Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Hopewell Project South Morton Street from West 1st Street to West 2nd Street. August 7, 2023 to August 31, 2024
South Morton Street from West 1st Street to West 2nd Street will be closed to through traffic. Detour in place.
Engineering
LINESTRING(-86.53630036983884 39.159437140754676,-86.53628425635348 39.16133312709155)
Clear Creek Culvert Reconstruction East-west alley behind Von Lee February 5, 2024 to May 31, 2024
Milestone contractors will be performing work to reconstruct the Clear Creek culvert that spans from the east-west alley behind the Von Lee across Indiana Ave. The project will include alleyway, sidewalk, and lane restrictions in the surrounding area and a road closure on Indiana during the final phase of the project.
Utilities
LINESTRING(-86.5282202051962 39.166693654783074,-86.528218241545 39.16704533797687,-86.52697525032963 39.16704533797687,-86.52696346842237 39.16667081815129)
GILLIATTE CONSTRUCTION 200 S GRANT ST March 1, 2024 to May 8, 2024
204A&B, 206A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52987844699828 39.164898033020734),POINT(-86.52987844699828 39.16472752446268),LINESTRING(-86.52987844699828 39.16488971553969,-86.52988381082005 39.16472752446268))
Road Improvements/Expansion by Crider & Crider The 45/46 Bypass between Arlington and N Kinser Pike March 9, 2024 to November 6, 2024
Crider and Crider will be working on multiple projects on 45/46 between Arlington Road and N Kinser Pike. This will include lane restrictions temporary closing of the N Monroe Street intersection on the South side, and other possible changes.
External Project
LINESTRING(-86.55129909883534 39.18708881369716,-86.53779354307697 39.1865871937342)
Adams St Sidewalk Project Along the westside of Adams St and at the intersection of 8th St and Fountain Dr, new sidewalk being installed. March 18, 2024 to June 24, 2024 daily until June 24, 2024
Along the westside of Adams St between Kirkwood Ave and Fountain Dr there will be new sidewalk added. Also, at the S/W corner of 8th St and Fountain Dr, new sidewalk will be added here as well. There is a 60 total day lane closure of the southbound lane of Adams St between Kirkwood Ave and Fountain Dr. The detour will be along 11th St, Rogers St and Kirkwood Ave. The project is scehedule for a total of 90 days.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54963774306117 39.16673030870902,-86.54966231493518 39.169733898511765),LINESTRING(-86.5498670784689 39.16977199815628,-86.54995717429878 39.16982279771074),LINESTRING(-86.55031755824314 39.16984184754179,-86.55022746241326 39.16996884620275,-86.55034213011714 39.170032345447254))
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St. Adams St along Fountain Dr., up Crescent Rd. to 17th St. April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
MC VOTER REGISTRATION 200 N MADISON ST April 9, 2024 to May 8, 2024
219A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.5373638994751 39.167972287401),POINT(-86.5373638994751 39.167972287401),LINESTRING(-86.53732098413086 39.167955651315935,-86.53738535714722 39.16825510024492))
MCGOVERN CONSTRUCTION 100 N GRANT ST May 1, 2024 07:00 am to 19:00 pm May 31, 2024
METERS 109A&B, 111A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52981079888916 39.166890933687256),POINT(-86.52981079888916 39.166890933687256),LINESTRING(-86.52981079888916 39.166890933687256,-86.52981079888916 39.16722365967763),LINESTRING(-86.52981079888916 39.16722365967763,-86.52976788354492 39.16724029593584))
KEYSTONE CONSTRUCTION 100 N WASHINGTON ST May 1, 2024 to May 17, 2024
104A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53229988885496 39.16677447921876),POINT(-86.53229988885496 39.16677447921876),LINESTRING(-86.53223551583862 39.16677447921876,-86.53225697351074 39.16700738796294))
ROSEMARY MARKSON 600 N MORTON ST May 2, 2024 to May 7, 2024
METER 605B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53491772485351 39.172239313264754),POINT(-86.53491772485351 39.172239313264754),LINESTRING(-86.53491772485351 39.172239313264754,-86.53491772485351 39.172638553901066))
Duke Energy lane restriction S Woods Edge Bend May 5, 2024 to May 31, 2024
Lane restrictions for equipment replace and cable burial.
External Project
LINESTRING(-86.51772141628808 39.12656485004962,-86.51758160398511 39.126546150057266,-86.51714288262062 39.126568590047526,-86.51693557472312 39.126553630054815,-86.51669451902836 39.126486310048335,-86.5164438211058 39.12632922978301,-86.51628954546116 39.12612352890582,-86.5162461554361 39.12598888800639,-86.51620276541102 39.12548398234128)
Smith and SR 46 Intersection Improvement Smith Rd north of SR46 May 6, 2024 to June 21, 2024
Smith rd and SR 46 intersection improvements. This includes new storm pipe, sidewalk, curbs, and widening of the intersection. This is part of INDOT's project R-41465. Closures include road and sidewalk closures that will be completed in two phases: north of SR 46 and south of SR 46. The south side will be completed first starting on 3/12/24 and completing 4/26/34 followed by the north side on 4/29/24 and completing 6/13/24. Road closures will be in place on Smith at the intersection for both with planned detours to be used. Private access to homes and business to be maintained as soft closures. 11,797 sq ft of pavement excavations, 80 sq ft of non pavement excavations, 87 sq ft of new sidewalk construction, and 2 residential driveway installations are included in the work
Indiana Department of Transportation
LINESTRING(-86.48122453952156 39.16431837266765,-86.48123593654971 39.16465857895665)
OMEGA PROPERTIES 600 N COLLEGE AVE May 6, 2024 09:00 am to 21:00 pm May 10, 2024
METERS 600A&B, 602A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53481043649292 39.17133269590195),POINT(-86.53481043649292 39.17133269590195),POINT(-86.53478897882079 39.171665400878936),LINESTRING(-86.53478897882079 39.17133269590195,-86.53481043649292 39.17159886000948))
Gilliatte Construction 200 S Grant St May 9, 2024 to May 31, 2024
meters 204A&B, 206A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52985371423338 39.16411261022458),POINT(-86.52985371423338 39.16411261022458),LINESTRING(-86.52981079888916 39.16407933622469,-86.52976788354492 39.163763232440715))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.