39.138415803827854,-86.54915561708869 39.138527408296966,-86.5489305581488 39.13857605634354,-86.54865015684665 39.13858177964093)

Half Day Lane Closure Southbound Kinser Pike

Southbound lane of Kinser Pike, just north of the Napa entrance off Kinser.

June 24, 2026 to June 26, 2026
Utility spotting for a fiber boring project, lasting approximately 2-3 hours.
Engineering
LINESTRING(-86.53776079969234 39.179568019100316,-86.53776079969234 39.179435789209634)

W Allen St Closed for Tree Removal

W Allen St between S Adams St and S Larkspur Ln

June 24, 2026 07:00 am to 15:00 pm
W Allen St between S Adams St and S Larkspur Ln will be closed for tree removal. Signs will be in place.
Street
LINESTRING(-86.55054560778291 39.15585649582246,-86.54798072748586 39.15576665501996)

Kirkwood, Patterson Rogers Grimes Road Maintenance Project

West Patterson Drive, from Rogers to To South Walnut Street. This closure will maintain access to the north Switchyard Park Entrance and Parking and Transit via a LOCAL ACCESS ONLY closure at S Walnut St and Grimes Lane. ALL other vehicles Shall be detoured. The Detour route is Rogers, 1st St, Dodds, and Walnut. Morton Street will be Closed to thru traffic, and Local access only.

June 29, 2026 to July 6, 2026
This closure will maintain access to the north Switchyard Park Entrance and Parking and Transit via a LOCAL ACCESS ONLY closure at S Walnut St and Grimes Lane. ALL other vehicles Shall be detoured. The Detour route is Rogers, 1st St, Dodds, and Walnut. Morton Street will be Closed to thru traffic, and Local access only.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53863251104782 39.15381689322689,-86.53813471743484 39.15380736196971,-86.53791347582907 39.153759705664356,-86.53703465500617 39.153421344968336,-86.53685028700136 39.15338321971754,-86.53589157337636 39.153364157084354),LINESTRING(-86.53589157337636 39.153364157084354,-86.53589771897653 39.15336892274311))

ROW2026-06-2572

1935 S. Locust Court

June 29, 2026 to July 1, 2026
Lane closure for street cut
Engineering
LINESTRING(-86.50896749067537 39.14506477789078,-86.50896593898453 39.144826501509925)

CBU - Service Line Maintenance

Near 1309 North Kinser Pike

June 29, 2026
CBU Crews will be closing the Southbound Lane of North Kinser Pike, just north of West 17th Street to address a service line issue.
Utilities
LINESTRING(-86.53777963356184 39.17948636244199,-86.53777570988349 39.17998818092016)

Roll gate repairs for HUB 2 Project

205 E 17th St

June 30, 2026 to July 2, 2026
ROW2026-06-2546 2-3 days of sidewalk closure on the north side of E 17th St for roll gate repairs. no overnight closures.
External Project
LINESTRING(-86.53219301349496 39.179021549422686,-86.53106777529756 39.179021549422686)

Bloomington Convention Center Skywalk Work

302 S College Ave

June 30, 2026 to July 24, 2026
Weddle Brothers is requesting approval of a temporary right-of-way closure at South College Avenue to accommodate completing the enclosure at the connector portion of the Bloomington Convention Center Expansion Project that will span from the new expansion on the east side of South College Avenue to the west side of College Avenue. The request includes temporary closures of: the western sidewalk, the existing eastern pedestrian diversion, and College Avenue south of 3rd Street, as necessary to safely complete the work. The closure(s) are proposed from June 30, 2026 through July 24, 2026. Pedestrian and vehicular traffic will be maintained, shifted, or rerouted in accordance with the approved maintenance of traffic plan. In addition to the right-of-way closure requests Weddle Brothers has also submitted a noise permit application that would only be used to meet the deadline of reopening the right-of-way on July 24, 2026.
External Project
LINESTRING(-86.5349109547624 39.164474784477534,-86.53491999233634 39.16405201798375)

ROW2026-04-2445

3108 E Kensington

July 1, 2026 to July 31, 2026
Lane closures for DUKE
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52377876868866 39.12147233493138,-86.51759706206178 39.121453659579146),LINESTRING(-86.51142514858715 39.12147230267135,-86.50918756618826 39.1214641908073),LINESTRING(-86.4966328198572 39.14318153318331,-86.49661612728588 39.14296662473882,-86.4965894191718 39.14249019885966,-86.49657940362901 39.14218207388387),LINESTRING(-86.4965856533735 39.14085691567303,-86.49655754002136 39.13854313720762),LINESTRING(-86.49560844654047 39.13591188944821,-86.49547215998619 39.13593760288052,-86.49525115476307 39.13594045992798,-86.49489386298568 39.13594045992798,-86.49368938451963 39.135914746496695))

ROW2026-06-2574

711 E Cottage Grove Avenue

July 1, 2026 to July 3, 2026
Short term closures of Cottage Grove with access maintained
Engineering
LINESTRING(-86.52522243389923 39.17256359217973,-86.52522243389923 39.172514783543875,-86.52469725168474 39.17251158045039,-86.52469859278925 39.17255108858646,-86.52522162354715 39.172555247336305)

ROW2026-06-2561 ROW2026-06-2562 ROW2026-06-2563

714 West 4th Street

July 1, 2026 to July 15, 2026
Lane closures for gas work.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54165276176894 39.16564274090413,-86.54100653453756 39.16564080640583,-86.54095806963407 39.16564066132483),LINESTRING(-86.54095404632055 39.16564378069373,-86.54165678508245 39.16564274090413))

ROW2026-03-2393

1009 W Allen Street

July 1, 2026 to September 11, 2026
Lane restrictions for 2 days between listed dates
Engineering
LINESTRING(-86.54432382616537 39.15558113016192,-86.54404882695962 39.154052551758724,-86.54403876867582 39.15391995661321,-86.54404547419836 39.15381206037901,-86.54410414752057 39.153678164822196,-86.54414773341706 39.153611866927946)

West 2nd Street Modernization and Safety Improvements

S Morton Street between W University St and W 2nd Street

July 1, 2026 to November 11, 2026
West 2nd Street Modernization and Safety Improvements
Engineering
LINESTRING(-86.53628658086588 39.161296260559084,-86.53629629814417 39.16042602062828)

ROW2026-04-2431

3274 E Moores Pike

July 1, 2026 to July 31, 2026
Lane closures for Duke
Engineering
LINESTRING(-86.49811144528441 39.150457070952484,-86.49709813604936 39.1504711033063,-86.49540627152295 39.150407957691925,-86.49356060113054 39.150351828209324,-86.49099113842736 39.15028868248788,-86.48686552225608 39.150183439492906,-86.48454337226009 39.15020881077777)

CBU - Sanitary Sewer Maintenance

East Cottage Grove Avenue between North Walnut Street and North Washington Street

July 2, 2026 to July 17, 2026
CBU crews will be installing a sewer main along East Cottage Grove Avenue, beginning at North Washing Street. East Cottage Grove will be closed to thru traffic for the duration of work.
Utilities
LINESTRING(-86.53234700778071 39.1725398169591,-86.53354407035673 39.17254764834726)

2026 Kirkwood Brick Paver Repair Project

Kirkwood b/t Washington and Walnut

July 2, 2026 to July 11, 2026
2026 Kirkwood Brick Paver Repair Project
Public Works
LINESTRING(-86.53350765891176 39.16658814056919,-86.53237594463717 39.16658289133295)