Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Crown Castle Small Cell Tower Work
1314 N Eagleson Ave
September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167
Location: In the ROW at the corner of E 17th St and the private driveway.
Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day.
Expected date and/or duration: 9/8/2025-3/8/2026
Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
Poplars Redevelopment
400 E 7th St
November 22, 2025 to March 2, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52971250992954 39.16849483132833,-86.5288075170272 39.16849314470889,-86.52871179662408 39.1684779651323,-86.52855733870085 39.16847627851246,-86.5284289863421 39.168498204567044,-86.5283463187212 39.168498204567044)
Poplars Redevelopment
400 E 7th St
November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
ROW2025-11-2135
Indiana AVE from Cottage Grove to 13th
January 24, 2026 to February 19, 2026
Closures on Indiana Ave for work on poles
Engineering
LINESTRING(-86.52693332190438 39.172647363872784,-86.5269547795765 39.17339177516254,-86.52695299154631 39.173440293305134,-86.5269470823199 39.17387264720841,-86.52694350609578 39.1743342582989,-86.52695244673798 39.174963597001295,-86.52698820947028 39.174962210819984,-86.5269917856125 39.17353228770159,-86.5269917856125 39.173390892032586,-86.5269703279404 39.172642321988945,-86.52693277701418 39.17264370821596)
Construction for 115 E Kirkwood Lofts
115 E Kirkwood Ave
January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
ROW2025-10-2011
W 11th from W Fountain Dr. to N. Adams St.
January 29, 2026 to February 27, 2026
This phase will include BPW approved lane restrictions and Sidewalk closure that MUST have PROWAG compliant detours.
Engineering
LINESTRING(-86.55041877968597 39.17324963255015,-86.54980902406079 39.173241315132316,-86.54717509472646 39.173239928853576,-86.54717330653254 39.173213590377856,-86.54819254603996 39.17321636284109,-86.5482479783323 39.17321913530421,-86.5488577338756 39.173217749088536,-86.54984121056887 39.17321774912028,-86.55013804167255 39.173220521583346,-86.55042056771607 39.17322468029363,-86.55042056771607 39.17324963255015)
ROW2025-09-1983
Banneker CC.
February 2, 2026 to February 23, 2026
Full Closure of W 7th
Engineering
LINESTRING(-86.54524698146696 39.16865761066893,-86.54524698146696 39.16862017983675,-86.54495015028142 39.168618793498666,-86.54495015028142 39.168656224331585,-86.54524519335493 39.168656224331585)
Bloomington Convention Center Project Lane Restriction
302 S College Ave
February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)
ROW2026-01-2202
601 N Adams St.
February 17, 2026 to March 3, 2026
Single lane closure with flaggers.
Work will take 2 days between 2/17-03/03
Engineering
LINESTRING(-86.54978463784313 39.17110029169535,-86.54975423952887 39.1710697935807,-86.54973814627478 39.17093948317293,-86.54977748531304 39.17093948317293,-86.5497882141491 39.17110029169535)
ROW2026-02-2248
815 N College Ave.
February 18, 2026 to February 20, 2026
Single lane closure for utility work- will be closed for one day within listed window.
Engineering
LINESTRING(-86.5348327592497 39.17480026168056,-86.53479699651739 39.17479887549604,-86.53479699651739 39.1745840132653,-86.53483633547381 39.1745840132653,-86.5348345474436 39.17479748927977)
Wells & Wells Crane Repositioning
1325 N Lincoln
February 18, 2026
Single day lane/road closure on N Lincoln between E 17th and E 18th St to reposition crane at the HUB II Site.
External Project
LINESTRING(-86.53096945523517 39.18032266083236,-86.53097567755705 39.1793483465936)