Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Hopewell Project South Morton Street from West 1st Street to West 2nd Street. August 7, 2023 to August 31, 2024
South Morton Street from West 1st Street to West 2nd Street will be closed to through traffic. Detour in place.
Engineering
LINESTRING(-86.53630036983884 39.159437140754676,-86.53628425635348 39.16133312709155)
Clear Creek Culvert Reconstruction East-west alley behind Von Lee February 5, 2024 to May 31, 2024
Milestone contractors will be performing work to reconstruct the Clear Creek culvert that spans from the east-west alley behind the Von Lee across Indiana Ave. The project will include alleyway, sidewalk, and lane restrictions in the surrounding area and a road closure on Indiana during the final phase of the project.
Utilities
LINESTRING(-86.5282202051962 39.166693654783074,-86.528218241545 39.16704533797687,-86.52697525032963 39.16704533797687,-86.52696346842237 39.16667081815129)
GILLIATTE CONSTRUCTION 200 S GRANT ST March 1, 2024 to May 8, 2024
204A&B, 206A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52987844699828 39.164898033020734),POINT(-86.52987844699828 39.16472752446268),LINESTRING(-86.52987844699828 39.16488971553969,-86.52988381082005 39.16472752446268))
Road Improvements/Expansion by Crider & Crider The 45/46 Bypass between Arlington and N Kinser Pike March 9, 2024 to November 6, 2024
Crider and Crider will be working on multiple projects on 45/46 between Arlington Road and N Kinser Pike. This will include lane restrictions temporary closing of the N Monroe Street intersection on the South side, and other possible changes.
External Project
LINESTRING(-86.55129909883534 39.18708881369716,-86.53779354307697 39.1865871937342)
Adams St Sidewalk Project Along the westside of Adams St and at the intersection of 8th St and Fountain Dr, new sidewalk being installed. March 18, 2024 to June 24, 2024 daily until June 24, 2024
Along the westside of Adams St between Kirkwood Ave and Fountain Dr there will be new sidewalk added. Also, at the S/W corner of 8th St and Fountain Dr, new sidewalk will be added here as well. There is a 60 total day lane closure of the southbound lane of Adams St between Kirkwood Ave and Fountain Dr. The detour will be along 11th St, Rogers St and Kirkwood Ave. The project is scehedule for a total of 90 days.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54963774306117 39.16673030870902,-86.54966231493518 39.169733898511765),LINESTRING(-86.5498670784689 39.16977199815628,-86.54995717429878 39.16982279771074),LINESTRING(-86.55031755824314 39.16984184754179,-86.55022746241326 39.16996884620275,-86.55034213011714 39.170032345447254))
B-Line Extension Project, from Adams St along Fountain, up Crescent Rd to 17th St. Adams St along Fountain Dr., up Crescent Rd. to 17th St. April 1, 2024 to November 15, 2024 daily until November 15, 2024
B-Line Extension Project. This project runs from Adams St along the north side of Fountain Dr., up the east side of Crescent Rd to 17th St. There will be lane restrictions throughout the project.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55154570965307 39.170728870443895,-86.55521901332583 39.17334679210555,-86.55670122308807 39.175225240685876),LINESTRING(-86.55673989032744 39.17525521592228,-86.55652078039554 39.17572481971655,-86.55659811290778 39.17904193408043))
MC VOTER REGISTRATION 200 N MADISON ST April 9, 2024 to May 8, 2024
219A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.5373638994751 39.167972287401),POINT(-86.5373638994751 39.167972287401),LINESTRING(-86.53732098413086 39.167955651315935,-86.53738535714722 39.16825510024492))
KEYSTONE CONSTRUCTION 100 N WASHINGTON ST May 1, 2024 to May 17, 2024
104A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53229988885496 39.16677447921876),POINT(-86.53229988885496 39.16677447921876),LINESTRING(-86.53223551583862 39.16677447921876,-86.53225697351074 39.16700738796294))
MCGOVERN CONSTRUCTION 100 N GRANT ST May 1, 2024 07:00 am to 19:00 pm May 31, 2024
METERS 109A&B, 111A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52981079888916 39.166890933687256),POINT(-86.52981079888916 39.166890933687256),LINESTRING(-86.52981079888916 39.166890933687256,-86.52981079888916 39.16722365967763),LINESTRING(-86.52981079888916 39.16722365967763,-86.52976788354492 39.16724029593584))
ROSEMARY MARKSON 600 N MORTON ST May 2, 2024 to May 7, 2024
METER 605B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53491772485351 39.172239313264754),POINT(-86.53491772485351 39.172239313264754),LINESTRING(-86.53491772485351 39.172239313264754,-86.53491772485351 39.172638553901066))
Duke Energy lane restriction S Woods Edge Bend May 5, 2024 to May 31, 2024
Lane restrictions for equipment replace and cable burial.
External Project
LINESTRING(-86.51772141628808 39.12656485004962,-86.51758160398511 39.126546150057266,-86.51714288262062 39.126568590047526,-86.51693557472312 39.126553630054815,-86.51669451902836 39.126486310048335,-86.5164438211058 39.12632922978301,-86.51628954546116 39.12612352890582,-86.5162461554361 39.12598888800639,-86.51620276541102 39.12548398234128)
OMEGA PROPERTIES 600 N COLLEGE AVE May 6, 2024 09:00 am to 21:00 pm May 10, 2024
METERS 600A&B, 602A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53481043649292 39.17133269590195),POINT(-86.53481043649292 39.17133269590195),POINT(-86.53478897882079 39.171665400878936),LINESTRING(-86.53478897882079 39.17133269590195,-86.53481043649292 39.17159886000948))
Smith and SR 46 Intersection Improvement Smith Rd north of SR46 May 6, 2024 to June 21, 2024
Smith rd and SR 46 intersection improvements. This includes new storm pipe, sidewalk, curbs, and widening of the intersection. This is part of INDOT's project R-41465. Closures include road and sidewalk closures that will be completed in two phases: north of SR 46 and south of SR 46. The south side will be completed first starting on 3/12/24 and completing 4/26/34 followed by the north side on 4/29/24 and completing 6/13/24. Road closures will be in place on Smith at the intersection for both with planned detours to be used. Private access to homes and business to be maintained as soft closures. 11,797 sq ft of pavement excavations, 80 sq ft of non pavement excavations, 87 sq ft of new sidewalk construction, and 2 residential driveway installations are included in the work
Indiana Department of Transportation
LINESTRING(-86.48122453952156 39.16431837266765,-86.48123593654971 39.16465857895665)
Gilliatte Construction 200 S Grant St May 9, 2024 to May 31, 2024
meters 204A&B, 206A
Public Works
GEOMETRYCOLLECTION(POINT(-86.52985371423338 39.16411261022458),POINT(-86.52985371423338 39.16411261022458),LINESTRING(-86.52981079888916 39.16407933622469,-86.52976788354492 39.163763232440715))
Hawthorne, Weatherstone and Miller Greenway Hawthorne Drive from E 3rd Street to the dead end of Hawthorne south of E Southdowns Drive. May 12, 2024 to September 30, 2024
Lane restrictions will be through out the areas while bumpouts, curbs, sidewalk and speed cushions are installed.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5200455025946 39.164200171847,-86.52019744926322 39.163664668829824,-86.52018363592971 39.15728115895075,-86.52043227593292 39.156638491637295,-86.52049276929516 39.15515020710811,-86.52048752926696 39.15507464332029,-86.52005931592811 39.1538428205175,-86.52065328926909 39.154078475243494,-86.52257334262717 39.15408918680319,-86.52062566260207 39.154078475243494,-86.52003168926109 39.153832108920284,-86.51909238258231 39.15377855090978,-86.51878848924507 39.15373570447204,-86.51863654257644 39.153650011518295,-86.51844315590728 39.15333937368618,-86.51844315590728 39.15292161719805,-86.51867798257696 39.15245029920848,-86.51913382258284 39.15212894422382),LINESTRING(-86.51880901069448 39.15054882520752,-86.51883714449167 39.15079972566309,-86.5189309238156 39.150966992136546,-86.51919350592264 39.15115607549737,-86.5194373321649 39.151345158350125,-86.51951235562406 39.15153060450075,-86.5194748438945 39.15177422909312,-86.51935761973957 39.15196694645681,-86.5191231714297 39.152134210155964,-86.51925446248322 39.152268748060266,-86.51899656934236 39.152025125179875),LINESTRING(-86.51899656934236 39.152025125179875,-86.51899188037618 39.15202148901108),LINESTRING(-86.52694272960544 39.14690660289688,-86.52659974331263 39.14701208403028,-86.52600838763533 39.147002911764076,-86.52525145236842 39.146966222687325,-86.52431119684155 39.1469295335915,-86.52257261115034 39.14686991376993,-86.52086950679977 39.14686532762772,-86.5187761077022 39.1468515691993),LINESTRING(-86.5187761077022 39.1468515691993,-86.51878202125896 39.1468515691993))
1st Street Reconstruction Project West 1st Street Between South Fairview Street to South Rogers Street May 13, 2024 to November 1, 2024
Closure of 1st Street between South Fairview Street to South Rogers Street. A detour route is set in place.
Engineering
LINESTRING(-86.53873635585423 39.15942941125837,-86.54245334738789 39.159439631532734)
OMEGA PROPERTIES 600 N COLLEGE AVE May 13, 2024 09:00 am to 21:00 pm May 15, 2024
METERS 600A&B, 602A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53485335183716 39.17129942531767),LINESTRING(-86.53481043649292 39.17121624878814,-86.53485335183716 39.17158222478227))
WALDRON CENTER 100 S WALNUT ST May 14, 2024 08:30 am to 16:00 pm
METERS 112A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53360880685425 39.16587610969515),POINT(-86.53360880685425 39.16587610969515),POINT(-86.53360880685425 39.16587610969515),LINESTRING(-86.53363026452635 39.16589274627208,-86.53363026452635 39.16617556747798))
Waldron Center 100 w 4th st May 14, 2024 08:30 am to 16:00 pm
meters 102a, 100a & b
Public Works
GEOMETRYCOLLECTION(POINT(-86.53433836770628 39.16562656056891),POINT(-86.53433836770628 39.16562656056891),LINESTRING(-86.53433836770628 39.165676470465,-86.53375901055908 39.16562656056891),LINESTRING(-86.53386629891968 39.16569310708914,-86.53373755288696 39.16564319720487))
GRADUATE HOTEL 100 S LINCOLN ST May 15, 2024 to May 18, 2024
METERS 109A&B, 111A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53105534387207 39.1661090214142),POINT(-86.53105534387207 39.1661090214142),LINESTRING(-86.53094805551147 39.16604247528747,-86.53103388619995 39.16635856882871))
Pavilion Properties Construction Closure 401 S Woodlawn May 15, 2024 to June 1, 2024
Road closure on S Woodlawn From E Atwater to the east/west alley. Sidewalk closure in the east sidewalk of S Woodlawn.
External Project
LINESTRING(-86.52262702738788 39.163067771569615,-86.5226297095969 39.16270799026685)
AMRIT INDIA 100 E 6TH ST May 15, 2024 10:00 am to 22:00 pm May 22, 2024
104B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53356589151002 39.166874297346425),POINT(-86.53356589151002 39.166874297346425),LINESTRING(-86.53352297616577 39.166874297346425,-86.53356589151002 39.167273568440464))
Lane Closure on N Kinser Pike for Sanitary Manhole Replacement N Kinser Pike northbound near W Brookdale Dr May 16, 2024 to May 21, 2024
The northbound lane will be closed to allow equipment to replace a sanitary manhole at the northeast corner of W Brookdale Rd and N Kinser Pike. UPDATE: Due to weather delays, the lane closure will be paused until Monday May 20th.
Engineering
LINESTRING(-86.53771511714368 39.18320040215687,-86.53771097897173 39.18291331955734)
ALLEN FUNERAL HOME 100 S WASHINGTON May 16, 2024 12:00 pm to 16:00 pm
METERS 105A&B, 107A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53229988885496 39.16587610969515),POINT(-86.53229988885496 39.16587610969515),LINESTRING(-86.53229988885496 39.16587610969515,-86.53229988885496 39.16612565793602))
OMEGA PROPERTIES 600 N COLLEGE AVE May 20, 2024 to August 14, 2024
METERS 600A&B, 602A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53478897882079 39.17198146914913),POINT(-86.53485335183716 39.17191492857873),POINT(-86.53485335183716 39.17191492857873),POINT(-86.53485335183716 39.17191492857873),LINESTRING(-86.53485335183716 39.17219772556811,-86.53485335183716 39.17219772556811),LINESTRING(-86.53485335183716 39.17209791499582,-86.53485335183716 39.17209791499582),LINESTRING(-86.53485335183716 39.1719481988718,-86.53478897882079 39.17191492857873))
OSIEL DE SANTIAGO 100 N WALNUT ST May 20, 2024 to June 3, 2024
METERS 102A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53360880685425 39.166907570024165),POINT(-86.53360880685425 39.166907570024165),LINESTRING(-86.53360880685425 39.166890933687256,-86.53360880685425 39.16714047832761),LINESTRING(-86.53360880685425 39.16714047832761,-86.53358734918213 39.16712384204581))
QIXUAN WANG 100 S MADISON ST May 21, 2024 08:00 am to 12:00 pm
METERS 105B & 107A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53740681481933 39.16542692063044),POINT(-86.53740681481933 39.16542692063044),LINESTRING(-86.53744973016359 39.16539364725227,-86.53738535714722 39.16517736991051))
CFC 100 S COLLEGE AVE May 21, 2024 06:00 am to 17:00 pm
METERS 10A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.5348962671814 39.16637520529153),POINT(-86.5348962671814 39.16637520529153),POINT(-86.53485335183716 39.16682438830031),POINT(-86.53485335183716 39.16682438830031),LINESTRING(-86.53478897882079 39.16677447921876,-86.53481043649292 39.16712384204581))
CFC 100 S WALNUT ST May 21, 2024 06:00 am to 17:00 pm
METERS 104A&B, 102A&B, 100A
Public Works
GEOMETRYCOLLECTION(POINT(-86.53358734918213 39.1662421134788),POINT(-86.53358734918213 39.1662421134788),LINESTRING(-86.53358734918213 39.166208840486235,-86.53356589151002 39.16647502398584))
CFC 100 W 5TH ST May 21, 2024 06:00 am to 17:00 pm
METERS 101A&B, 103A&B, 105A, 107A&B, 117A&B, 121B, 123A&B, 125A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53390921426391 39.16654156970333),POINT(-86.53393067193603 39.166558206122886),LINESTRING(-86.53390921426391 39.16659147895015,-86.5344456560669 39.166574842538495),LINESTRING(-86.5344456560669 39.166574842538495,-86.53442419839477 39.16650829685244))
Lane Closure at 2038 N Walnut St for Repaving 2038 N Walnut St in the eastern lane May 22, 2024 to May 23, 2024
The eastern lane on N Walnut St in front of 2038 N Walnut St will be closed during the day while the lane is mill and repaved.
Engineering
LINESTRING(-86.53426200148884 39.184028655267866,-86.5343571164039 39.184574823936345)
B-Line Extension Project, Realignment of Crescent Rd and Fountain Dr. There will be a road closure at the intersection of Crescent Rd and Fountain Dr. May 27, 2024 to September 2, 2024 daily until September 30, 2024
At the intersection of Crescent Rd and Fountain Dr, there will be a road closure. This will be due to the realignment of the intersection. This road closure is scheduled for the beginning of June through mid-September. There will be a signed detour set up for the closure.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5565857252374 39.17502141319386,-86.5565857252374 39.17502141319386,-86.55678109308725 39.175267524158926,-86.55687428768094 39.17538492398754),LINESTRING(-86.55657670779003 39.17539191458954,-86.55657670779003 39.17539890519083,-86.55678411183133 39.17526608404768))
Fox Construction 109 W 4th ST June 3, 2024 to August 9, 2024
meter 101a
Public Works
GEOMETRYCOLLECTION(POINT(-86.5337804682312 39.16562656056891),POINT(-86.5337804682312 39.16562656056891),LINESTRING(-86.53386629891968 39.16552674067049,-86.53414524865723 39.16559328728519))
1st Street Reconstruction Project West 1st Street and South Rogers Street June 3, 2024 to July 23, 2024
Closure of Westv1st Street and South Rogers Street intersection. A detour route is set in place.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53866966666416 39.15979596509274,-86.53866256951217 39.1589980068685),LINESTRING(-86.53915937773237 39.15942725444435,-86.53822963674286 39.15942725444435))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.