Hunters Creek Road, Phase I
2.85 miles east of SR 446
April 2, 2018 to October 1, 2018
This project is phase one of three phases. The road is being reconstructed. The improvements will include 2-10' paved lanes and a 2' aggregate shoulder with improved drainage facilities. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.33120759367742 39.00781679185715,-86.32992013335027 39.00921738565552,-86.32946662365637 39.01039894697425,-86.32989577709874 39.01126595284833,-86.32938079296788 39.01279986028186,-86.32775000988684 39.01573419919441)
Rhorer Road
Old SR 37 South to Walnut St Pike
May 1, 2018 to October 1, 2018
This project is part of the Fullerton Pike Corridor, Phase I. Rhorer Road will be closed for approximately 150 days for the road reconstruction. The intersection of Walnut Street Pike and Rhorer will have restricted lane movements through out the project. The detour route is Old SR 37 South to Fairfax Road. Gordon Pike will remain open during this duration but with construction along the corridor. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.53135322099078 39.121437233312264,-86.52666471963273 39.12144971862483)
Fullerton Pike, Phase I
Rhorer Road
May 7, 2018 to November 29, 2018
This segment of Rhorer Road is to be closed for the road reconstruction project and signal installation. Detour routes are posted for this closure.
Monroe County Highway Department
LINESTRING(-86.53135528781597 39.12145920805793,-86.52659168460553 39.12142591389073)
Trades District
W 10th St
May 14, 2018 to October 31, 2018
W 10th St between N Morton st and N Rogers st will be closed for construction.
Planning & Transportation
LINESTRING(-86.53612471891017 39.17168307578683,-86.5366879828033 39.17168307578683,-86.53681136441797 39.17163732895733,-86.53726197553249 39.171258876771816,-86.53737616100199 39.17123808263665,-86.5380091623295 39.17125471794526,-86.53837394275553 39.171387800272555,-86.5385670618046 39.171404435545725)
Tapp Road & Rockport Road Intersection Improvement
Tapp Road & Rockport Road
June 10, 2018 to November 23, 2018
Installation of a traffic signal and other improvements at the intersection of Tapp Road and Rockport Road.
Planning & Transportation
LINESTRING(-86.54948049435549 39.136365399922454,-86.54765659222537 39.13631546923446,-86.54875093350344 39.13633211280106,-86.5491586292737 39.135899378790896,-86.5481501186841 39.13688134829175)
Tapp Road and Pinehurst Drive
Intersection of Tapp Road and Pinehurst Drive
June 11, 2018 to November 23, 2018
The intersection of Tapp Road and Pinehurst Drive will be closed to traffic during the re-construction of the Tapp Road and Rockport Road Intersection Improvement Project.
Planning & Transportation
LINESTRING(-86.55000246835337 39.13667389442412,-86.55000246835337 39.136357667521)
East Pepperridge Drive Water Project
East Pepperridge Drive, between East Heather Drive and East Heather Drive
August 27, 2018 07:30 am to 15:30 pm October 12, 2018
The City of Bloomington Utilities has scheduled a water line project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.52501917779351 39.12419560255995,-86.52441836297417 39.12383770334023,-86.52379609048272 39.12387515799492,-86.52271784245873 39.124595115820114,-86.52254081666374 39.1248364873168,-86.52250863015557 39.1253774893911,-86.52266419827843 39.1256854425622,-86.52295924127006 39.12598090987973)
W Tapp Rd
W Tapp Rd between S Kegg Rd and Adams St
September 1, 2018 to October 27, 2018
There will be lane shifts on W Tapp Rd between S Kegg and S Adams beginning 9/1 and ending 10/27. Signage and barricades will be in place to direct vehicular traffic. Expect lanes to shift and signage to change as listed:
• Phase 1 9/1/18-9/22/18
• Phase 2 9/22/18-10/13/18
• Phase 3 10/14/18-10/27/18
Planning & Transportation
LINESTRING(-86.56017958145783 39.13653360166177,-86.55524431687041 39.13650863638185)
Eastern Heights
Eastern Heights Neighborhood Project
September 17, 2018 to October 1, 2018
There will be single lane restrictions, both directions for pavement resurface project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.47925575316815 39.176180407356895,-86.47867639602093 39.17553167284967,-86.47821505607037 39.17578950394744,-86.47808631003767 39.176313480362126,-86.47682030738262 39.176288529192846,-86.47678812087443 39.175415232689176,-86.47675593436627 39.174899566803305,-86.47710469926777 39.17447578336768,-86.47866566718487 39.1725790235177),LINESTRING(-86.47880514205364 39.175440184168394,-86.4767988497105 39.17539859836478),LINESTRING(-86.47866566718487 39.17553167284967,-86.4798780256596 39.17481639453209,-86.48025353492169 39.17450865627302,-86.4808650785771 39.17385990634159,-86.4813371473637 39.17356879865767,-86.48172338546185 39.17350225958927,-86.48208816588787 39.173593750792094),LINESTRING(-86.48082216323284 39.17383495430161,-86.48065050185589 39.173152928447166,-86.48045738280683 39.17300321456929,-86.47992094100384 39.17300321456929,-86.47954543174176 39.173186198154525,-86.47842963279156 39.174442118093964),LINESTRING(-86.4802213484135 39.17449202173418,-86.47712071479228 39.174483704463285))
Arlington Rd
Arlington Rd north of 17th St to Prow Road
September 24, 2018 to January 1, 2019
E&B Paving, working on behalf of the City of Bloomington Utilities, has scheduled a water line installation project, weather permitting. To facilitate this work, it will be necessary to reduce traffic at this location to one lane of two-way traffic during the hours work is underway, . Signage and traffic control personnel will be in place.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.54727734399412 39.179301587087565,-86.54809273553467 39.179700787625336,-86.54873646569823 39.180332850507654,-86.5498093493042 39.18199614672781,-86.55010975671387 39.182727984597165,-86.5501526720581 39.18402531482246,-86.55023850274658 39.184723867333986,-86.551397217041 39.18698579925939,-86.5518263704834 39.18831631344736),LINESTRING(-86.55178345513914 39.18834957597937,-86.55178345513914 39.18834957597937))
Lotus World Music and Arts Festival 2018
Kirkwood between Walnut St & Washington St
September 28, 2018 07:00 am to 09:00 am September 30, 2018
E Kirkwood from N Walnut St to N Washington St from 7:00 am Friday, September 28, 2018 until 9:00 am Sunday, September 30, 2018 and all connecting alleys will be closed.
Public Works
LINESTRING(-86.53360954957935 39.16658747464413,-86.53233550029728 39.16658227576562)
Lotus World Music and Arts Festival 2018
E 6th St
September 28, 2018 07:00 am to 15:00 pm September 30, 2018
E 6th St will be closed between North Walnut St & North Washington St, and alley running North to midpoint of block.
Public Works
LINESTRING(-86.53361417127263 39.167568445425985,-86.53232671094547 39.16756220685872)
E Kirkwood Ave
E Kirkwood Ave Between S Washington St & S Lincoln St
September 28, 2018 09:00 am to 12:30 pm September 30, 2018
E Kirkwood Ave Between S Washington St and S Lincoln St including all connecting alleys will be closed on Friday September 28th from 9:00 a.m. to 12:30 a.m. and again 4:00 pm to 12:30 a.m on Saturday September 29th.
Public Works
LINESTRING(-86.53232939315401 39.166580665384544,-86.53109021258913 39.1665640289703)
East Elliston Drive
East Elliston Drive from South Bainbridge Drive to Dead End
October 1, 2018 to October 5, 2018
There will be single lane restrictions, both directions for sidewalk installation/repairs. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
LINESTRING(-86.51929416889323 39.12906014280247,-86.51870408290996 39.12920162756947,-86.5179745220579 39.12920995019394,-86.51758828395977 39.12930982161123,-86.51660123104229 39.12999227250566,-86.51636519664898 39.13005053020251,-86.51618280643596 39.13005053020251,-86.51592531437053 39.130017240095924,-86.51457348102703 39.12942633808575,-86.51438036197794 39.129418015486806,-86.51398339504377 39.129509564020935)
South Baytree Lane Street Repair
South Baytree Lane, between East Pepperridge Drive and East Pepperridge Drive
October 1, 2018 07:30 am to 15:30 pm October 12, 2018
The City of Bloomington Utilities has scheduled a street repair project, weather permitting. Signage will be in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52378119302354 39.12384788195564,-86.52353979421218 39.12367725496799,-86.52317501378614 39.12361483035707,-86.52274586034379 39.1236314769254,-86.52252055478652 39.123739679523624,-86.52248300386033 39.12393527610635,-86.52250446153245 39.12417248825449,-86.52254737687669 39.12435976043878,-86.52263320756514 39.12450957782775,-86.52269221616349 39.12457616323164),LINESTRING(-86.52271367383563 39.124592809572846,-86.52269221616349 39.12458032481729),LINESTRING(-86.52268685174545 39.12458448640274,-86.5226761229094 39.12457200164579))
East Hector Dr
4100 Block of East Hector Drive
October 1, 2018 to October 2, 2018
Lane restriction due to paving.
Street
LINESTRING(-86.48056753912645 39.17307202234281,-86.48058925152985 39.17305419183839)
South Weimer Road
South Weimer Road Between Wesst Wapehani Road and West Tapp Road
October 2, 2018 to October 4, 2018
Lane restriction due to paving.
Street
LINESTRING(-86.5638838639241 39.14401607793894,-86.56235114256181 39.143049351702615,-86.56216725015453 39.142668915330574,-86.56196275922025 39.13658248167545)
IU Fine Arts
E. 13th Street from Fess Avenue to Woodlawn Avenue.
October 3, 2018 to October 26, 2018
Weddle Brothers has been contracted by IU to perform a renovation on the building located at 802 E. 13th Street.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52475291516149 39.17521819290104,-86.52362638737522 39.17518492415513),LINESTRING(-86.52362638737522 39.175201558530034,-86.52362638737522 39.17518492415513),LINESTRING(-86.52362638737522 39.17519324134307,-86.52362638737522 39.175201558530034),LINESTRING(-86.52362638737522 39.175201558530034,-86.52371221806371 39.17519324134307))
East Pierson Court
East Pierson Court off of South The Stands Drive
October 4, 2018 to October 6, 2018
Closed for paving.
Street
LINESTRING(-86.51005533832164 39.12826386981493,-86.51005533832164 39.12826386981493,-86.51049725910514 39.12825197871274)
Arlington Rd
Arlington Rd between 17th and 20th St
October 8, 2018 to October 9, 2018
A lane closure on the north side of the roundabout will result in flaggers at each leg of the roundabout. This lane closure will be in place all day while MCCSC students are on Fall Break 10/8-10/9. More information below:
E&B Paving, working on behalf of the City of Bloomington Utilities, has scheduled a water line installation project, weather permitting. To facilitate this work, it will be necessary to reduce traffic at this location to one lane of two-way traffic during the hours work is underway, . Signage and traffic control personnel will be in place
Planning & Transportation
LINESTRING(-86.54760993791197 39.17939307074437,-86.5480820066986 39.17966752100048,-86.5485326178131 39.18003761131598,-86.54880620313261 39.18036195852983)
Intersection of E 10th Street and North Forrest Avenue
E 10th Street and North Forrest Avenue
October 8, 2018
There will be single lane restrictions, both directions for street resurface. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.5223894972904 39.17176667860352,-86.52238413287238 39.17162943818889),LINESTRING(-86.52251287890509 39.171633596993274,-86.52227684451177 39.17162943818889))
North Fee Lane
North Fee Lane from East 11th Street to East Lawn Lane
October 8, 2018 to October 10, 2018
There will be single lane restrictions, both directions for pavement markings. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
LINESTRING(-86.51888406060034 39.1739774665152,-86.51888406060034 39.17326217238735)
East Thornton Drive
East Thornton Drive between South Olive Street & South Huntington Drive
October 9, 2018 to October 11, 2018
East Thornton Drive will be closed between 7 a.m. and 3:00 for tree and stump removal.
Street
LINESTRING(-86.51881407490642 39.149468377976234,-86.52081425173441 39.149299997135756)
East 1st Street
1200 block of East 1st Street between South Highland Avenue and South Ballantine Road
October 10, 2018 to October 11, 2018
Road will be closed between 7:00 a.m. and 3:00 p.m. for tree and stump removal, weather permitting.
Street
LINESTRING(-86.51772845511547 39.159266578102574,-86.51910276571104 39.15927448119422)
iU Homecoming Parade
Woodlawn Ave between 17th Street and 7th Street
Closure of Woodlawn Ave both North and South lanes from 7th Street to 17th Street.
October 12, 2018 17:00 pm to 21:00 pm
City of Bloomington will be closing both the North and South bound lanes of Woodlawn Ave from 7th Street to 17th Street on 10/12/2018 between 5pm-9pm for the IU Homecoming Parade.
Public Works
LINESTRING(-86.5235295651801 39.17897812491182,-86.5235295651801 39.168498251876485)
House Move - 17th St, Monroe St, 11th St, Adams St, Fountain Dr, 8th St
From 17th and Fee to 1670 W 8th via 17th St, Monroe St, 11th St, Adams St, Fountain Dr, and 8th St
October 14, 2018 06:30 am to 14:00 pm
House Move for Habitat For Humanity. Streets along the route will be closed to through traffic while the house is in the area. Officers will assist with directing traffic.
Planning & Transportation
LINESTRING(-86.5188673861084 39.17877659334627,-86.54710568261719 39.178976195389026,-86.54710568261719 39.1731209666458,-86.54985226464844 39.17318750607495,-86.54961623025515 39.169660829564776,-86.5502385027466 39.169927,-86.55064619851684 39.16961092249605,-86.556074989563 39.16961092249605)
Old SR 37 South
Between Rogers Street and Fairfax Road
October 15, 2018 to October 16, 2018
Traffic will be restricted to one lane during the hours of 8:00 am and 3:00 pm for bridge maintenance activities. Please use caution while traveling in this area. This is weather permitting.
Monroe County Highway Department
POINT(-86.53341313785148 39.10325135716727)
Cherry Lane
Between Fairfax Road and Dutcherman
October 15, 2018 to October 16, 2018
We will be performing ditching for drainage improvements along this segment of roadway. No lane closures, but the crews will be working along the roadway. Please use caution in this area.
Monroe County Highway Department
LINESTRING(-86.51704348397818 39.09720113706834,-86.51350296807853 39.09713452579527,-86.51289142442313 39.09660995982077)
South Walnut Street Stormwater Culvert Replacement Project
South Walnut Street, between East 1st Street and East Dodds Street
October 15, 2018 07:30 am to 15:30 pm October 19, 2018
The City of Bloomington Utilities has scheduled a stormwater culvert replacement project, weather permitting.
The west lane of South Walnut Street, between East 1st Street and East Dodds Street, will be closed to all traffic for the duration of the project. Signage is in place.
Utilities
LINESTRING(-86.53365172219848 39.159390821875036,-86.53366245103453 39.157410858598666)
Windsor Private Subdivision
Thames Drive, Wexford Court and Duxbury Drive
October 15, 2018 to October 19, 2018
We will be paving the roads in this subdivision. Weather Permitting. Please use caution while in this area, the work will be performed under flagging operations.
Monroe County Highway Department
LINESTRING(-86.51783601350647 39.27650366712908,-86.5179862172113 39.27710163831327,-86.51828662462097 39.27755011335205,-86.51897327012878 39.27783248505173,-86.52002469606262 39.27773282458179,-86.52090446061949 39.27778265483448,-86.52148381776672 39.27769960439366,-86.52184859819275 39.27779926491084,-86.5221275479303 39.27793214537991,-86.52223483629089 39.27814807560458,-86.52197734422545 39.27897857026605,-86.52197734422545 39.279327375087945,-86.52219192094665 39.27960973962419,-86.52232066697935 39.27997515086389,-86.52208463258604 39.28025751278906)
East Heather Drive Water Line Project
East Heather Drive, between South Pepper Chase Court and South Grasstree Court
October 15, 2018 07:30 am to 15:30 pm
The City of Bloomington Utilities has scheduled a water line project, weather permitting. Signage and traffic control personnel will be present.
Utilities
LINESTRING(-86.52243604611408 39.126292743138436,-86.5233050818349 39.125801686271956)
1200 Blk of East 1st Street
East 1st Street closed between South Ballantine Rd and South Highland Avenue from 7:00 a.m. to 3:00 pm
October 17, 2018 to October 19, 2018
For tree and stump removal
Street
LINESTRING(-86.51772268061345 39.15927309141816,-86.5191148811699 39.15928101532708)
Dutcherman Drive
Cherry Lane to the dead end
October 17, 2018 to October 18, 2018
We will be performing ditching for drainage improvements along this segment of roadway. No lane closures, but the crews will be working along the roadway. Please use caution in this area.
Monroe County Highway Department
LINESTRING(-86.51294314206902 39.09669813532926,-86.5099283391363 39.096656502993994)
South Fess Street
South Fess Street closed between East 1st Street and East Maxwell Lane from 7:00 a.m. to 3:00 p.m.
October 18, 2018 to October 19, 2018
Tree and stump removal
Street
LINESTRING(-86.52593169589824 39.159325310133596,-86.52596490165892 39.15784371089441)
Westernmost lane of S. Walnut between First Street and Dodds closed to facilitate culvert repair.
South Walnut Street
October 22, 2018 to October 26, 2018
Lane of South Walnut closed to facilitate culvert repair.
Utilities
LINESTRING(-86.5337014655196 39.159338197475364,-86.53369171173463 39.15714495597135)
Ketcham Road
Between Cedar Bluff Road and Thrasher Road
October 22, 2018 to November 20, 2018
This section of road will be closed for a bridge preservation project. Detour routes will be posted.
Monroe County Highway Department
POINT(-86.56687334941265 39.034052265843684)
Thomas Road
Vernal Pike and Ratliff Road
October 22, 2018 to October 24, 2018
The segment of roadway will be under flagging conditions for perform ditching activities. Please use caution when traveling in the area.
Monroe County Highway Department
LINESTRING(-86.63010395837424 39.18901091011185,-86.63061894250511 39.21667962069523)
Tanglewood Road
Union Valley Road to the dead end
October 22, 2018
This road segment will have lane restrictions for paving activities. Please use caution while traveling in this area.
Monroe County Highway Department
LINESTRING(-86.592710934634 39.231206252453546,-86.59205289935568 39.23147218980213,-86.59166666125753 39.23150543189985,-86.59070106601217 39.23150543189985,-86.58855529880026 39.23157191604801,-86.58716055011251 39.231688263155746,-86.58580871676901 39.231787989094556,-86.5855941400478 39.23202068240067,-86.58533664798237 39.232220133191674,-86.58535810565449 39.23245282506474,-86.58555122470356 39.23268551616616,-86.58619495486715 39.232984689305624,-86.58623787021138 39.233250619914315,-86.58591600512959 39.233483308370154,-86.58570142840841 39.23381571911139,-86.58570142840841 39.234414054477185,-86.58574434375265 39.23474646080908,-86.5856799707363 39.23516196650937,-86.58570142840841 39.235610709902005,-86.58608766650654 39.23595973055649)
Leonard Springs Road, west
SR 45 to Fullerton Pike
October 22, 2018 to October 23, 2018
This segment of road will be closed for paving operations, weather permitting. Detour routes will be posted.
Monroe County Highway Department
LINESTRING(-86.61417683773827 39.12234630174399,-86.61336144619776 39.12221312665764,-86.58452233486962 39.12221312665764,-86.58340653591942 39.122712531933246,-86.58276280575583 39.12294558651692,-86.58254822903466 39.123345106866594)
Spicer Lane
Garrison Chapel Road to dead end
October 23, 2018 to October 24, 2018
Spicer Lane will be under flagging operations for paving activities. Weather permitting. Please use caution while traveling in this area.
Monroe County Highway Department
LINESTRING(-86.64290919839536 39.14166884623609,-86.64732947885189 39.14171877312762,-86.64797320901545 39.14164388277703,-86.64903536378534 39.141152932950206,-86.64927139817866 39.141036435878505,-86.64995804368645 39.14086446365846,-86.65005460321099 39.14078957239903,-86.65062323152213 39.14073964484851,-86.65622368394523 39.140797893654025)
South Walnut Street Stormwater Infrastructure Repair Project
South Walnut Street, between East 1st Street and East Dodds Street
October 26, 2018 07:30 am to 05:00 am October 31, 2018
South Walnut Street, between East Dodds Street and East 1st Street, will be restricted to one lane of traffic. This lane restriction will continue for the duration of the project. Signage is in place.
Utilities
LINESTRING(-86.53358734918211 39.15743253917054,-86.53365172219848 39.15939586372721)
IU Street Sprints
Kirkwood Ave. between Lincoln Street and Indiana Avenue
October 27, 2018
IU Street Sprints bicycle race
Public Works
LINESTRING(-86.5310338862002 39.166564028970384,-86.53105534387225 39.166564028970384,-86.52696229291553 39.166547392552246)
Dillman Road
Between SR 37 and Victor Pike, at the bridge
October 29, 2018 to October 30, 2018
This segment of roadway will be closed to perform bridge maintenance. Weather permitting.
Monroe County Highway Department
LINESTRING(-86.55925072503662 39.09302812912287,-86.55478383374813 39.0930380553132,-86.55446196866635 39.09312132423196,-86.55416156125668 39.09308801667626,-86.55371095014216 39.09292147866171,-86.55343200040463 39.09298809391473,-86.546114934212 39.09293813248087)
South Adams Street
South Adams Street from West Woodhill Drive to West Allen Street from 7:00 a.m. till noon.
October 29, 2018
For tree removal.
Street
LINESTRING(-86.55057115199173 39.15703719152194,-86.55055071357214 39.15586059896586)
Woodyard Road
Between Walcott Lane and Hartstrait Road
October 29, 2018 to November 2, 2018
This segment of roadway will be closed between 8:00 am and 5:00 pm each day for the Town of Ellettsville Utilities to work on a water main project.
Monroe County Highway Department
LINESTRING(-86.60173811162758 39.20117296255634,-86.60408271284895 39.20434406400406,-86.60539034457744 39.20713443444217,-86.60575512500348 39.207982396934256,-86.60624865146222 39.20824842227299,-86.60893086047712 39.2082317957188,-86.60981062503399 39.2082317957188,-86.61056164355816 39.20833155498468,-86.61124828906597 39.2085643260539)
Snoddy Road
Robin Road and Blue Bird Lane
October 29, 2018 to October 31, 2018
This segment of roadway will have ditching operations performed under flagging conditions. Please use caution while in the area. Weather permitting.
Monroe County Highway Department
LINESTRING(-86.48957766366574 39.131680672236484,-86.48962057900998 39.133994242537284)
IU Fine Arts Construction Weddle Brothers Inc.
E. 13th Street between Park St. and Woodlawn Ave.
November 1, 2018 to November 30, 2018
Road Closure 24/7 for IU Fine Arts Construction. Road will be open during Home Football games to accommodate traffic.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52470387292458 39.17522275055009,-86.52362026048256 39.175197798993764),LINESTRING(-86.52362026048256 39.175197798993764,-86.52467168641641 39.17522275055009))
South Walnut Street Stormwater Infrastucture Repair Project
South Walnut Street, between East 1st Street and East Dodds Street
November 1, 2018 10:00 am to 15:30 pm November 2, 2018
The City of Bloomington Utilities has scheduled a stormwater infrastructure improvement project, weather permitting. Signage is in place. This lane restriction will remain in place for the duration of the project.
Utilities
LINESTRING(-86.53365172219848 39.15938754467089,-86.53364635778046 39.15740342165674)
Popcorn Road
Between Bennett Lane and Harrodsburg Road
November 1, 2018
This section of roadway will be performing ditching operations under flagging conditions. Please use caution while traveling in the area. Weather permitting.
Monroe County Highway Department
LINESTRING(-86.55398990102226 39.011778861242334,-86.55293847508841 39.01202895530179,-86.55190850682669 39.01214566556021,-86.54506350942069 39.01201228239199)
Strainridge Road
Between Chestnut St and North St
November 1, 2018 07:00 am to 12:00 pm
This segment of roadway will be under lane restrictions for a drainage repair. The work will be performed under flagging conditions. Pleas use caution while in this area. Weather permitting.
Monroe County Highway Department
LINESTRING(-86.50781880672012 39.069688342731524,-86.50778125579393 39.06983827632996,-86.5075076704744 39.070317228746575)
N. Maple Grove Road
North of West Maple Grove Road
November 2, 2018
This segment of roadway will be under flagging operations to perform ditching work. Please use caution in the area. Weather permitting.
Monroe County Highway Department
LINESTRING(-86.56627406551559 39.24453131905659,-86.56625396147476 39.251313215144364,-86.56668311491714 39.251944633688,-86.56646853819596 39.253805623689516)
217 W 6th St
6th St between Morton and College
November 6, 2018 to November 8, 2018
Road Closure on W 6th St between Morton St and College Ave west of the alley.
Planning & Transportation
LINESTRING(-86.53608317998707 39.16758068671447,-86.53554405597507 39.167576527670434)
W 6th St
W 6th St Between N Morton St and the alley east of Morton
November 6, 2018 to November 8, 2018
W 6th St between N Morton St and the alley east of Morton will be closed 11/6-11/8. Signage and Detour route will be in place.
The north south alley will be open to traffic and shall remain accessible.
Planning & Transportation
LINESTRING(-86.53606034589383 39.16757821907879,-86.53554536176297 39.16757406003458)
S Walnut St
S Walnut St between Walnut St Pike and Country Club Dr
November 7, 2018
One lane closure, south bound, on S Walnut St between Walnut St Pike and Country Club Dr.
Planning & Transportation
LINESTRING(-86.5304169781265 39.13784725025806,-86.53048135114284 39.13745197299454,-86.53066374135585 39.137023406717304)
Baby Creek Road
Brummetts Creek Road to the dead end
November 13, 2018
The Stormwater Crews will be cleaning culverts along this roadway. This will be under flagging conditions and weather permitting. Please use caution while in this area.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.40163780757905 39.20569668336435,-86.40127302715302 39.20543064836028,-86.40008467494539 39.20575924224255,-86.3996522811495 39.20635394836219,-86.39926604305136 39.206453710295364,-86.39840773616658 39.20650359120879,-86.39780692134725 39.206553472086824,-86.39714173351156 39.206769622148926,-86.3966482070528 39.20718529347553,-86.39639071498739 39.207717349183866,-86.395596781119 39.208332533572104,-86.39542511974204 39.208565304638086,-86.39533928905357 39.20914643719735,-86.39420203243127 39.2100442537957,-86.39310769115319 39.210543035835116,-86.3926785377108 39.21067604378064,-86.39214209590781 39.21069266975613,-86.39149836574424 39.21064279181789,-86.39001778636803 39.21075917361867,-86.38958863292565 39.21080905147426,-86.3888590720736 39.210626165830575,-86.38823679958213 39.21055966184207,-86.38765744243491 39.210609539839396,-86.38714245830407 39.21080905147426,-86.38458899532188 39.21074254765898,-86.3831513312899 39.21067604378064,-86.38267926250329 39.21074254765898,-86.38255051647057 39.210942058915975,-86.38263634715905 39.21159046658664,-86.38248614345422 39.21175672399934,-86.37958935771813 39.211989483715854,-86.37733630214562 39.212471626388606),LINESTRING(-86.37740067516198 39.212471626388606,-86.37733630214562 39.212471626388606))
Brock Road
Brummetts Creek Road to dead end
November 13, 2018
The Stormwater Crews will be cleaning culverts along this roadway. This will be under flagging conditions and weather permitting. Please use caution while in this area.
Monroe County Highway Department
LINESTRING(-86.39460679756961 39.18357522019414,-86.39366265999635 39.183841337959194,-86.39261123406253 39.183641749729844,-86.39231082665286 39.183741543915374,-86.39128085839114 39.18457315661831,-86.38677474724612 39.18613656186423,-86.38550874459109 39.18615319364798,-86.3832771466907 39.18725088267473,-86.38050910698733 39.187733195159126,-86.37894269692262 39.18876433488552,-86.37887832390628 39.18919674381678,-86.37842771279178 39.190510585400204,-86.37782689797244 39.19117581227806,-86.37694713341556 39.19189092414845)
Victor Pike
Victor Pike, just west of Fluck Mill Road
November 13, 2018 to November 14, 2018
The Stormwater Crews will be ditching along this roadway. This will be under flagging conditions and weather permitting. Please use caution while in this area.
Monroe County Highway Department
LINESTRING(-86.57106178267959 39.07383227285399,-86.57276368174618 39.07342819095294,-86.57330012354915 39.07294509501429)
Stansifer Lane
Stansifer Lane near Stansifer Court
November 15, 2018
The Stormwater Crews will be working along this segment of roadway for drainage repairs. This will be under flagging conditions and weather permitting. Please use caution while in this area.
Monroe County Highway Department
GEOMETRYCOLLECTION(LINESTRING(-86.56835950685112 39.109691946572724,-86.56838096452324 39.11095732456914),LINESTRING(-86.56838096452324 39.11095732456914,-86.56837023568718 39.11094899978818))
Range Road closure - Phase I
Range Road at Indiana Institute on Disability & Community
November 19, 2018 to December 17, 2018
A portion of Range Road north of the Indiana Institute on Disability & Community will be closed Nov. 19-Dec. 17, 2018, for installation of underground utilities. Access to the Institute will remain available, but no thru traffic will be allowed on Range Road. Schedule is subject to change.
Indiana University
GEOMETRYCOLLECTION(LINESTRING(-86.50025984690392 39.17545660103309,-86.4996804897567 39.17539838091474,-86.49932107374872 39.1753651122541,-86.4987284467253 39.175385905168866),LINESTRING(-86.49873917556135 39.175385905168866,-86.4987284467253 39.17539838091474))
E 3rd St
E 3rd St between S Rose Ave and S Mitchell St
November 19, 2018 to November 23, 2018
One lane closure, westbound, at 1725 E 3rd St. Signage and flaggers will be in place to direct traffic
Planning & Transportation
LINESTRING(-86.51102627924375 39.16425186975093,-86.51414837053709 39.16426018823199)
W Grimes Lane
W Grimes Ln between S Walnut St and S Morton St
November 19, 2018 to November 21, 2018
One Lane closure, eastbound, on W Grimes Lane.
Signage and Flaggers will be in place to direct traffic
Planning & Transportation
LINESTRING(-86.53666833760458 39.15337159786807,-86.53396467091757 39.15333831878792)
Range Road closure - Phase I
A portion of Range Road north of the Indiana Institute on Disability & Community will be closed
November 19, 2018 to December 4, 2018
A portion of Range Road north of the Indiana Institute on Disability & Community will be closed Nov. 19-Dec. 4, 2018, for installation of underground utilities. Access to the Institute will remain available, but no thru traffic will be allowed on Range Road. Schedule is subject to change.
Indiana University
LINESTRING(-86.50011337936655 39.17544732139277,-86.49940221155327 39.175352267955844,-86.49871556604545 39.17539979469038)
CANOPY OF LIGHTS
Kirkwood Avenue between College Avenue and Walnut Streets
November 23, 2018 14:00 pm to 21:00 pm
Kirkwood Avenue between College Avenue and Walnut Streets be closed on Friday, November 23th, to vehicular traffic and parking between 2:00 p.m. and 9:00 p.m.
Public Works
LINESTRING(-86.53486289018103 39.16659208199039,-86.5336827182145 39.16658283951182)
Holiday Market
Showers Common, Showers Plaza, North Morton between 7th and 8th streets.
November 24, 2018 07:00 am to 18:00 pm
Annual Holiday Market hosted by the City of Bloomington Department of Parks & Recreation.
Public Works
LINESTRING(-86.53612641099943 39.16950545616501,-86.53610763553633 39.16858008812795)
Lane Closures at Tapp/Rockport Intersection
Intersection of Tapp Road & Rockport Road
November 26, 2018 to November 30, 2018
Lane closures for sidepath/sidewalk construction at the intersection of Tapp Road and Rockport Road.
Planning & Transportation
POINT(-86.54872156256518 39.13634276914749)
East Longview Avenue Stormwater Project
East Longview Avenue, between South Kingston Drive and North Lexington Drive
November 27, 2018 09:00 am to 15:00 pm
The City of Bloomington Utilities has scheduled a stormwater infrastructure installation project, weather permitting.
Signage will be in place.
Utilities
LINESTRING(-86.49278558564757 39.1668853882407,-86.49192727876279 39.16691866091318,-86.49146593881224 39.16716820545517,-86.49102605653378 39.16747597583756,-86.49037159753415 39.16768392803621,-86.48974932504268 39.16773383647242,-86.48912705255124 39.16767560996007,-86.48864425492856 39.16757579296964)
Weddle Brothers IU Fine Arts Project
E. 13th Street between Fess & Woodlawn
November 27, 2018 to February 28, 2019
IU Fine Arts Project Weddle Brothers Construction Group
Public Works
LINESTRING(-86.52470521402921 39.1752171129763,-86.52361087275115 39.17519528036328)
6th St. Lane restriction between Walnut and College - Commercial Services - HVAC rooftop placement
6th St. Lane restriction between Walnut and College
November 28, 2018 09:00 am to 10:30 am
Dotlich Crane, working for Commercial Services will be placing a rooftop HVAC unit atop the Wicks Building on the north side of 6th St between Walnut and College. Signage will be in place.
Planning & Transportation
LINESTRING(-86.53419905036327 39.16757188652625,-86.53482668727277 39.16757500580948)
Tapp/Rockport Intersection
Tapp Road
November 30, 2018 to December 7, 2018
Possible lane restrictions for sidewalk construction.
Planning & Transportation
LINESTRING(-86.54983080697625 39.136457528801714,-86.54882229638666 39.13642424172389,-86.54809273553461 39.13713991042948)
E Miller Dr
E Miller Dr between S Henderson St and S Park Ave
November 30, 2018
One lane closure, westbound on E Miller Dr between S Henderson St and S Park Ave. Flaggers and signage will be in place.
Planning & Transportation
LINESTRING(-86.52688719106295 39.14694202886116,-86.5264258511124 39.14702939435307,-86.52431227040867 39.14690874674048)
N Smith Rd
N Smith Rd between McCraken Way and Grandview Dr
December 6, 2018 to December 7, 2018
One lane, southbound, closure on N Smith Rd between McCraken Way and Grandview Dr.
Signage and flaggers will be in place.
Planning & Transportation
LINESTRING(-86.48135459576542 39.1690341755631,-86.48133313809332 39.16800274642128)
Tapp/Rockport Intersection
Intersection of Tapp Road and Rockport Road
December 10, 2018 to December 14, 2018
Possible lane closures for assorted construction work.
Planning & Transportation
LINESTRING(-86.54910124612427 39.136365989299804,-86.54829658341981 39.13633270217869)
City of Bloomington Utilities Water Main Repair Project
West Bloomfield Road, between South Rolling Ridge Way and South Weimer Road.
December 12, 2018 09:00 am to 15:30 pm
The City of Bloomington Utilities has scheduled a water main repair project, weather permitting. Two-way traffic on West Bloomfield Road will be maintained for the duration of the project. Signage, including an arrow board will be in place.
Utilities
LINESTRING(-86.56313456369018 39.154969986851256,-86.56429327798462 39.154237860082105)
S Rogers St
S Rogers between 2nd and 3rd St
December 12, 2018
The southbound lane of Rogers St at Smith Rd (between 2nd and 3rd st) will be closed from 9a-2p. Flaggers and signage will be in place.
Planning & Transportation
LINESTRING(-86.53864192349668 39.16451293680191,-86.53866338116879 39.16146831797087)
Intersection of East 10th Street and North Jordan Avenue
Intersection of East 10th and North Jordan Avenue
December 18, 2018
Intersection will have lane restrictions for a street repair from 7am to 3pm, Tuesday, December 18, 2018.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.51562129333229 39.1718061563395,-86.51564382362606 39.171403417712554),LINESTRING(-86.51596010950357 39.171596053922826,-86.51535028282863 39.171578503625284))
South Sare Road Traffic Restriction to Facilitate Water Main Break Repair
South Sare Road, between East Winston Street and East Moores Pike
January 2, 2019 11:20 am to 17:00 pm
South Sare Road, between East Winston Street and East Moores Pike, is restricted to local traffic only until further notice to facilitate the repair of a water main break.
Utilities
LINESTRING(-86.49839676690674 39.15039406957035,-86.49901903939818 39.14956205264167,-86.49906195474242 39.148663463310555,-86.49899758172606 39.14774822164256,-86.49891175103758 39.14691617343456,-86.4984825975952 39.14641693978842,-86.49796761346434 39.14610075664774,-86.49762429071043 39.14591770260128,-86.4971522219238 39.14550166890709,-86.49700201821898 39.14511891573662)
West Arlington Road Water Line Installation Project
West Arlington Road, between North Prow Road and West 17th Street
January 2, 2019 08:30 am to 16:00 pm January 11, 2019
E&B Paving, working on behalf of the City of Bloomington Utilities, has scheduled a water line installation project, weather permitting. To facilitate this work, it will be necessary to reduce traffic on West Arlington Road, between North Prow Road and West 17th Street, to one lane of two-way traffic during the hours work is underway (8:30 a.m.-4:00 p.m.), Monday through Friday. Signage and traffic control personnel will be in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54795191956187 39.179583834577414,-86.54884241295481 39.18041965475231,-86.54939494801187 39.18125962322512,-86.54953442288065 39.18144674354767,-86.54950656949065 39.18140888188262,-86.54934935045861 39.18119517055425),LINESTRING(-86.54951564741738 39.18143634798727,-86.54991261435158 39.18215987532173,-86.55014328432688 39.18355285238022,-86.55022911501506 39.18442604780418,-86.55070654821971 39.18559860745273,-86.55118934584237 39.18660483098819,-86.55177406740722 39.18817650669561,-86.55183844042358 39.18910369572228,-86.55181698275146 39.190026714800524,-86.55188135576782 39.190779257420076,-86.55204765272657 39.19143616648938,-86.55235342455427 39.19202239028371,-86.55261628103773 39.19237578524388))
Range Road/14th Street Closure (Phase II)
Range Road/14th Street will be closed at the intersection with the Indiana State Road 45/46 Bypass
January 7, 2019 to March 8, 2019
Range Road/14th Street will be closed at the intersection with the Indiana State Road 45/46 Bypass starting on or about Jan. 7 through Mar. 8, 2019, for installation of underground utilities. No thru traffic will be allowed on Range Road. Schedule is subject to change.
Indiana University
LINESTRING(-86.50416815120448 39.17523555569335,-86.50324010688533 39.175652453228366,-86.50295445162524 39.17525634864643)
South Washington St Closed
South Washington closed between East 1st Street and East 2nd St.
January 7, 2019 to January 8, 2019
Road closed for tree removal.
Street
LINESTRING(-86.53238571954357 39.15937194643786,-86.53238571954357 39.16135185452458)
Single lane access to Data Center west parking lot
The access road for the Data Center west parking lot will be reduced to one lane
January 21, 2019 to February 8, 2019
The access road for the Data Center west parking lot will be reduced to one lane starting on or about Jan. 21 through Feb. 8, 2019, for work on underground utilities. Schedule is subject to change.
Indiana University
GEOMETRYCOLLECTION(LINESTRING(-86.50354972255066 39.174892658423715,-86.50360873114899 39.1746930447878,-86.50357118022278 39.174497589220294,-86.50338879000977 39.174160738988405,-86.50313501829265 39.17377252147131,-86.50298645865753 39.17354525538451),LINESTRING(-86.50298645865753 39.17354525538451,-86.50313129794435 39.1737739830285,-86.5029971874936 39.17356189014731))
1607 S Rogers St
S Rogers St between W Cherokee Dr and Hillside Dr
February 7, 2019 to February 8, 2019
S Rogers St will be closed to thru traffic between W Cherokee Dr and Hillside Dr. Detour signs will be in place to direct traffic to S Walnut St.
The closure will be during the hours of 7 pm-6 am both evenings of 2/7 and 2/8.
This closure is to facilitate the water main tap for the Switchyard Park Project.
Planning & Transportation
LINESTRING(-86.53880180862849 39.15035605673319,-86.53886618164485 39.14714441535946)
2500 E 3rd St
E 3rd St between College Mall Rd and Woodscrest Dr
February 11, 2019 to February 12, 2019
east and westbound lane closures on E 3rd St between College Mall Rd and Woodscrest Dr
Planning & Transportation
LINESTRING(-86.50088585687254 39.164225949668605,-86.50210357976529 39.16423010891077)
West 4th Street Pavement Restoration Project
West 4th Street, between Walnut Street and College Avenue
February 13, 2019 07:30 am to 14:00 pm
The City of Bloomington Utilities has scheduled a street repair project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.53485335183703 39.16562656056891,-86.53365172219836 39.16562656056891)
South Reisner Road
South Reisner Road Closed between East Third to S Meadowbrook Dr.
February 13, 2019
Closed for tree removal
Street
LINESTRING(-86.48797212973119 39.164234049687764,-86.48793994322301 39.162815733927744,-86.48783265486243 39.16251626184095,-86.4864593638468 39.161480577712325)
Range Road access to Data Center west parking lot
Range Road
February 18, 2019 to March 11, 2019
The access road for the Data Center west parking lot will be reduced to one lane starting on or about Feb. 18 through Mar. 11, 2019, for work on underground utilities. Schedule is subject to change.
Indiana University
GEOMETRYCOLLECTION(LINESTRING(-86.50358080573352 39.17475928421939,-86.50361299224168 39.174576304727765,-86.50346278853685 39.174263020553184,-86.50294780440599 39.17348950763122),LINESTRING(-86.50293707556992 39.17350614240726,-86.50293707556992 39.17349782501972))
South Walnut Street Sidewalk
1,000 feet north to 650 feet south of Burks Drive
April 1, 2019 to May 31, 2019
This project will install a sidewalk on the west side of S Walnut Street from approximately 650 feet south of Burks Drive to 1,000 feet north of Burks Drive.
Planning & Transportation
LINESTRING(-86.53141489557964 39.130082858312164,-86.53135052256329 39.12515575362826)
Moores Pike / Clarizz Blvd. Pedestrian Crossing
At the intersection of East Moores Pike and South Clarizz Blvd.
April 1, 2019 to May 31, 2019
This project is intended to enhance intersection safety for pedestrians crossing Moores Pike at the Clarizz Blvd intersection.
Planning & Transportation
LINESTRING(-86.49193887042989 39.150360639469824,-86.49078836053948 39.15032735896574)
South Mitchell Street Sidewalk Project
South Mitchell Street from East Circle Drive to East Maxwell Lane
April 1, 2019 to June 14, 2019
This project would install a sidewalk on the east side of Mitchell Street from Circle Drive to Maxwell Drive. The sidewalk would replace the existing striped shoulder on the street. The project would also include storm water infrastructure along with the curb on the east side of the street.
Planning & Transportation
GEOMETRYCOLLECTION(POINT(-86.51373403106531 39.15779487061269),LINESTRING(-86.51374475990137 39.15778655136711,-86.51378767524561 39.156322348824006,-86.51395933662256 39.1558897376959))