Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Poplars Redevelopment Project 400 E 7th St February 17, 2025 to November 21, 2025
Sidewalk closure and protected bike lane diversion to accommodate crane use for the Poplar Building Redevelopment.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52971398338842 39.16844890303665,-86.5283524160322 39.168441760864965),LINESTRING(-86.52975083230503 39.16849461292935,-86.52882039716067 39.16849461292935,-86.52869695334626 39.16847747171627,-86.52855324251527 39.16847604324985,-86.52842427130713 39.16849604134089,-86.52830266976989 39.168497469752396))
Kirkwood 2025 Pedestrian Season / Dining Closure E kirkwood Ave April 2, 2025 to November 14, 2025
Planned street closure of 1/2 of the 100 block, 300, 400, and 500 blocks of E Kirkwood from Walnut to Indiana.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53356764722223 39.16659167582003,-86.53296935044038 39.166583421954726),LINESTRING(-86.53104972965902 39.166569102177334,-86.52983561781902 39.166553457020115),LINESTRING(-86.52975826443308 39.16655345702014,-86.52829527648181 39.16654302691339),LINESTRING(-86.52820783352382 39.16654041938648,-86.52696345296756 39.16654302691339))
Duke Energy Lane Closure 1606 S Rogers St May 1, 2025 to October 31, 2025
Lane restrictions for pole work
External Project
LINESTRING(-86.50848539581101 39.15037491562114,-86.50826085249109 39.13670205807966)
Bloomington Convention Center Site Preparation 302 S Walnut st June 27, 2025 to January 26, 2026
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
External Project
LINESTRING(-86.53447106427768 39.16454766952046,-86.53368078602708 39.16453847855911)
ROW2025-04-1544 Multiple locations within the city July 1, 2025 to April 28, 2026
Single lane closures for Circuit Sectionalization
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.51842205100711 39.15057026605763,-86.51842205100711 39.150533699318856,-86.51846546414154 39.15053412015058,-86.51873640483952 39.15053674655479),LINESTRING(-86.51873247508206 39.150539793790585,-86.51873247508206 39.150539793790585,-86.51844955671923 39.15055198264878),LINESTRING(-86.51873640483952 39.15055198264878,-86.51873640483952 39.15055198264878,-86.51853594467022 39.15054747670379,-86.51846527445402 39.1505458881781),LINESTRING(-86.5184534864767 39.1505611243538,-86.5184534864767 39.1505611243538,-86.51853600404473 39.1505458881781),LINESTRING(-86.51846527445402 39.1505611243538,-86.51846527445402 39.1505611243538,-86.51873247508206 39.1505611243538),LINESTRING(-86.51874426349107 39.150573313292,-86.51846527445402 39.150573313292,-86.51842598033288 39.150573313292),LINESTRING(-86.51843776874192 39.15053674655479,-86.51844955671923 39.1505458881781),LINESTRING(-86.51844169806768 39.15055198264878,-86.51844169806768 39.15055198264878),LINESTRING(-86.51844169806768 39.150558077118944,-86.51842205100711 39.150582454910534),LINESTRING(-86.51843383941613 39.150573313292,-86.51843383941613 39.15057636044253),LINESTRING(-86.52263997864972 39.15435692762702,-86.522637952256 39.154133788372945),LINESTRING(-86.51882353901254 39.14685451747897,-86.51950111477794 39.146866370460714),LINESTRING(-86.52376552664045 39.14691371525464,-86.52321554584479 39.14689580768939),LINESTRING(-86.5208431643111 39.149854164409135,-86.5208470937448 39.1486535352019),LINESTRING(-86.50075030303391 39.15023217419014,-86.5002740467857 39.15039499832426,-86.50004360030475 39.150406912310416),LINESTRING(-86.50837007260976 39.146794859345334,-86.50834856520356 39.14569813625465),LINESTRING(-86.50832609231821 39.1437723662294,-86.50832609231821 39.14281445897467),LINESTRING(-86.5084468288185 39.150245471167864,-86.50832135228424 39.14401743080933),LINESTRING(-86.50834094469066 39.14270888136093,-86.50820123478404 39.13764006190027),LINESTRING(-86.53867499879271 39.1506074634697,-86.53811621786186 39.150597558791304),LINESTRING(-86.53621350148495 39.1534006594041,-86.53621499160562 39.15337639344085,-86.53496180393103 39.15335906056856,-86.53496329401075 39.153385637654594,-86.53621350148495 39.15339950390941),LINESTRING(-86.53192239995492 39.15514184211841,-86.53192239995492 39.15468858741306),LINESTRING(-86.53101968241252 39.15833568566438,-86.53062543575709 39.15832944690254),LINESTRING(-86.53018162703495 39.155137831383996,-86.52980692938742 39.15512997851076),LINESTRING(-86.5275660102473 39.15419766551477,-86.5275660102473 39.15419766551477,-86.52726638166389 39.154201505967734))
Duke Energy Lane Closures 315 E North Dr July 1, 2025 to November 30, 2025
WO #46704275, 1-2 days of lane closures per location Sheet 1 - Replacing overhead equipment on pole # 765-564 on E side of S Walnut Street. Replacing pole # 161-169 on E side of S Walnut Street Sheet 2 - Replacing pole # 164-173 on S side of E North Drive. Replacing pole # 164-174 on N side of E North Drive. Replacing overhead equipment on pole # 164-172 on N side of E North Drive. Sheet 3 - Replacing pole #'s 174-456, 174-458, and 764-768 on N side of E North Drive. No overnight closures. Please allow 3 business days in case of inclement weather.
External Project
LINESTRING(-86.53185312871959 39.14429073792101,-86.53178652543639 39.144056304423316,-86.5313971523961 39.14415166729623,-86.53115635591067 39.144270870705725,-86.53093092941367 39.14441788796606,-86.53072087290509 39.14451325034912,-86.53053130971445 39.14455695806484,-86.52997799013089 39.14458874547742,-86.5291428874261 39.14459669232832,-86.5273804620859 39.14458874547742)
Crown Castle Small Cell Tower Work 720 N grant St July 7, 2025 to December 20, 2025
SC-IN E 11th St 510454_0003 Location: In the ROW at the intersecting corner of E 11th St and N Grant St. Type of work: Type of work: Equipment swap/upgrade of telecommunications equipment at an existing small cell site. See attached drawing for more details and scope of work. Extent of Closure: Closure at the side of an intersection, Crosswalk closures and pedestrian detours - see pages 9 & 10 of submitted drawing. Expected date and/or duration: 6/20/2025-12/20/2025 The work is estimated to take 3 days max with the lanes and sidewalks open during the evenings when the crew is not onsite.
Engineering
POINT(-86.52695910510562 39.1734468149738)
Duke Energy Lane Closure 3874 S Laurel Ct July 15, 2025 to October 31, 2025
WO # 56247048 Sheet 1 - Replacing overhead equipment on pole # 173-250 on west side of S Walnut Street Pike. Sheet 2 - Replacing pole # 153-257 on E side of S Walnut Street Pike. Replacing pole #'s 153-256 and 153-253 on W side of S Walnut Street Pike. Sheet 3 - Replacing pole #'s 153-260 and 153-258 along E side of S Walnut Street Pike. Sheet 4 - Replacing pole # 151-208 along W side of S Walnut Street Pike. Replacing pole #'s 179-898 and 151-207 along W side of S Walnut Street Pike. Sheet 5 - Replacing pole # 171-200 along E side of S Walnut Street Pike. Sheet 6 - Replacing pole # 151-197 along W side of S Walnut Street Pike. Replacing overhead equipment on pole # 763-221 along E side of S Henderson Street. No overnight closures. Work will take 1 day in each location, but please allow for 7 business days in case of inclement weather.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52679867430288 39.13354971016764,-86.52678505753391 39.13288955881259),LINESTRING(-86.52679842760878 39.13224505282196,-86.52676438516693 39.131035628067735),LINESTRING(-86.52666225732192 39.125975887719875,-86.52673034220562 39.12820475338694),LINESTRING(-86.5266507488023 39.12420264855925,-86.52666436557128 39.12502133653993))
Duke Energy Lane Closure 2490 S Burberry Ln July 15, 2025 to October 31, 2025
WO # 42544946, lane closure for Installing new pole # MNI-20082 along S side of E Winslow Road. No overnight closure. Work will be completed in 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.52404820796333 39.13594800905645,-86.52297158888547 39.13595944848032)
Duke Energy Overhead Pole Equipment Replacement 2630 S Rogers ST August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Watson St to replace overhead equipment on on pole # 814-4433 at the north west intersection of W Watson St and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53828638186843 39.13674252324108,-86.53840077414678 39.137766578257924)
Duke Energy Lane Closure 327 S Rogers August 1, 2025 to November 30, 2025
WO # 41372422, Replacing overhead equipment on pole # 814-4426 at 2721 S Rogers Street. Pole is on the south east side of W Country Club Dr and S Rogers Street intersection. No overnight closure. Work will take 1-2 hours.
Engineering
LINESTRING(-86.53808061040431 39.13602458627568,-86.53789855805192 39.13601957886871)
Duke Energy Overhead Equipment Replacement 2315 S Rogers ST August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Coolidge Dr to replace overhead equipment on pole # 814-4444 at the North East intersection of W Coolidge Dr and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53880925088721 39.141523443090136,-86.53875325010075 39.140949302825305)
Noth Walnut Street Resurfacing Project North Walnut Street from the SR 45 Bypass to 400 feet north of N Old 37 August 4, 2025 to November 1, 2025
Curb ramp replacements, curb repair, guardrail repair, removal of excess pavement, and updates to signs and markings.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53413596165012 39.187444310277726,-86.53313365190616 39.190531291308986,-86.53308089876174 39.19235070668202,-86.53337104105604 39.19394521175926,-86.53519102453852 39.198912476399556,-86.53477445341915 39.20715205510655),LINESTRING(-86.53477445341915 39.20715205510655,-86.53477445341915 39.20718143901232))
Hopwell West (S. Jackson Street & S. Rogers Street) S. Rogers St from W 1st St and W 2nd St August 4, 2025 to October 31, 2025
The construction of one block of Jackson Street and the reconstruction of one block of Rogers Street, from 1st Street to 2nd Street. The project scope includes installation of new stormwater infrastructure, sidewalks, a multi-use path, and a protected bike lane.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5386883591675 39.16133617881678,-86.53867650265033 39.15949291860181),LINESTRING(-86.53867650265033 39.15949291860181,-86.53867057439174 39.159497515320766))
Duke Energy Lane Closure 2106 E 3nd St August 15, 2025 to October 31, 2025
WO # 42544989, 1 day lane closure for replacing overhead equipment on pole # 167-653 along the east side of S High Street. No overnight closure. Work will take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50841749957901 39.16089752575505,-86.50842587453054 39.16039427112915)
Duke Energy Lane Closure 1906 E Hillside August 15, 2025 to November 30, 2025
WO # 42544994, Installing new pole # MNI-20164 Along SW corner of E Hillside Drive and S Clifton Avenue. No overnight closure. Work should take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.51099562089976 39.150478094675634,-86.50958383249845 39.15048194971982)
Duke Energy Lane Closure 1805 S Walnut St August 15, 2025 to November 30, 2025
WO # 4254498, 1 day lane closure on east side of S Walnut St for removing electronic relcoser on pole # 151-134 along east side of S Walnut Street. No overnight closure. Work will be completed in 1 day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.5328782092761 39.14779840114201,-86.53267163959732 39.147125562490004)
Kinser Ridge -- FULL CLOSURE OF W ACUFF 1030 W Acuff August 18, 2025 to October 7, 2025
Full closure of W Acuff
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5521069171986 39.207809469111794,-86.55206290540151 39.20781373198977,-86.55206840689505 39.20791177781925,-86.55201889360445 39.20809508054495,-86.55196112814916 39.20821444019404,-86.55179883446799 39.20830822261635,-86.55165579608975 39.20834871954207,-86.55161178429269 39.20835085093546,-86.55116341400614 39.20834658811938,-86.55116616467735 39.20838069075808,-86.55166679907678 39.20838708502296,-86.55175482267092 39.208365770863,-86.55180708678384 39.20834871954207,-86.55184834775861 39.20833166818778,-86.55187860589741 39.20831248546409,-86.55193087001031 39.208280514158474,-86.5519776324786 39.208250674322585),LINESTRING(-86.55198038330091 39.20824854289688,-86.5520023891239 39.20823149154751,-86.5520794098821 39.208063109140426,-86.55211792018564 39.207918172126796,-86.55212067100794 39.207832914878935,-86.55212067100794 39.20780520623356),LINESTRING(-86.55211516951442 39.20780520623356,-86.55207115771736 39.207809469111794))
Duke 1-2 day closure of W Dodds alleyway 508 W Dodds St August 27, 2025 to October 27, 2025
WO # 52851282. 1-2 Day closure of the alleyway between W Dodds St and W Wylie St adjacent to 508 W Dodds St occuring between 08/27/25 and 10/27/25. Replacing overhead equipment on 5 poles. No overnight closure.
Engineering
LINESTRING(-86.53916814455523 39.15834416747677,-86.5391746804617 39.157511335215474)
ROW2025-08-1837 Work Site: Along W. Arlington Rd., W. Gourley Pike, & W. Hickory Ln. September 2, 2025 to August 12, 2026
1-2 day single lane closure and sidewalk detour when needed. Type of work: replacing equipment only on 16 existing poles (814-1258, 155-359, 155-363, 176-557, 167-785, 167-786, 152-504, 289-338, 152-521, 761-193, 152-522, 176-556, 156-525, 152-524, 176-554, & 765-838), replacing 13 existing poles (155-404, 155-364, 155-366, 155-368, 152-541, 152-498, 152-499, 152-500, 152-501, 152-503, 152-506, 152-519, & 152-523), replacing span guy from Pole 155-364 to Pole 291-976, from Pole 155-366 to Pole 155-367, from Pole 155-368 to Pole 179-651, from Pole 152-519 to Pole 289-338, & from Pole 152-523 to Pole 152-524, restaple pole ground on existing Pole 167-784, installing new equipment only on existing Pole 167-783, & bond down guys on existing Pole 152-531
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55421487909233 39.19384258328114,-86.55416452901507 39.19376626714609,-86.55382791520819 39.19346734101603,-86.55304248186852 39.19278252378615,-86.55276197020227 39.19248902841798,-86.55249146136924 39.19217833491183,-86.55227806889042 39.191855315645455,-86.55215803580708 39.191620156613936,-86.55203800272378 39.19133072916978,-86.55193797530697 39.19098703246502,-86.55189116483221 39.190726201507545,-86.551863306509 39.19052755986769,-86.551863306509 39.19035482773097,-86.55187445014434 39.18959480063333,-86.55185773545647 39.1888995421337,-86.55184659182113 39.188510885003296,-86.55172941432227 39.18791916588725),LINESTRING(-86.55172941432227 39.18791916588725,-86.55170003581972 39.18789639526034),LINESTRING(-86.55160626666193 39.186529950238736,-86.55114099672214 39.186539967630324),LINESTRING(-86.55110222481878 39.186469845515205,-86.55110222481878 39.186469845515205,-86.55048186371577 39.18643979330611),LINESTRING(-86.55115392128154 39.186560002409266,-86.55085666528944 39.18597898943818,-86.55050771283459 39.18510746028832,-86.55022338140192 39.18433609848503,-86.55020543082198 39.183863020546056,-86.550194908464 39.18358570794612,-86.55018460949856 39.183314281709784,-86.54997782187262 39.182222323040236),LINESTRING(-86.55023630596135 39.18358476418783,-86.55023630596135 39.18358476418783,-86.55059818120074 39.18357474603113),LINESTRING(-86.55010706391695 39.18386526305392,-86.55010706391695 39.18386526305392,-86.54966764132111 39.183875281169264))
Crown Castle Small Cell Tower Work 1314 N Eagleson Ave September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167 Location: In the ROW at the corner of E 17th St and the private driveway. Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work. Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day. Expected date and/or duration: 9/8/2025-3/8/2026 Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
Duke Energy Lane Closure 2610 E Moores Pk September 15, 2025 to November 30, 2025
WO # 42544965, lane closure on Installing new pole # MNI-12564 along S Side of E Moores Pike. No overnight closure. Work should be completed in 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50022933682921 39.15039648044831,-86.49959141682783 39.1504250995699)
Duke Energy Alleyway Closure 409 S Walnut St September 15, 2025 to November 30, 2025
WO # 42544967, Replacing pole # 152-907 in alleyway south of E Smith Avenue and West of S Walnut Street. No overnight closure. Work should only take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.5330249133644 39.16281129906935,-86.53303560824078 39.16251775024534)
Crown Castle Small Cell Tower Work 902 E Cottage Grove Ave September 15, 2025 to March 15, 2026
SC-IN E Cottage Grove Ave 522219_0204 Location: In the ROW to the north of the apartment complex at 900 E Cottage Grove Ave Type of Work: Replace existing utility pole with new 50' wood utility pole (43'-0" final above grade height) and install telecommunications equipment. See attached drawing for more details and scope of work. Extent of closure: Lane closure and detour, sidewalk closure. See page 16 of submitted drawing. Expected date and/or duration: 9/15/2025-3/15/2026. The work is expected to take 3 days max with the area being opened during the evening hours.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.51363350457244 39.171563620591144,-86.51323187257547 39.171562725867915),LINESTRING(-86.52342163600183 39.17249634360991,-86.52243798259646 39.17248620978043))
Duke Energy Pole Work 612 E Atwater Dr September 15, 2025 to October 31, 2025
WO #45028886, 1-2 lane closure in the eastbound lane of Atwater Ave to replace overhead equipment on pole # 177-201 and installing new pole # MNI-12665.
External Project
LINESTRING(-86.52719319904327 39.16316640666511,-86.52591646755216 39.16315392874915)
Milling and Resurfacing on W 11th St W 11th St from W Fountain Dr to N Fairview St September 15, 2025 06:00 am to 16:00 pm October 10, 2025
Lane Restrictions and No Parking on W 11th St from W Fountain Dr to N Fairview St for milling and resurfacing.
Street
LINESTRING(-86.55503171516996 39.173273440839125,-86.54975436734493 39.1732356467686,-86.54681709061092 39.17324509528814,-86.54267321472064 39.1732639923234,-86.54107660371581 39.1732639923234)
CBU - Water and Sewer Main Work - Phase #4 W 2nd Street from west of the B-Line Trail to east of Rogers Street. September 22, 2025 to October 8, 2025
Beginning Monday, September 22, CBU will close W 2nd Street, from just west of the B-Line Trail to just east of Rogers Street, to continue sewer and water line improvements. This phase is anticipated to last through Wednesday, October 8, allowing time for water line testing and final road restoration.
Utilities
LINESTRING(-86.53631631538568 39.16139155375245,-86.5386393891623 39.161398617446935)
Lane Restrictions for Hand Rail Repairs W 3rd St from S Madison St to S College Ave September 22, 2025 06:00 am to 16:00 pm October 3, 2025
The northern most westbound lane of W 3rd St from S Madison St to S College Ave will be closed for hand rail repairs. Traffic will still be able to use the southern most westbound lane. Signage will be in place.
Street
LINESTRING(-86.53739664107009 39.16467916584412,-86.53610746699377 39.16469563273594,-86.53494147594284 39.164685752601315)
ROW2025-09-1951- ROW2025-09-1952- 1919 N Kinser Pike- 1925 N Kinser Pike- September 29, 2025 to October 6, 2025
Single lane closure of South bound lane of N Kinser Pike
Engineering
LINESTRING(-86.53778285395798 39.18818744977827,-86.53776851738206 39.18902972556472)
Milling and Resurfacing on W Fountain Dr W Fountain Dr from N Crescent Rd to the railroad tracks September 29, 2025 06:00 am to 16:00 pm October 10, 2025
Lane Restrictions on W Fountain Dr from N Crescent Rd to the railroad tracks for milling and resurfacing.
Street
LINESTRING(-86.5567753817915 39.175256259041106,-86.55511255954124 39.173251043610264,-86.55444960426502 39.17250117945247,-86.55224337605063 39.171144663300254,-86.55153694829727 39.17074865675619)
CBU - Stormwater Infrastructure Updates South lane of E Atwater Ave. from S Swain Ave. to S Mitchell St. October 1, 2025 to October 7, 2025
CBU crews will be restricting the south lane of E Atwater Ave from S Swain Ave to S Mitchell Ave to perform stormwater infrastructure maintenance.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.51525955139147 39.16304489855841,-86.51420546069332 39.16304203589178),LINESTRING(-86.51420546069332 39.16304203589178,-86.51420361465006 39.16304346722512))