Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
204 E 17th St Alley Paving
204 E 17th St
December 23, 2024 to August 1, 2025
Pavement of the gravel alleyways to the south and east of 204 E 17th St. 2-week closure to pave the alleyways will occur in the date range of 12/23/2024-08/01/2025
Engineering
LINESTRING(-86.53167789778871 39.178935841290155,-86.53168594441574 39.17857614115957,-86.53198769292993 39.17857614115957)
Duke 1-2 day closure of alleyway
1417 A S Walnut ST
March 15, 2025 to August 31, 2025
Replacement of overhead equipment on pole # 151-247. 1-2 day closure of the alley between S Walnut St and S Washington St occuring between 03/15/2025 and 08/31/2025. No overnight closure.
Engineering
LINESTRING(-86.53311762861762 39.15075237627303,-86.53310396215177 39.15112095597746)
Duke Energy Lane Closure
E Winslow, S Rogers, S Smith
March 20, 2025 to June 30, 2025
1-2 Day lane and sidewalk closures to take place between 3/20/25 and 4/10/25 for pole work in three locations:
-East side of S Rogers St between W Ralston Dr and W Graham Dr
-South side of E Winslow Rd between E Allendale Dr and S Xavier Ct
-West side of S Smith Rd between E 3rd St and Stonegate Dr
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.48078203954958 39.16126744620985,-86.48081416974918 39.162351142508044),LINESTRING(-86.51569032760239 39.13596333876856,-86.5135508405162 39.1360142881845),LINESTRING(-86.53866744088982 39.13973269385326,-86.5385725730021 39.138514521268604))
Cable Transfer on a Pole at Cory Ln and W 3rd St
301 S Cory Ln
March 25, 2025 to June 6, 2025
Smithville will be move cables on a pole on W 3rd St in front of 301 S Cory Ln for 2-3 hours between 3/25/25 and 6/6/25. The work may include a sidewalk and lane closure while the crew is working on the pole.
Engineering
LINESTRING(-86.56008139915842 39.16433597396369,-86.55966362604971 39.16433597396369)
Bloomingscapes Lane Closure
1001 N Jackson
April 1, 2025 to June 9, 2025
Lane closure on the north side of W 15th St adjacent to 1001 N Jackson St property for driveway installation at 1001 N Jackson St - driveway will be located on 15th Street. Lane closure will occur for up to 3 days in the date range of 4/1/25 to 6/9/2025.
External Project
LINESTRING(-86.53972641778974 39.17663136406301,-86.54009201738587 39.17663811201288)
Duke Energy Lane Closure
2425 S Walnut St
April 1, 2025 to August 31, 2025
WO # 40994471, single day lane closure for replacing pole # 151-161 and installing new pole # MNI-12336 along West side of S Walnut Street. No overnight closure. Work will take 1 day, but please allow up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.53042191860095 39.13757760681224,-86.53038739118523 39.137782399625735)
Kirkwood 2025 Pedestrian Season / Dining Closure
E kirkwood Ave
April 2, 2025 to November 14, 2025
Planned street closure of 1/2 of the 100 block, 300, 400, and 500 blocks of E Kirkwood from Walnut to Indiana.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53356764722223 39.16659167582003,-86.53296935044038 39.166583421954726),LINESTRING(-86.53104972965902 39.166569102177334,-86.52983561781902 39.166553457020115),LINESTRING(-86.52975826443308 39.16655345702014,-86.52829527648181 39.16654302691339),LINESTRING(-86.52820783352382 39.16654041938648,-86.52696345296756 39.16654302691339))
Smithville Transfer on Pole Line - S Morton St
In front of 922 S Morton St and 1140 S Morton St
April 7, 2025 to June 20, 2025
Sometime between April 7th, 25 and June 20th, 25, Smithville will have a temporary lane closure in front of 2 poles along S Morton St to transfer cables along the pole line. The closures will take about a day total once begun. No sidewalks will be effected.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53636334100577 39.154037091060076,-86.53636664381396 39.153404480027774),LINESTRING(-86.53633209839722 39.15598653952267,-86.53631986645033 39.156362382269634))
Duke Energy Pole Replacements
604 E Allendale Dr
April 15, 2025 to June 30, 2025
WO 42544972. 3 day lane closure on the east side of S Walnut Street Pike south of E Allendale Dr to replace two poles. Work will occur in the date range of 04/15/2025 to 05/31/2025
Engineering
LINESTRING(-86.52679450552313 39.131191988602694,-86.52679450552311 39.13032243600347)
Duke Energy Lane Closure
1606 S Rogers St
May 1, 2025 to October 31, 2025
Lane restrictions for pole work
External Project
LINESTRING(-86.50848539581101 39.15037491562114,-86.50826085249109 39.13670205807966)
Duke Energy Lane Closure
1140 E Carnaby St
May 1, 2025 to August 31, 2025
WO #52890955.
Replacing elbows on 4 separate pads in between S Westminster Way and Acadia Court S. Replacing 718' of underground cable. No work will actually be within the right of way other than the South side of E Winslow Road. We will need a lane restriction on E Winslow Road where we will have flaggers. No overnight closure.
External Project
LINESTRING(-86.52047007232942 39.135984600359905,-86.51980745163719 39.13598082114379)
Duke Energy Lane Closure
594 594 E Graham PL
May 14, 2025 to August 31, 2025
WO # 55906571, 1 day lane closure of S Henderson street to Replace 2 poles on West side of S Henderson Street, and replacing 1 pole on on east side of S Henderson St.
No overnight closure. Work should take 1 day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.52700331931196 39.141169823515156,-86.5269853151809 39.13982928346135,-86.52696731139316 39.13857668280437)
Duke ENergy Pole Replacement
E Miller Dr near S Park Ave
May 15, 2025 to June 26, 2025
Single-day of lane closures along the northern lane of E Miller Dr near S Park Ave to replace 4 poles. Work will occur in the date range of 05/15/2025-06/26/2025.
Engineering
LINESTRING(-86.52402076872254 39.146909037031975,-86.52545362228012 39.14698241948852)
Duke Energy Overhead Equipment
2400 S Walnut St
May 15, 2025 to June 30, 2025
1 day lane closure of the western most lane of S Walnut St near 2400 S Walnut St to install overhead equipment on a pole. Work will occur in the date range 05/15/2025 to 06/30/2025.
Engineering
LINESTRING(-86.53050441163788 39.138834215157345,-86.53040407923476 39.13826589374628)
Duke Energy Overhead Equipment
2400 S Walnut St
May 15, 2025 to July 30, 2025
1 day lane closure of the western most lane of S Walnut St near 2400 S Walnut St to install overhead equipment on a pole. Work will occur in the date range 05/15/2025 to 07/30/2025.
Engineering
LINESTRING(-86.53050441163788 39.138834215157345,-86.53040407923476 39.13826589374628)
Milling and Resurfacing on S Bainbridge Dr
S Bainbridge Dr
May 22, 2025 06:00 am to 16:00 pm June 12, 2025
Lane Restrictions and No Parking on S Bainbridge Dr from E Allendale Dr to the dead end for milling and resurfacing.
Street
LINESTRING(-86.51967728177794 39.130709052786756,-86.51972357429119 39.13026467150348,-86.51969464147041 39.130085122714945,-86.51947475203248 39.1294566983502,-86.51930694167197 39.12897639880515,-86.51930115510781 39.12879235792454,-86.51929536854367 39.128693604083054,-86.51919699695301 39.12850956246348,-86.51905233284911 39.128383875227456,-86.5188324434112 39.12828512081316,-86.51850260925433 39.128258187767045,-86.51794131253122 39.12825369892505,-86.51774456934993 39.12827165429141,-86.51733372329487 39.12835694221911,-86.51709068760033 39.128392852894564,-86.51692866380398 39.128392852894564,-86.51648888492814 39.12835245338337,-86.51630371487516 39.128307565010374,-86.51617062389958 39.12822676586691,-86.51608382543725 39.12811005582938,-86.51603753292402 39.12794845699665,-86.51607225230894 39.12773748018472,-86.51607803887309 39.12766565814712,-86.51612433138634 39.1275220138522,-86.51621112984867 39.12744570270138)
AT&T Lane Closure
116 E 3rd St
May 26, 2025 to June 30, 2025
BORE 57' OF INNERDUCT FROM P.169-288-BLM TO OUTSIDE OF RIGHT OF WAY. ALL WORK WILL TAKE APPROX. 1-2 DAYS TO COMPLETE. SIDEWALKS WILL NOT BE AFFECTED. A TEMPORARY LANE CLOSURE MAY BE UTILIZED. WORK PLANNED BETWEEN 5/20/25 AND 5/30/2025.
External Project
LINESTRING(-86.53238534327707 39.16438196267569,-86.5323880254861 39.164265504053134)
Kinser Ridge Subdivision Road Closure
W Acuff Rd between entrance to Rosewood and entrance to the Cook building
June 2, 2025 to June 6, 2025
Kinser Ridge Subdivision will have W Acuff Rd closed between the Cook entrance drive and the entrance into N Rosewood Dr from June 2nd, 2025 to June 6th, 2025. The work is for sanitary sewer installation for the Kinser Ridge Subdivision.
Engineering
LINESTRING(-86.55111883524721 39.20836505373646,-86.54947547911765 39.20835776699431)
COB Utilities Lane and Sidewalk Restrictions
1501 S Rogers St
June 2, 2025 to June 16, 2025
CBU project to update 24" sewer line that will require street and sidewalk cuts on the west side of S Rogers St adjacent to 1501 S Rogers. The work is expected to take 1-2 weeks and will require a stationary lane closure of the southbound traffic lane on S Rogers. Southbound traffic will be detoured to S Walnut St via Grimes ln to the north and Country club to the south. Sidewalk closures are also required on the west side of S Rogers.
Utilities
LINESTRING(-86.53876075802393 39.15377797688896,-86.53882865001296 39.15037499513218)
No Parking for Curb Ramp Replacement
The Intersection of S Washington St and E Davis St
June 3, 2025 06:00 am to 16:00 pm June 14, 2025
No Parking posted on S Washington St for curb ramp replacement at the intersection of S Washington St and E Davis St. This project will be completed by Groomer Construction.
Street
LINESTRING(-86.53248228910167 39.15438244236029,-86.53248228910167 39.15401101687286)
No Parking for Curb Ramp Replacement
The Intersection of S Washington St and E Wilson St
June 3, 2025 06:00 am to 16:00 pm June 14, 2025
No Parking posted on S Washington St for curb ramp replacement at the intersection of S Washington St and E Wilson St. This project will be completed by Groomer Construction.
Street
LINESTRING(-86.53251578852547 39.151638405298,-86.53252327443325 39.15124558874871)
No Parking for Curb Ramp Replacement
The Intersection of S Washington St and E Driscoll St
June 3, 2025 06:00 am to 16:00 pm June 14, 2025
No Parking posted on S Washington St for curb ramp replacement at the intersection of S Washington St and E Driscoll St. This project will be completed by Groomer Construction.
Street
LINESTRING(-86.53248721633189 39.15261487899002,-86.53249287265518 39.15227932687941)
Duke Energy Lane Closure
1320 W Arlington RD Bloomington, IN 47404
June 3, 2025 to June 17, 2025
-Work orders 57708547/57708571
-1210 W ARLINGTON RD
-Install two spans of wire over W Arlington Rd. Install one pole on the east side of W Arlington Rd
-Close southbound lane of W Arlington Rd, close sidewalk on west side of W Arlington Rd.
-Work will take one day between 6/3 and 6/17
External Project
LINESTRING(-86.54985378366766 39.18205998606382,-86.5491886926745 39.181002860345245)
Curb Ramp Replacement
The Intersection of E Allendale Dr and S Sowders Sq
June 9, 2025 06:00 am to 16:00 pm June 19, 2025
Lane Restrictions at times during curb replacements at the intersection of E Allendale Dr and S Sowders Sq. Signage will be in place.
Street
LINESTRING(-86.5219714009742 39.13088792496356,-86.52219749415531 39.13085138705725)
Milling and Resurfacing on E Woods Edge Way
E Woods Edge Way
June 9, 2025 06:00 am to 16:00 pm June 26, 2025
Lane Restrictions and No Parking on E Woods Edge Way from S Jamie Ln to S Woods Edge Bend for milling and resurfacing.
Street
LINESTRING(-86.51760858243529 39.12550029968634,-86.51739485108445 39.12562925935333,-86.5173057963549 39.12565228784047,-86.51719299369752 39.1256753163201,-86.51627869847445 39.12572597894871)
Milling and Resurfacing on S Woods Edge BND
S Woods Edge Bend
June 9, 2025 06:00 am to 16:00 pm June 26, 2025
Lane Restrictions and No Parking on S Woods Edge Bend from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51774500154046 39.126579157740764,-86.51761424950098 39.12655149463009,-86.51733491559845 39.12656071566818,-86.51714473081377 39.12657454722304,-86.51700803549976 39.12656993670507,-86.51681190744053 39.12653305255026,-86.51658011973419 39.12644084207875,-86.51643153787111 39.12632096828534,-86.51630078583165 39.12615037830449,-86.51624135308641 39.12596595623884,-86.51622352326285 39.12570315396101,-86.51618786361574 39.12522365254145,-86.51616409051763 39.12506228113736,-86.5160987144979 39.124933183747856)
Curb Ramp Replacement
The Intersection of S Allendale Dr and E Bradshire St
June 9, 2025 06:00 am to 16:00 pm June 19, 2025
Lane Restrictions at times during curb replacements at the intersection of S Allendale Dr and E Bradshire St. Signage will be in place.
Street
LINESTRING(-86.51590998709439 39.13547332446399,-86.5159153515124 39.135308967066834)
Curb Ramp Replacement
The Intersection of E Bradshire St and S Uppington Ct
June 9, 2025 06:00 am to 16:00 pm June 19, 2025
Lane Restrictions at times during curb replacements at the intersection of E Bradshire St and S Uppington Ct. Signage will be in place.
Street
LINESTRING(-86.51482213600124 39.13540486564315,-86.51464543752641 39.135407553041716)
Milling and Resurfacing on E Benson Ct
E Benson Ct
June 9, 2025 06:00 am to 16:00 pm June 19, 2025
Lane Restrictions and No Parking on E Benson Ct from S Jamie Ln to the Dead End on the east side of Jamie Ln for milling and resurfacing.
Street
LINESTRING(-86.51755142145535 39.12387392083869,-86.5170520843082 39.12396116797947,-86.51689463565822 39.12397512751198,-86.51669220167966 39.12396465786287,-86.51647627210251 39.12389835004899,-86.51629633078824 39.12380063315692,-86.51609839534251 39.12359472926201,-86.51599942761968 39.1234132541438)
Milling and Paving on W 6th St
W 6th Street
June 11, 2025 06:00 am to 16:00 pm June 14, 2025
Lane Restrictions and No Parking on W 6th St from N Elm St to N Rogers St for milling and paving by Lentz Paving.
Street
LINESTRING(-86.54524824990293 39.1676186724589,-86.54352670441085 39.16762893951133,-86.54212960403073 39.1676186724589,-86.54048751448444 39.16760840540499,-86.53869313437541 39.167598138349575)
Duke Energy Lane Closure
610 E Hillside Dr
June 15, 2025 to August 31, 2025
WO # 42544905, lane closure for Installing pole # MNI-20134 along S side of E Hillside Drive. No overnight closure. Work should take one day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.52583520938855 39.150527338880664,-86.52511243758103 39.150510307008716)
Duke Energy Lane Closure
911 S High St
June 15, 2025 to August 31, 2025
WO # 42544987, Lane closure for Installing new pole # MNI-12597 along E side of S High Street. No overnight closure. Work should only take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50840960956891 39.15771569950863,-86.50840960956891 39.15735330989088)
Duke Energy Lane Closure
1890 S Walnut St
June 15, 2025 to July 31, 2025
WO # 42544990 Replacing pole # 765-566 along E side of S Walnut Street. Lane restriction only, no full road closure required. Traffic flaggers will be on site. No overnight closure. Work should be completed within 1 working day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.5323193519817 39.145937156670215,-86.53225102200278 39.14570711999781)
Milling and Resurfacing on S Sowders Sq
S Sowders Sq
June 16, 2025 06:00 am to 16:00 pm June 26, 2025
Lane Restrictions and No Parking on S Sowders Sq from E Allendale Dr to E Allendale Dr for milling and resurfacing.
Street
LINESTRING(-86.52324677964248 39.13061164212803,-86.52326083817186 39.12917212351644,-86.52205180464624 39.12917212351644,-86.52209398023433 39.130829748441755)
Taycon Lane and Sidewalk Closures for Utility Updates
621 W 10th St
June 17, 2025 to June 20, 2025
1-3 day daily lane and sidewalk closures for street cut for sewer and water updates adjacent to 321 E 10th St.
Asphalt 6'x3'=18sqft, 3'x14'=42sqft. 60sqft asphalt total.
sidewalk 5'x6'=30sqft
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53018404292357 39.17173557558314,-86.53003383921872 39.17173557558314),LINESTRING(-86.53017867850552 39.17170438458956,-86.5300284748007 39.17170334488952))
Lane restriction
Eastern lane of N Walnut S. @ 2038
June 17, 2025 to June 18, 2025
Lane restriction
Engineering
LINESTRING(-86.53425475499124 39.18403869128912,-86.53429424465948 39.1841258098022,-86.53437626158573 39.184551982566035,-86.53433980967414 39.18455669165718,-86.53424564205505 39.18403869128912)
CBU Road Closing
S Woodlawn between E Maxwell & E 1st
June 17, 2025 every 5 days until June 26, 2025
Closing NB Lane of S Woodlawn between E Maxwell & E 1st at 7am to 3pm.
Utilities
LINESTRING(-86.52264299516726 39.159240402899115,-86.52264299516726 39.1578095075933,-86.52264299516726 39.158574873818736,-86.52263319694748 39.15856305325303)
CBU Road Closing for Sewer Repair
1000 Block of E Wylie between S Woodlawn & S Hawthorne 7am to 3 pm.
June 17, 2025 every 5 days until June 26, 2025
Northbound lane of S Woodlawn closed from E Maxwell -S Hawthorne. 1000 Blk of E Wylie between E Maxwell-E 1st 7a-3pm.
Utilities
LINESTRING(-86.52265323032823 39.158550041080645,-86.52021277143065 39.158550041080645)
Taycon Lane and Sidewalk Closure for Utility Updates
317 E 10th St
June 17, 2025 to June 20, 2025
1-3 day, daily lane and sidewalk closures on the north side of E 10th St for street cut for sewer and water updates adjacent to 317 E 10th St
Asphalt 6'x3'=18sqft, 3'x14'=42sqft. 60sqft asphalt total.
sidewalk 5'x6'=30sqft
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53037869873712 39.1716950749998,-86.53020461262189 39.171696313177904),LINESTRING(-86.53038029585744 39.17173964939772,-86.53021898670481 39.17173841122039))
CBU will close a portion of E Wylie Street
E Wylie St from S Woodlawn Ave to S Hawthorne Dr.
June 17, 2025 05:30 am to 16:00 pm
CBU will close a portion of E Wylie St from S Woodlawn Ave to S Hawthorne Dr for scheduled infrastructure maintenance on June 17th from 5:30am to 4:00pm
Utilities
LINESTRING(-86.52261056135907 39.15855250615641,-86.5202298080645 39.1585320595116)
Lane restriction
Northbound eastern lane of S Clarizz BLVD @ 487
June 18, 2025
Lane restriction for utility work
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.49064145445202 39.161745514605,-86.49066598092658 39.161745514605,-86.49066598092658 39.16164916147889,-86.4906332789605 39.16164916147889,-86.49063654908525 39.16174424679792),LINESTRING(-86.49063654908525 39.16174424679792,-86.49064799488117 39.16174678241208),LINESTRING(-86.49064799488117 39.16174424679792,-86.49066107573945 39.161745514605))
Poplars Redevelopment Investigatory Street Cut
400 E 7th St
June 18, 2025 to June 26, 2025
FAW is requesting the temporary closure of a section at the 200 block of Dunn for one day, 6/18/2025. This is to perform an investigation of the existing water line that will tie into the future Poplars water vault.
This will be four spots on the East side of N Dunn Street (see attached markup for specifics).
This will just be investigation.
This will be two spots to the north and two spots to the south of the alley bisecting Dunn and Indiana.
This will be a one-day duration, 6/18.
A 2' x 2' section of the road will be excavated and hydro-vac'd to examine the water main.
External Project
LINESTRING(-86.5282724685448 39.16848672230486,-86.5282690896745 39.167966727579966)
Due to a main break portion of N Kinser Pike is under a lane restriction
Northbound lane of N Kinser Pike from the Bloomington High School Entrance to W Clubhouse Drive
June 20, 2025 14:30 pm to 22:30 pm
Due to a main break portion of N Kinser Pike is under a lane restriction. Northbound lane of N Kinser Pike from the Bloomington High School Entrance to W Clubhouse Dr
Utilities
LINESTRING(-86.5428699070906 39.20083976300535,-86.54304255730912 39.20095781532021,-86.54337770185093 39.20104045182259,-86.54369253460233 39.201028646613906,-86.5472724876625 39.20101290633261)
Taycon Street Cuts for Utility Updates
415 E 10th St
June 21, 2025 to June 25, 2025
1-3 day daily lane and sidewalk closures for street cut for sewer and water updates adjacent to 415 E 10th St.
Asphalt 6'x3'=18sqft, 3'x14'=42sqft. 60sqft asphalt total.
sidewalk 5'x6'=30sqft
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52871680297679 39.17169028332913,-86.52853267816009 39.17168889746509),LINESTRING(-86.52872216583553 39.171727701647654,-86.52853267816009 39.171726315784355))
Milling and Resurfacing on S Uppington Ct
S Uppington Ct
June 23, 2025 06:00 am to 16:00 pm July 3, 2025
Lane Restrictions and No Parking on S Uppington Ct from E Bradshire St to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51473386976328 39.1353842898198,-86.51472296710593 39.13493608223331)
lane closure
921 Lindbergh DR
June 23, 2025 to July 14, 2025
-WO 57851741
-921 N Lindbergh Dr
-Bore new electrical service under N Lindbergh Dr
-Close Northbound lane of N Lindbergh Dr, close sidewalk on east side of N Lindbergh Dr, close parking lane on east side of N Lindbergh Dr
-Close for two days (no overnight closure) between 6/23-7/14 2025
-Total bore length is 104 ft
Engineering
LINESTRING(-86.55254001893981 39.176088294497816,-86.55250960056884 39.175030079494974)
Milling and Resurfacing on S Bradshire Ct
S Bradshire Ct
June 23, 2025 06:00 am to 16:00 pm July 3, 2025
Lane Restrictions and No Parking on S Bradshire Ct from E Bradshire St to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51352100952201 39.13543898750359,-86.51351126932241 39.134528598587394,-86.51340899722665 39.13432838699788)
Milling and Resurfacing on E Bradshire St
E Bradshire St
June 23, 2025 06:00 am to 16:00 pm July 3, 2025
Lane Restrictions and No Parking on E Bradshire St from Dead End to E Bradshire Ct for milling and resurfacing.
Street
LINESTRING(-86.51693545698139 39.13542588373531,-86.51350901089478 39.13540549183054)
EXTENSION: CBU will close N Indiana Ave from E Cottage Ave. to E 11th St.
N Indiana Ave from E Cottage Ave. to E 11th St.
June 23, 2025 to July 11, 2025
CBU will close N Indiana Ave from E Cottage Ave to E 11th St. starting June 23rd to July 11th for scheduled infrastructure maintenance. This is an extension of the previous end date of July 3rd.
Utilities
GEOMETRYCOLLECTION(POINT(-86.52696696219864 39.17255373382051),LINESTRING(-86.52696503192871 39.17255046662339,-86.52698632063579 39.17346148209842))
ROW2025-06-1658
(523 W 7th ST Bloomington, IN 47404)
June 24, 2025 to June 27, 2025
523 W 7 St . Sewer tie in in 7st ..
Closure of east bound lane of 7 St at property address.
Work dates are 06/24-06/27/2025 ,2 days . 4'x4' pavement replacement
MUST NOT CLOSE SIDEWALK. NOTIFY BLOOMINGTON ENG OF OF ANY SCOPE CHANGES
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53979776384965 39.16859879955237,-86.53975604063469 39.16861843919145,-86.53962491034342 39.16861612863852,-86.53958914761112 39.16859648899876,-86.5397962737699 39.16860111007415),LINESTRING(-86.53978882320749 39.1686022653509,-86.53979031328724 39.16860111007415))
QC Communications Boring work
2219 S Rogers St
June 24, 2025 to August 25, 2025
Using a mechanized bore machine to replace 52ft of coaxial cable in pipe crossing S Roger St just north of W Jud St. A lane closure and sidewalk closure are needed. Time frame of project 06/24/2025 to 08/25/2025. Construction should take no more than 2 days once started. Comcast JB0002250437
External Project
LINESTRING(-86.53892126020372 39.1430532630003,-86.53892437982152 39.14336537640227)
Road Closed for Tree Removal
E Dodds St from S Washington St to S Lincoln St
June 24, 2025 06:00 am to 16:00 pm
E Dodds St from S Washington St to S Lincoln St closed for Tree Removal
Street
LINESTRING(-86.53243023526635 39.15740951371356,-86.53131575147636 39.15739846273527)
HARRELL FISH INC
300 N WASHINGTON ST
June 25, 2025
12 RESIDENTIAL SPACES
Public Works
GEOMETRYCOLLECTION(POINT(-86.53229501425442 39.16897635336923),POINT(-86.53229501425442 39.16897635336923),POINT(-86.53227550537478 39.1687192532367),POINT(-86.53227550537478 39.1687192532367),LINESTRING(-86.53227550537478 39.16873437724789,-86.5322364928542 39.169324192870704),LINESTRING(-86.5322364928542 39.169324192870704,-86.5322364928542 39.169324192870704))
Utility Cut Repairs at N Eagleson Ave and E 7th St
N Eagleson Ave and E 7th St
June 25, 2025 09:30 am to 13:00 pm
Lane Restrictions at the intersection of N Eagleson Ave and E 7th St for a Utility Cut repair. Signage will be in place.
Street
LINESTRING(-86.51618110874654 39.168882018037124,-86.51611539462566 39.16884770655122)
Lane Restrictions for Utility Cut Repairs at the Intersection of E Hillside Dr and S High St
E Hillside Dr and S High St
June 25, 2025 01:30 am to 08:00 am
Lane Restrictions at the intersection of E Hillside Dr and S High St for a Utility Cut repair. The Traffic Signal will be placed in a 4-Way flash and signage will be in place.
Street
LINESTRING(-86.50846590448401 39.15049928481801,-86.50846724558853 39.150445204097394,-86.5083921437361 39.15044208405456,-86.50839080263161 39.15049824480454,-86.5084645633795 39.15050136484487)
Road Closure for Crane Use for the AT&T Building
301 N Washington St
June 25, 2025
The AT&T Building will have a crane setup on N Washington St between E 7th St and E 8th St in order to lift equipment up and into the building. The eastern sidewalk of N Washington St will be open, but the roadway and western sidewalk will be closed. The work is expected between 7 am and 4 pm.
Engineering
LINESTRING(-86.53231531064031 39.16946483031563,-86.53232925059166 39.1686056381686)
ROW2025-06-1702
840 S Woodscrest Dr.
June 26, 2025 to June 27, 2025
Sewer repair, cutting portion of street, lane restriction only. 1-2 days
Engineering
LINESTRING(-86.50224743494935 39.158384887384045,-86.50222665468533 39.158391601231074,-86.50218682562404 39.1583110352457,-86.50221106939222 39.158305664161986,-86.50224916679656 39.15838757292292)
Road Closed for Tree Removal
E 1st St from S Park Ave to S Woodlawn Ave
June 26, 2025 07:30 am to 12:00 pm
E 1st St from S Park Ave to S Woodlawn Ave
Street
LINESTRING(-86.5237286018697 39.15931438839999,-86.52267464785467 39.1593038661417)
Milling and Resurfacing on S Smith Rd
S Smith Rd from E 3rd St to E Moores Pike
June 27, 2025 06:00 am to 18:00 pm July 1, 2025
Lane Restrictions on S Smith Rd from E 3rd St to E Moores Pike for milling and paving by E&B Paving.
Street
LINESTRING(-86.4812335537507 39.164170625484644,-86.48085434755804 39.163325331401666,-86.48072794549381 39.16104666197276,-86.48064894420365 39.15732222615446,-86.48055414265546 39.153916155019004,-86.48045934110726 39.15030161864959)
Milling and Resurfacing on E Hagan St
E Hagan St from S Smith Rd to S Park Ridge Rd
June 27, 2025 06:00 am to 18:00 pm June 28, 2025
Lane Restrictions and No Parking on E Hagan St from S Smith Rd to S Park Ridge Rd for milling and paving by E&B Paving.
Street
LINESTRING(-86.48075113774034 39.16295080651685,-86.47628104351874 39.16294405037419)
Bloomington Convention Center Site Preparation
302 S Walnut st
June 27, 2025 to January 26, 2026
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
External Project
LINESTRING(-86.53447106427768 39.16454766952046,-86.53368078602708 39.16453847855911)
Paving on E Winslow Rd
E Winslow Rd
June 30, 2025 06:00 am to 16:00 pm July 1, 2025
Lane Restrictions and No Parking on E Winslow Rd from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51258640217146 39.13614420134823,-86.51027362129034 39.13612458391765)
QC Communications Lane and Sidewalk Closures for Underground Boring Work
2651 S Twin Oaks VLY
June 30, 2025 to July 2, 2025
Using mechanized bore machine to replace 221ft of coaxial cable in pipe. Starting at NW corner of 2651 S Twin Oaks Vly, boring south along east side of road to SW corner of 1139 W Pine Meadows Dr, crossing W Pine Meadows Dr on route.
Expected start date 06/30/2025. Construction should take approx 2 days once stated.
Lane restriction on S Twin Oaks Vly and a side walk closure.
Comcast JB0002263124
External Project
LINESTRING(-86.5504354699702 39.139248990647275,-86.55036962371906 39.13951191270888,-86.5504013274696 39.1398561688878)
Lineal Lane and Sidewalk Closures for Boring Work
1320 W Bloomfield Rd
July 1, 2025 to July 31, 2025
bore 1347' of innerduct from 1310-1400 w Bloomfield rd. bore 35' of innerduct at w 3rd St and s landmark Ave. bore 50' of innerduct under w ross ct. bore 50' of innerduct under s timothy ct. bore 877' of innerduct from s Christopher ln and w Allen St to 1911 s Christopher ln and place new handhole. bore 464' of innerduct from 1400-1412 s beech tree ln and place 2 handholes. bore 214' of innerduct along s Cory ln and place 1 handhole. each road will take 1-3 days to complete. project to take place between 7/1/25-07/31/25. project includes lane and sidewalk closures.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5508819535982 39.16038951038598,-86.55160417460499 39.16042979246578,-86.55210888541487 39.16039364431538,-86.55241900881276 39.160332349538805,-86.55251022160414 39.16030405964699,-86.55299263598482 39.16022233318225),LINESTRING(-86.55299433606473 39.16022425752843,-86.55317676164749 39.160191252552835,-86.55384160145628 39.16000579594953),LINESTRING(-86.55383754761631 39.16000736759386,-86.55413348257426 39.1599052090823,-86.55463616646412 39.15967888819506,-86.55528073691836 39.15929854165833),LINESTRING(-86.5585938088187 39.15675718233618,-86.5585673253609 39.1566853067641),LINESTRING(-86.55757129321621 39.15659119662138,-86.55757249708492 39.156472648285586))
CBU will close the intersection at East Atwater Ave & South High St
Intersection at East Atwater Ave & South High St
July 1, 2025 22:00 pm to 06:00 am July 2, 2025
CBU will close the intersection at East Atwater Ave & South High St for repairs to infrastructure
Utilities
POINT(-86.50847515055187 39.16308730523187)
Duke Energy Lane Closures
315 E North Dr
July 1, 2025 to November 30, 2025
WO #46704275, 1-2 days of lane closures per location
Sheet 1 - Replacing overhead equipment on pole # 765-564 on E side of S Walnut Street. Replacing pole # 161-169 on E side of S Walnut Street
Sheet 2 - Replacing pole # 164-173 on S side of E North Drive. Replacing pole # 164-174 on N side of E North Drive. Replacing overhead equipment on pole # 164-172 on N side of E North Drive.
Sheet 3 - Replacing pole #'s 174-456, 174-458, and 764-768 on N side of E North Drive.
No overnight closures. Please allow 3 business days in case of inclement weather.
External Project
LINESTRING(-86.53185312871959 39.14429073792101,-86.53178652543639 39.144056304423316,-86.5313971523961 39.14415166729623,-86.53115635591067 39.144270870705725,-86.53093092941367 39.14441788796606,-86.53072087290509 39.14451325034912,-86.53053130971445 39.14455695806484,-86.52997799013089 39.14458874547742,-86.5291428874261 39.14459669232832,-86.5273804620859 39.14458874547742)
CBU road closure - South Washington ST
South Washington ST from East 3RD St. to East 2ND St
July 1, 2025 03:00 am to 06:00 am
Starting at 3:00AM until 6:00AM Tuesday July 1st, South Washington St. will be closed to all traffic starting at E 3RD St. and ending at East 2ND St. CBU will be posting No Parking signs on the West side of the 400 block of South Washington St. Crews will be inspecting underground storm drain networks
Utilities
LINESTRING(-86.53235748937597 39.164549864410134,-86.5323919370023 39.161420453123014)
Utility Cut Repair at The Intersection of N Eagleson Ave and E 7th St
N Eagleson Ave and E 7th St
July 2, 2025
Lane Restrictions at the intersection of N Eagleson Ave and E 7th St for a utility cut repair.
Street
LINESTRING(-86.5161943165138 39.16888598583719,-86.51609499502226 39.1688406901049)
Milling and Resurfacing on Grant St
Grant St from E 3rd St to E 10th St
July 2, 2025 06:00 am to 18:00 pm July 7, 2025
Lane Restrictions and No Parking on Grant St from E 3rd St to E 10th St for milling and paving by Milestone.
Street
LINESTRING(-86.52984447388664 39.164676842565655,-86.52980970358826 39.1665777977249,-86.5297862193574 39.16858971210186,-86.52977447724197 39.170565155739524,-86.52976273512655 39.17166664629798)
Paving Grant from 3rd to 10th
Paving Grant from 3rd to 10th
July 3, 2025 to July 9, 2025
Milestone will be milling Grant from 3rd to 10th on 7/3/25; they will return to pave 7/8/25 & 7/9/25; they will pave block by block and if you need access the closed block you can let the flagger know; there will be No Parking on Grant from 3rd to 10th during milling and paving
Public Works
LINESTRING(-86.52974181582599 39.171671639082206,-86.52974458185408 39.171622578197656,-86.52981239145069 39.16460216512627)
Smithville Boring Work
400 S Lincoln
July 3, 2025 to August 1, 2025
2 days of lane and sidewalk closures to occur between 7/3/25 and 8/1/25 at the intersection of Smith Ave. and Lincoln St. Smithville will be relocating a fiber due to the Jordan Culvert. Boring along Smith Ave. for about 120'. Closure of the south side sidewalk and the north side sidewalk when crews are boring. Sidewalk Reconstruction will also be needed. Night time lane closure of Westbound Smith Ave during splicing.
External Project
LINESTRING(-86.53359174409282 39.162855480422735,-86.53301838261233 39.16284679195516,-86.5324114036435 39.1628424477486)
JDH Fiber Boring
1900 S Walnut St
July 3, 2025 to July 18, 2025
Lane and shoulder closures on the west side of S Walnut St from E Burks Dr to E Miller Dr for Boring 7500' of 1.5"Duct and tracer wire. 8 Hand Holes will also be installed along the route.
External Project
LINESTRING(-86.53151740173263 39.14288829093434,-86.53122548417792 39.14191523093959,-86.53042887926863 39.13840162013929,-86.53042266835763 39.13799695693268,-86.5304537233864 39.137688641037585,-86.53047235659321 39.137558569519825,-86.53094473496792 39.136437682224255,-86.53116215455593 39.13589313683292,-86.53143543890384 39.13472727445571,-86.5314354389039 39.13329255762258,-86.53145876540121 39.131985581787376,-86.53141463633257 39.1294161856589,-86.53140259554154 39.126694591414065,-86.53280007183596 39.12671868242569)
Axis Fiber Solutions Boring Work
1220 W Arlington Rd
July 7, 2025 to July 10, 2025
2 day lane and sidewalk closure on the west side of W Arlington Rd for UG fiber boring. 1072' of boring and 36 sq ft of non pavement excavation. Work dates are 7/725/ to 7/10/25.
External Project
LINESTRING(-86.5474409387453 39.17937906812827,-86.54818702615071 39.179774269968675,-86.54874037440463 39.1803429715161,-86.54935589660899 39.18121047326545)
Crossroads Communication Boring Work
3717 E 3rd St
July 7, 2025 to July 10, 2025
3 days of lane and shoulder closures for directional boring for Fiber Optic home service. Work includes Handholes, Splice Cases, and 1167' of boring. Approximately 1167 feet. Work path Starts at 3709 E 3rd St on south side of road and moves east to S Smith Rd and then north on S Smith Rd ending at 110 S Smith Rd.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.48426253036747 39.1642131038154,-86.48131102821013 39.164221492432034),LINESTRING(-86.48130503102406 39.16563498637893,-86.48126334792087 39.16439612787843))
ROW2025-07-1740
116 N clark
July 7, 2025
116 N Clark street
SIngle lane closure- lasting one day- 07/07/2025 for replacing 115' of gas line.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50498605410867 39.16735557912807,-86.50498605410867 39.167223875504305,-86.50500244539508 39.167223875504305,-86.50500393547482 39.167356734393536,-86.50498456394708 39.167356734393536),LINESTRING(-86.50498307386734 39.167356734393536,-86.50498307386734 39.167356734393536))
Milling and Paving on the offset of E Winslow Rd
E Winslow Rd
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on the offset of E Winslow Rd from Dead End to Dead End for milling and resurfacing.
Street
LINESTRING(-86.51257500600484 39.1361449493632,-86.51199055871697 39.136125239551774,-86.51028077814193 39.13613087092702)
Milling and Resurfacing on N Dunn St
N Dunn St from E Cottage Grove Ave to E 11th St
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on N Dunn St from E Cottage Grove Ave to E 11th St for milling and resurfacing.
Street
LINESTRING(-86.52827611187989 39.172595482942256,-86.52830158481 39.17343969653689)
Milling and Resurfacing on E 11th St
E 11th St from N Woodlawn Ave to N Forrest Ave
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on E 11th St from N Woodlawn Ave to N Forrest Ave for milling and resurfacing.
Street
LINESTRING(-86.52346146516543 39.17342503040544,-86.52242174877269 39.1734149550648)
Crown Castle Small Cell Tower Work
720 N grant St
July 7, 2025 to December 20, 2025
SC-IN E 11th St 510454_0003
Location: In the ROW at the intersecting corner of E 11th St and N Grant St.
Type of work: Type of work: Equipment swap/upgrade of telecommunications equipment at an existing small cell site. See attached drawing for more details and scope of work.
Extent of Closure: Closure at the side of an intersection, Crosswalk closures and pedestrian detours - see pages 9 & 10 of submitted drawing.
Expected date and/or duration: 6/20/2025-12/20/2025
The work is estimated to take 3 days max with the lanes and sidewalks open during the evenings when the crew is not onsite.
Engineering
POINT(-86.52695910510562 39.1734468149738)
Paving alley between Kirkwood and 4th from Indiana to north/south alley past Grant
Alley between Kirkwood and 4th from Indiana to north/south alley past Grant
July 7, 2025 to July 27, 2025
The alley between Kirkwood and 4th from Indiana to north/south alley past Grant will be milled and paved. The section between Dunn and Grant will also receive stormwater upgrades.
Public Works
LINESTRING(-86.52697163873741 39.16605678855879,-86.53045079910586 39.16606715389989)
EXTENSION: CBU Utilities will extend the closing of a portion of S Swain Ave for scheduled maintenance.
S Swain Ave mid way between E 3rd St and E Atwater.
July 7, 2025 to July 19, 2025
CBU Utilities will extend the closing of a portion of S Swain Ave between E 3rd St and E Atwater Ave, starting July 7th to July 19th. Local businesses will maintain access via parking lot and alleyway.
Utilities
LINESTRING(-86.51526480359296 39.16346885887083,-86.51525917247388 39.16309337558843)
ROW2025-07-1737
West bound lane of East Short St at 1250
July 7, 2025
Single lane restriction lasting 1 day 07/07/2021
No sidewalk closure
install gas line for 1250 e short st - will have cut the asphalt
Engineering
LINESTRING(-86.515398812434 39.144056067070096,-86.51542563452415 39.14404451030265,-86.51551057119755 39.14404451030265,-86.51553739328767 39.14405491139027,-86.515398812434 39.14405491139027)
Milling and Paving on N Forrest Ave
N Forrest Ave from E 10th St to E 11th St
July 7, 2025 06:00 am to 16:00 pm July 10, 2025
Lane Restrictions and No Parking on N Forrest Ave from E 10th St to E 11th St for milling and resurfacing.
Street
LINESTRING(-86.5223952425099 39.17338445945231,-86.52237651440174 39.17168574622244)
CBU will close South Swain Ave
South Swain Ave from E 3rd St to East Atwater Ave
July 7, 2025 to July 14, 2025
CBU will close South Swain Ave from E 3rd St to East Atwater Ave from July 7th to July 14th, 2025
Utilities
LINESTRING(-86.51528211035685 39.164206288793906,-86.51527246910867 39.16310742030771)
Closure for Utility work for Hub 2 Development
181 E 17th ST Bloomington
July 7, 2025 06:00 am to 17:00 pm July 18, 2025
10 sewer laterals to be removed/capped: 2 on Washington 7 on Lincoln, and 1 on 17th. 3-4 day road closure on Washington, 10 day road closure on Lincoln, and 3-4 day lane closure on E17th. Each cut estimated to be 6'x6' =36sqft for a total of 360 sqft of pavement.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53212932593961 39.18029933264927,-86.5322233198071 39.17989528716444),LINESTRING(-86.53096721994163 39.18031258000289,-86.53097149239015 39.179517734366726))
ROW2025-06-1672
1730 S Walnut ST
July 10, 2025 to July 12, 2025
Real America intends to replace the entrance to the parking lot of The Retreat at the Switchyard and the Meineke Car Care Center with new concrete. The concrete entrance/approach will be poured over the course of 3 days. The existing sidewalk will be cut with a clean edge on both sides of the approach and replaced with new concrete. The work will require a lane closure on the southbound side of S Walnut St and a sidewalk closure on either side of the driveway entrance. The closure is planned between July 10th, 2025 and July 12th, 2025.
Engineering
LINESTRING(-86.53301584884403 39.14805191824351,-86.53269818272106 39.14699056727642,-86.53267420784894 39.1469952155353,-86.53299586978393 39.14804727002249,-86.53301584884403 39.14805501705379)
ROW2025-07-1748
840 S Woodscrest DR
July 10, 2025 to July 11, 2025
road repair
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50224698145422 39.15838634177942,-86.50222164960753 39.15837940917547,-86.50218886703469 39.15830661628462,-86.50219184719418 39.158283507491234,-86.50224400129474 39.158385186366644),LINESTRING(-86.50224400129474 39.158385186366644,-86.502242511215 39.15838287547754),LINESTRING(-86.50223059024968 39.15837709828617,-86.50223059024968 39.158378253699084))
Milling and Resurfacing on E Longview Ave
E Longview Ave from N Glenwood Ave W to N Glenwood Ave E
July 14, 2025 06:00 am to 16:00 pm July 17, 2025
Lane Restrictions and No Parking on E Longview Ave from N Glenwood Ave W to N Glenwood Ave E for milling and resurfacing.
Street
LINESTRING(-86.49006102202522 39.16772820066117,-86.48964046038435 39.16775569982602,-86.4886169248246 39.16760249005637,-86.486990415346 39.167315711898254,-86.48635197237307 39.167233213855354,-86.48556658617626 39.16717428662264,-86.4849180091879 39.16717821510636,-86.48438090636944 39.167201786004085,-86.48428463322273 39.16717821510636)
Milling and Resurfacing on N Glenwood Ave W
N Glenwood Ave W from E Longview Ave to the Dead End
July 14, 2025 06:00 am to 16:00 pm July 17, 2025
Lane Restrictions and No Parking on N Glenwood Ave W from E Longview Ave to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.49009308023123 39.167745839995405,-86.49009928140869 39.16803110066664)
Milling and Resurfacing on S Kingston Dr
S Kingston Dr from E 3rd St to the end of City maintenance by Target
July 14, 2025 06:00 am to 18:00 pm July 16, 2025
Lane Restrictions and No Parking on S Kingston Dr from E 3rd St to end of City maintenance by Target for milling and paving by E&B Paving.
Street
LINESTRING(-86.49303988182588 39.1641444364904,-86.49303988182588 39.163409278798895,-86.49322222217461 39.162692963914395,-86.4932404562095 39.16253273458665,-86.49321614416301 39.161519511269404)
Lineal Trenching Work
215 S Walnut St
July 14, 2025 to July 28, 2025
A050ACS DIG TRENCH TO PLACE FROM HAND HOLE TO SPARE DUCT 2' X 60' X 3' DEEP. The work will be in the alleyways behind 215 S Walnut St. The work is planned between 6/9 to 6/27. The alleys will be open every night after the work has started.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53448030430499 39.16509887598241,-86.5342946898846 39.16510039082567),LINESTRING(-86.53425756697071 39.16513068814601,-86.53425756697071 39.165262481349345))
Lineal Pole and Boring Work
1320 W Arlington Rd
July 14, 2025 to July 16, 2025
A052WWY- Replacement of 3 fiber poles just north of the roundabout of Arlington Rd and N Monroe St and W 17th St. After the poles have been relocated, the fiber on the original poles will be placed on the new poles. The work is expected to take 2 days to complete and will have only 1 lane closure.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54760204546919 39.17944752111052,-86.5478302186859 39.17956543664536),LINESTRING(-86.5487274198744 39.180343824854276,-86.54887166736086 39.18053695970096))
ROW2025-07-1730
513 W 7th
July 14, 2025 to July 18, 2025
single lane restriction
Engineering
LINESTRING(-86.53950481819214 39.168594831911975,-86.53947650602227 39.16861216099912,-86.53936772741821 39.16860985047768,-86.53936027685582 39.16859367663514,-86.53950481819214 39.16859714246564)
Smithville Communications Pole Transfers
116 S College Ave
July 14, 2025 to August 15, 2025
Pole Transfers for Duke Poles in 4 separate locations:
-100 S College Ave, S Gentry St lane and sidewalk closure on the east side of street 1-2 days.
-108 E 3rd St, east west alley closure between E 3rd and E Smith Ave and S Lincoln and S Grant 1-2 days.
-336 S Dunn St, S Kirby Alley closure between E 3rd St and E Smith St 1-2 days.
-700 Atwater, sidewalk and lane closure on south side of Atwater east of S Fess 1-2 days.
External Project
LINESTRING(-86.52583131563965 39.1631308792044,-86.52553898203813 39.16312702112731)
Smithville Communications Pole Transfers
116 S College Ave
July 14, 2025 to August 15, 2025
Pole Transfers for Duke Poles in 4 separate locations:
-100 S College Ave, S Gentry St lane and sidewalk closure on the east side of street 1-2 days.
-108 E 3rd St, east west alley closure between E 3rd and E Smith Ave and S Lincoln and S Grant 1-2 days.
-336 S Dunn St, S Kirby Alley closure between E 3rd St and E Smith St 1-2 days.
-700 Atwater, sidewalk and lane closure on south side of Atwater east of S Fess 1-2 days.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53554227711007 39.16594134367148,-86.5355384678484 39.16578776455148),LINESTRING(-86.53044197575566 39.165082225102765,-86.53019841033252 39.165089262771176),LINESTRING(-86.52914448973348 39.162892605551974,-86.52915401510451 39.16317642164927))
ROW2025-07-1762
521 N Park
July 14, 2025 to July 18, 2025
sewer work-
Single lane restriction
Engineering
LINESTRING(-86.52467946546788 39.17133377012718,-86.52468140395487 39.17142093651094,-86.52465814157847 39.17138486765566,-86.52465814157847 39.17133527300106,-86.5246775268744 39.17130972422345,-86.52468140395487 39.171339781622464)
CBU will close South Swain Ave - Phase 2
South Swain Ave from East Atwater Ave to East Hunter Ave
July 14, 2025 to July 18, 2025
CBU will close South Swain Ave from East Atwater Ave to East Hunter Ave
Utilities
LINESTRING(-86.51526882108175 39.163025170287426,-86.51525967104456 39.16219274386114)
CBU Utilities will close S Swain Ave for scheduled maintenance. Stage 2
S Swain Ave between E Atwater Ave and E Hunter Ave, starting July 14th to July 18th.
July 14, 2025 to July 18, 2025
CBU Utilities will be closing a S Swain Ave between E Atwater Ave and E Hunter Ave, starting July 14th to July 18th.
Utilities
LINESTRING(-86.51526019789227 39.1630307603094,-86.51525756480564 39.16219371189351)
Milling and Resurfacing on N Glenwood Ave E
N Glenwood Ave E from E Longview Ave to E Morningside Dr
July 14, 2025 06:00 am to 16:00 pm July 17, 2025
Lane Restrictions and No Parking on N Glenwood Ave E from E Longview Ave to E Morningside Dr for milling and resurfacing.
Street
LINESTRING(-86.48433908124589 39.16719367542706,-86.4842438238193 39.16714290100509,-86.48422298625724 39.16708751068481,-86.48421703266807 39.166533605082634,-86.48419917190058 39.166275114308775)
Duke Energy Lane Closure
2490 S Burberry Ln
July 15, 2025 to October 31, 2025
WO # 42544946, lane closure for Installing new pole # MNI-20082 along S side of E Winslow Road. No overnight closure. Work will be completed in 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.52404820796333 39.13594800905645,-86.52297158888547 39.13595944848032)
Duke Energy Pole Installation
2822 S Walnut Street Pike
July 15, 2025 to August 31, 2025
3 day lane closure on the west side of S Walnut St Pike just north of the intersection with S Henderson St to install a new pole. Work will occur in the date range of 07/15/2025 to 8/31/2025.
Engineering
LINESTRING(-86.52726663450107 39.13401449566953,-86.52698017452919 39.13366746504764)
Duke Energy Lane Closure
3874 S Laurel Ct
July 15, 2025 to October 31, 2025
WO # 56247048
Sheet 1 - Replacing overhead equipment on pole # 173-250 on west side of S Walnut Street Pike.
Sheet 2 - Replacing pole # 153-257 on E side of S Walnut Street Pike. Replacing pole #'s 153-256 and 153-253 on W side of S Walnut Street Pike.
Sheet 3 - Replacing pole #'s 153-260 and 153-258 along E side of S Walnut Street Pike.
Sheet 4 - Replacing pole # 151-208 along W side of S Walnut Street Pike. Replacing pole #'s 179-898 and 151-207 along W side of S Walnut Street Pike.
Sheet 5 - Replacing pole # 171-200 along E side of S Walnut Street Pike.
Sheet 6 - Replacing pole # 151-197 along W side of S Walnut Street Pike. Replacing overhead equipment on pole # 763-221 along E side of S Henderson Street.
No overnight closures. Work will take 1 day in each location, but please allow for 7 business days in case of inclement weather.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52679867430288 39.13354971016764,-86.52678505753391 39.13288955881259),LINESTRING(-86.52679842760878 39.13224505282196,-86.52676438516693 39.131035628067735),LINESTRING(-86.52666225732192 39.125975887719875,-86.52673034220562 39.12820475338694),LINESTRING(-86.5266507488023 39.12420264855925,-86.52666436557128 39.12502133653993))
Lineal Boring Work
331 S Washington
July 17, 2025 to July 25, 2025
3 days of lane closure on S Washington St adjacent to 331 S Washington for 3'x4' street cut on east side of street. 3'x4' non pavement excavation on west side of S Lincoln. boring from manhole to handhole. Work to occur between 7/17/25 and 7/25/25. A050ACS
External Project
LINESTRING(-86.53238430903951 39.16407219675256,-86.53238121765438 39.163729463502165)
ROW2025-07-1764
2038 N Walnut ST
July 17, 2025 to July 27, 2025
Lane restriction for installation then removal of jersey barriers not to last more than 3 days total - between 07/17 and 07/27
Engineering
LINESTRING(-86.53437376081541 39.18467653752353,-86.53439090027071 39.184673585307365,-86.53435852580212 39.184472833547574,-86.53432615122891 39.184441835050194,-86.53436995203592 39.18468096587793)
ROW2025-07-1764
2038 N Walnut
July 17, 2025 to July 27, 2025
Demo and replacement of concrete apron at Walnut Knolls Apartment Private Road.
Engineering
LINESTRING(-86.53430623398091 39.18458981996906,-86.53430176365984 39.18456787476191,-86.53396201713007 39.18460137007702,-86.53366697413841 39.18460830015991,-86.53366548405866 39.18463371036282,-86.53396797761272 39.18462562530067,-86.53430623398091 39.18458866495499)
Best Buddies Friendship Walk
N Fee Lane from McNutt to 17th to gate 2 into Assembly Hall
July 19, 2025 18:00 pm to 21:00 pm
Best Buddies Friendship Walk
Public Works
LINESTRING(-86.51883106575835 39.17641128068652,-86.51883106575835 39.17641128068652,-86.51896071837986 39.17904769405149,-86.52111161139439 39.179031755018315,-86.52111561335973 39.179758028741674)
Milling and Resurfacing on N Clark St
N Clark St from E 3rd St to the Dead End
July 21, 2025 06:00 am to 16:00 pm July 31, 2025
Lane Restrictions and No Parking on N Clark St from E 3rd St to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.50495539940202 39.16430126666427,-86.50499827407235 39.16826530719615,-86.5050304300751 39.170545665833856)
Milling and Resurfacing on N Roosevelt St
N Roosevelt St from E 3rd St to the Dead End
July 21, 2025 06:00 am to 16:00 pm July 31, 2025
Lane Restrictions and No Parking on N Roosevelt St from E 3rd St to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.50604294228792 39.16430394541234,-86.50606513742508 39.16829625874843,-86.50612387208285 39.17065011290077)
Axis Fiber Solutions Lane Closure for Boring Work
113 E 15th St
July 21, 2025 to July 23, 2025
N Walnut and E 15th St, install 88' of UG Fiber Optic Cable by directional bore along/crossing E 15TH St. Fiber to service 1000 N Walnut.
Less than 3 days single lane closure.
Construction Dates 7/21/25 thru 7/23/25.
9 sq ft excavation (bore pit)
No sidewalk repair expected.
External Project
LINESTRING(-86.53309799629378 39.17685863707345,-86.53286518058401 39.17685863707345)
Milling and Resurfacing on N Bryan Ave
N Bryan Ave from E 3rd St to the Dead End
July 21, 2025 06:00 am to 16:00 pm July 24, 2025
Lane Restrictions and No Parking on N Bryan Ave from E 3rd St to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.5082560465271 39.16432293969541,-86.50830352534851 39.16879547120871)
Milling and Resurfacing on E Latimer Rd
E Latimer Rd from S Pleasant Ridge Rd to the Dead End
July 21, 2025 06:00 am to 16:00 pm July 24, 2025
Lane Restrictions and No Parking on E Latimer Rd from S Pleasant Ridge Rd to the Dead End for milling and resurfacing.
Street
LINESTRING(-86.48912386754154 39.156951910220556,-86.48970881721723 39.15697739230416)
CBU will close N Dunn St from E 6th St to E 7th St for scheduled maintenance beginning at 9:00 pm on July 21st.
N Dunn St from E 6th St to E 7th St
July 21, 2025 to July 22, 2025
CBU will close N Dunn St from E 6th St to E 7th St for scheduled maintenance beginning at 9:00 pm on July 21st. Work is expected to be complete by 8:00 am on July 22nd.
Utilities
LINESTRING(-86.52825848377536 39.168535660877836,-86.52826148061699 39.16752728689522)
ROW2025-06-1656
Lane closure on S Morton for one day between 07/21/25 and 07/28/2025
July 21, 2025 to July 28, 2025
-WO 46298852
-229 W 1st St
-Bore new electrical cable underneath S Morton St and the B-Line Trail
-Close southbound lane of S Morton St, close sidewalk on west side of S Morton St.
-Work will take one day between 7/21 and 7/28
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53632911008529 39.159022224881255,-86.53631718911994 39.159022224881255,-86.53632165952288 39.15877380684637,-86.53634103096876 39.15877611772265,-86.53633358040636 39.15902338031532),LINESTRING(-86.53633358040636 39.15902338031532,-86.53633209032661 39.159022224881255))
Phase 1: CBU will close Monroe Street
Monroe Street between W Cottage Grove Ave to W 11th st.
July 21, 2025 to July 25, 2025
Phase 1 of 2: CBU will close Monroe Street between W Cottage Grove Ave to W 11th St. From Monday, July 21st until Friday, July 25th
Utilities
LINESTRING(-86.54710941176188 39.17227321734745,-86.5471441145321 39.17320944704585)
Milling and Resurfacing on N Kinser Pike
N Kinser Pike from W 17th St to W Acuff Rd
July 21, 2025 06:00 am to 18:00 pm August 7, 2025
Lane Restrictions on N Kinser Pike from W 17th St to W Acuff Rd for milling, paving, and pavement markings by Milestone.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53775603795899 39.17911200706018,-86.53772611991631 39.186335854901216),LINESTRING(-86.53769476803018 39.18666589494305,-86.537761765976 39.188268273975126,-86.5377234814356 39.19095846053614,-86.53773305257072 39.192167592758835,-86.53792447527304 39.1925607416988,-86.53831689181278 39.19283520286248,-86.5391208671625 39.193102245128074,-86.54036511472754 39.193525059972984,-86.54093720790893 39.193796146179466,-86.54113820174636 39.19414477972262,-86.5413797231324 39.19526183365028,-86.54199232327954 39.197747053361184,-86.54267148082894 39.200394078750634,-86.54279590558546 39.2007871816613,-86.54301604169312 39.20098002379436,-86.54347545617868 39.20105419370455,-86.54721777000894 39.20101710875926,-86.5472943390898 39.201180282372206,-86.54733262363027 39.20196647719493,-86.54739005044101 39.20552225654913,-86.5474283349815 39.20834586944895))
Milling and Resurfacing on E 4th St
E 4th St from S Union St to S Hillsdale Dr
July 21, 2025 06:00 am to 16:00 pm August 7, 2025
Lane Restrictions and No Parking on E 4th St from S Union St to S Jefferson St, S Roosevelt St to S Clark St, and S Hillsdale Dr to the Dead End for milling and resurfacing.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.50934840870624 39.165590628623164,-86.50716111500469 39.16560989976969),LINESTRING(-86.50600947173001 39.16559705233922,-86.50501524732022 39.16561632348399),LINESTRING(-86.50451813511532 39.165629170910904,-86.50344934387479 39.16584757680894))
Road Closed for Limb Removal
N Dunn St from E 11th St to E 12th St
July 22, 2025 13:30 pm to 16:00 pm
N Dunn St from E 11th St to E 12th St closed for limb removal
Street
LINESTRING(-86.5282928128527 39.17348953471276,-86.52830672127163 39.17435211492452)
Closure for Utility work for Hub 2 Development
181 E 17th ST Bloomington
July 23, 2025 06:00 am to 17:00 pm July 25, 2025
10 sewer laterals to be removed/capped: 2 on Washington 7 on Lincoln, and 1 on 17th. 3-4 day road closure on Washington, 10 day road closure on Lincoln, and 3-4 day lane closure on E17th. Each cut estimated to be 6'x6' =36sqft for a total of 360 sqft of pavement.
External Project
LINESTRING(-86.53202451180326 39.178990427330234,-86.5316511157369 39.17899304676675)
ROW2025-06-1713
Sidewalks, 2 lanes of Atwater Ave and complete closure of Woodlawn Ave
July 23, 2025 to August 5, 2025
-WO 58288534
-Replace underground electric cable and re-frame pole
-Close both lanes of S Woodlawn Ave from Woodlawn Ave/Atwater Ave intersection to parking lot behind 908 E 3rd St. Close part of alleyway behind 818 E 3rd St. Close left turn lane and northern lane of E Atwater Ave. Close sidewalk to the west of S Woodlawn Ave. Close parking spots on either side of the alley behind 818 E 3rd St
-Close for two non-consecutive days between 7/23/25 and 8/5/25
Engineering
LINESTRING(-86.52278276273094 39.16357179988165,-86.52277978257145 39.16354753739449,-86.52264120171778 39.163549848113945,-86.52265014235992 39.16314662765558,-86.52290495221634 39.16315124905731,-86.52290495221634 39.163123520388496,-86.52260692906522 39.16312120965503,-86.52260245866229 39.163578732005675,-86.52278127265119 39.16357179988165)
BSM Group Aerial and Boring Work
2750 E Buttonwood LN
July 24, 2025 to September 24, 2025
UG duct placement by directional bore place 1 - 2" duct and fiber optic cable at a minimum depth of 48". Boring along the roundabout of E Rogers Rd and S Sare Rd approx. 73' ( 24.33 ft²) and Overlash: (OL) existing strand with fiber optic cable. Work is located along S Sare Rd approx. 762'. Sidewalk closure and lane closure work for one 8 hour day. (SEE MOT)
External Project
LINESTRING(-86.4966247027905 39.136051152903576,-86.49652771585767 39.13621289270367,-86.496561661631 39.13655141683512,-86.49657136009306 39.13679590548335,-86.49660045640414 39.137085529349264)
Milling and Paving on W Briarcliff Dr
W Briarcliff Dr from N Valleyview Dr to N Kinser Pike
July 25, 2025 06:00 am to 18:00 pm August 1, 2025
Lane Restrictions on W Briarcliff Dr from N Valleyview Dr to N Kinser Pike for milling and paving by Milestone.
Street
LINESTRING(-86.54644314522234 39.19441844841879,-86.54621234735488 39.19427397655332,-86.54591053475896 39.194212059948626,-86.54116142479374 39.19416390255168)
Banneker Block Party
Elm Street between 7th and 8th
July 25, 2025 13:00 pm to 21:00 pm
Banneker Block Party
Public Works
LINESTRING(-86.54526933567222 39.168672071374715,-86.54524181976373 39.169559683235576)
Milling and Paving on N Valleyview Dr
N Valleyview Dr from W Winding Way to W Briarcliff Dr
July 25, 2025 06:00 am to 18:00 pm August 1, 2025
Lane Restrictions on N Valleyview Dr from W Winding Way to W Briarcliff Dr for milling and paving by Milestone.
Street
LINESTRING(-86.5467145348384 39.19641818702627,-86.54670502381767 39.194855541209165,-86.5466764907555 39.19468600679022,-86.54645773727877 39.1944059055497)
Milling and Paving on W Winding Way
W Winding Way from N Valleyview Dr to N Kinser Pike
July 25, 2025 06:00 am to 18:00 pm August 1, 2025
Lane Restrictions on W Winding Way from N Valleyview Dr to N Kinser Pike for milling and paving by Milestone.
Street
LINESTRING(-86.54669286719817 39.19643263794475,-86.54641406092634 39.19643738674361,-86.5460586595249 39.19649199790726,-86.54570325812347 39.196605968894715,-86.54546428131904 39.19672706286627,-86.545231432125 39.19689801870615,-86.54462173489324 39.19740376063015,-86.54441572339715 39.19756837563358,-86.54425946933273 39.19767997051764,-86.54403581155424 39.19780106263818,-86.54394487935728 39.19784012785678,-86.5436783283062 39.197925604474534,-86.54328309743734 39.19800395794945,-86.54214642571377 39.19817965936343)
Bloomerang! Festival
N/S alley behind Blockhouse Bar/4th
N/S alley behind Blockhous Bar/E/W alley next to The Back Door
July 25, 2025 12:00 pm to 23:59 pm July 26, 2025
A local music fest organized by the Blockhouse Bar, hosted there and at The Back Door.
Public Works
LINESTRING(-86.53426785404965 39.1655815942149,-86.53425795971931 39.164712079215576,-86.53426496630347 39.16510062134407,-86.53485003887792 39.16510033852879)
Eclaras Impact Market
The Trades District ---
Rogers/Makers Way
Madison/10th
Madison/11th
July 26, 2025 08:00 am to 21:30 pm
Eclaras Impact Market - a one-day, open-air community market dedicated to celebrating local small businesses, vintage fashion, and giving back.
Public Works
LINESTRING(-86.53731331373884 39.17319072767833,-86.53731327282532 39.17319071000696,-86.53729669803934 39.17127104945584,-86.53731161887934 39.172221794699226,-86.53850783964631 39.17224593871762)
Road Closure for Water Main repair.
S Eagleson Ave between E 2nd Street and E University Street
July 26, 2025 11:00 am to 18:00 pm
Please be advised that CBU crews have closed S Eagleson Ave between 2nd Street and E University Street due to Water Main Repair. Normal traffic flow is expected to resume by 6:00pm.
Utilities
LINESTRING(-86.5163639798469 39.16103938699129,-86.51637740847592 39.160162673369285)
Curb Ramp Replacement on E Cottage Grove Ave
E Cottage Grove Ave from N Walnut St to N Indiana Ave
July 28, 2025 06:00 am to 18:00 pm August 1, 2025
No Parking posted on E Cottage Grove Ave for curb ramp replacements from N Walnut St to N Indiana Ave. This project will be completed by Groomer Construction.
Street
LINESTRING(-86.5335477114295 39.17254108385555,-86.53100916883487 39.17253549295111,-86.53102359237235 39.17260817467428,-86.52696524602825 39.17255091162883)
Phase 2: CBU will close Monroe Street
Monroe Street between W Cottage Grove Ave to W 10th St.
July 28, 2025 to August 1, 2025
Phase 2 of 2: CBU will close Monroe Street between W Cottage Grove Ave to W 10th St. From Monday, July 28th until Friday, August 1st, 2025
Utilities
LINESTRING(-86.54711534828516 39.172233488627796,-86.54710038430903 39.17141852539942)
AT&T Alley Closure for Boring Work
115 N Dunn St
July 28, 2025 to August 4, 2025
Alley closure in east/west alley adjacent to 115 N Dunn St to BORE 60' OF INNERDUCT FROM P.154-633-BLM. 2'X2' ASPHALT CUT AND RESTORE AND 1'X10' CONCRETE CUT AND RESTORE. NO SIDEWALKS.
THIS WORK IS PLANNED BETWEEN 07/28/2025 TO 08/31/2025 AND WILL TAKE 1-3 DAYS TO COMPLETE.
External Project
LINESTRING(-86.52888107758385 39.16705303587602,-86.52834842731765 39.16704842169216)
S Washington St Closed for Tree Removal
S Washington St from E 1st St to E Wylie St
July 28, 2025 08:00 am to 11:00 am
Road Closed for Tree Removal
Street
LINESTRING(-86.53240939196392 39.159338522318535,-86.53243371815486 39.158376535686386)
CBU Stormwater System Work
N Blair Ave. from W 14th St. to W 11th St.
July 28, 2025 to August 1, 2025
N Blair Ave. Road Closure to Thru Traffic from W14th St. to W 11th St.This temporary closure is necessary to allow CBU crews to safely and efficiently complete upgrades to the stormwater system.
Work is expected to be completed by Friday, August 1, 2025, weather permitting. During this time, CBU crews will coordinate closely with residents in the affected area to minimize disruptions and ensure access to homes is maintained wherever possible.
Utilities
LINESTRING(-86.54378963144663 39.173313387570744,-86.54383405007097 39.17486458703979,-86.54395038456327 39.17505971435966,-86.54408575560886 39.17517941404421,-86.54437341908074 39.17530403267739,-86.54484298739513 39.17550243820341,-86.54520468190755 39.175659850453826,-86.54531890122726 39.17576151234496,-86.54542042951147 39.175905806389636)
ROW2025-07-1777 Lane closure
Western most lane of College AVE
July 29, 2025 to August 1, 2025
Western most Lane of College AVE will be closed for no more than 3 days during this time period
Engineering
LINESTRING(-86.53489920636817 39.16792429237353,-86.53488132492016 39.16788385738195,-86.53488728540285 39.16772327256936,-86.53490814701033 39.167724427892296,-86.53490218652765 39.167923137085666)
CBU Water Main Maintenance
N Dunn St. between E 6th St. and E 7th St.
July 30, 2025 to July 31, 2025
CBU will be closing N Dunn St. between E 6th St. and E 7th St. beginning at 9 p.m. on 7/30/25 to perform water main maintenance. Dunn St. will re-open at 6:00 a.m. on 7/31/2025.
Utilities
LINESTRING(-86.52825858323438 39.168505334101525,-86.52826496984649 39.16754803991924)
Taste of Bloomington
Kirkwood from Walnut to Indiana
Grant from alley south of 6th to 4th
August 1, 2025 08:00 am to 09:00 am August 3, 2025
https://www.visitbloomington.com/taste-of-bloomington/
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53352389053751 39.16659352612018,-86.52701144778602 39.166516098247484),LINESTRING(-86.52979596116955 39.167045353516045,-86.52979596116955 39.167045353516045,-86.52982284365815 39.16561088435492))
Duke Energy Lane Closure
327 S Rogers
August 1, 2025 to November 30, 2025
WO # 41372422, Replacing overhead equipment on pole # 814-4426 at 2721 S Rogers Street. Pole is on the south east side of W Country Club Dr and S Rogers Street intersection. No overnight closure. Work will take 1-2 hours.
Engineering
LINESTRING(-86.53808061040431 39.13602458627568,-86.53789855805192 39.13601957886871)
Duke Energy Overhead Pole Equipment Replacement
2630 S Rogers ST
August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Watson St to replace overhead equipment on on pole # 814-4433 at the north west intersection of W Watson St and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53828638186843 39.13674252324108,-86.53840077414678 39.137766578257924)
Duke Energy Overhead Equipment Replacement
2315 S Rogers ST
August 1, 2025 to November 30, 2025
Single day(1-2 hour) closure of the eastern lane of S Rogers st near W Coolidge Dr to replace overhead equipment on pole # 814-4444 at the North East intersection of W Coolidge Dr and S Rogers St. Closure will occur in the date range of 08/01/2025 to 11/30/2025
Engineering
LINESTRING(-86.53880925088721 39.141523443090136,-86.53875325010075 39.140949302825305)
CBU Sanitary Sewer Upgrades: Phase 1
Intersection of W 2nd St. and S College Ave.
August 3, 2025 to August 4, 2025
Beginning on 8/3/2025 - 8:00 pm, lasting until 8/4/2025 - 6:00 am - CBU Crews will close the entire intersection at S College Ave. and W 2nd St. to perform sewer pipe upgrades before reopening the intersection on 8/4/2025 at 6:00 am.
Utilities
GEOMETRYCOLLECTION(POINT(-86.53494795057422 39.16139345297117),POINT(-86.53494795057422 39.16139345297117))
ROW2025-06-1721
1730 S Walnut ST Bloomington, IN 47403
August 4, 2025 to August 8, 2025
light pole relocation 3 non consecutive days - lane closure, -sidewalk closure with sidewalk detour at crosswalks est date of construction aug 4th through aug 8th
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53301023304512 39.14804658886712,-86.53269329815524 39.14697929778498),LINESTRING(-86.53301448710121 39.14804493929748,-86.53298470800756 39.148051537643795,-86.53266351906159 39.14698589625388,-86.53269329815524 39.14697929778498))
CBU Stormwater System Work
West Gourley Pike from Kinser Pike to N Old St. Rd. 37
August 4, 2025 to August 8, 2025
Beginning Monday, August 4, 2025, W Gourley Pike will be closed to through traffic from Kinser Pike to N. Old St. Rd. 37. This temporary closure is necessary to allow CBU crews to safely and efficiently complete upgrades to the stormwater system.
Utilities
LINESTRING(-86.54379456416629 39.173330010579605,-86.54382210739004 39.17474460413081,-86.54388063674057 39.17493944214482,-86.54398736673268 39.17511292759343,-86.54419738381391 39.17523837065107,-86.54454855991699 39.175377158454154,-86.54507188116861 39.17560135355728,-86.54528534115282 39.17571078185992,-86.5453955140479 39.17584156180308,-86.5454196143687 39.175902948223126)
Milling and Resurfacing on S Washington St
S Washington St from E Kirkwood Ave to E 2nd St
August 4, 2025 06:00 am to 16:00 pm August 7, 2025
Lane Restrictions and No Parking on S Washington St from E Kirkwood Ave to E 2nd St for milling and resurfacing.
Street
LINESTRING(-86.53240896242241 39.1614423633053,-86.53238654495969 39.16282420442553,-86.53236412749699 39.164623164456486,-86.53234171003429 39.166578503612044)
Noth Walnut Street Resurfacing Project
North Walnut Street from the SR 45 Bypass to 400 feet north of N Old 37
August 4, 2025 to November 1, 2025
Curb ramp replacements, curb repair, guardrail repair, removal of excess pavement, and updates to signs and markings.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.53413596165012 39.187444310277726,-86.53313365190616 39.190531291308986,-86.53308089876174 39.19235070668202,-86.53337104105604 39.19394521175926,-86.53519102453852 39.198912476399556,-86.53477445341915 39.20715205510655),LINESTRING(-86.53477445341915 39.20715205510655,-86.53477445341915 39.20718143901232))
Milling and Resurfacing on S Washington St
S Washington St from E 2nd St to E Kirkwood Ave
August 4, 2025 06:00 am to 16:00 pm August 7, 2025
Lane Restrictions and No Parking on S Washington St from E 2nd St to E Kirkwood Ave for milling and resurfacing.
Street
LINESTRING(-86.53238682219599 39.16143265616057,-86.53238682219599 39.162837694250726,-86.53236344018397 39.16461434739793,-86.53235174917796 39.165602364680524,-86.53234005817195 39.16659943227205)
CBU Sanitary Sewer Upgrades: Phase 2
W 2nd St. from the B-Line to S College Ave.
August 4, 2025 to August 7, 2025
Beginning o 8/4/2025 - 6:00 am, lasting until 8/15/2025 - CBU crews will close W 2nd St. from the B-Line to S College Ave. to upgrade the sewer line in that area. During this time Kroger’s and Wendy’s will only be accessible from either S Morton Dr. or S College Ave. CBU expects the road to be paved and re-opened by 8/15/2025
Utilities
LINESTRING(-86.53615659061867 39.16142049961783,-86.53574463206711 39.1614157321512,-86.53559091618966 39.161394278547306,-86.53576000365486 39.16135137131994,-86.53615659061867 39.1613537550555)
CBU Stormwater System Work
Intersection of E 2nd St. and S Woodlawn Ave.
August 4, 2025 to August 15, 2025
Beginning Monday, August 4th, the intersection will be closed to through traffic. This temporary closure is necessary to allow CBU crews to safely and efficiently complete upgrades to the stormwater system. Work is expected to be completed by Friday, August 15th, weather permitting.
Utilities
POINT(-86.52264177461761 39.16108298081974)
QC Communications Boring and Over lashing
489 W 10th St
August 8, 2025 to August 29, 2025
Parking lane closure, travel lane closures, alley closures, and sidewalk closures for UG duct placement by directional bore place 1-2" duct and fiber optic cable at a minimum depth of 48", as well as Overlash (OL) existing strand with fiber optic cable. Work taking place on east side of N Rogers St, under W 10th St, over W Maker Way, over N Madison St, and along and over the north/south alley between W 11th St and 10th St approx 1614' within ROW (see plans).
Lane restrictions and sidewalk closures will progress/move with the work. once the affected portion of the road/sidewalk has been completed, the closure/restriction will be removed. Work will be done road by road and will take approx. 2 - 4 hours each to complete. TA-28 has been added to print for clarity and will be followed for sidewalk closures. sidewalk closed signs placed in advance of closure/s and barricades in place at each point of closure.
External Project
LINESTRING(-86.53861355594984 39.1712831374866,-86.53854442481 39.173255394464945,-86.536684797043 39.173260753803675)
CBU Stormwater System Project
N Browncliff Ln starting at the intersection of E Matlock Rd.
August 11, 2025 to August 15, 2025
Beginning Monday, August 11, 2025, lane restrictions will be in place on N Browncliff Ln. These temporary restrictions are necessary to allow CBU crews to safely and efficiently complete upgrades to the stormwater system.
Utilities
LINESTRING(-86.51789588393392 39.18630007158012,-86.51789588393392 39.18717020579919,-86.51773979740896 39.18774718725598,-86.51779382735991 39.18855681453917,-86.51779382735991 39.18903607227199,-86.51770978076955 39.189431573764864,-86.51786586729452 39.1902132642862,-86.51789588393392 39.19091584775194,-86.51802795714735 39.19131599148699,-86.51831611688574 39.19229772983533,-86.51849021339434 39.19309334658661)
Milling and Resurfacing on S Washington St
S Washington St from E Allen St to E Hillside Dr
August 11, 2025 06:00 am to 16:00 pm August 21, 2025
Lane Restrictions and No Parking on S Washington St from E Allen St to E Hillside Dr for milling and resurfacing.
Street
LINESTRING(-86.53247638706915 39.155580839431735,-86.53247638706912 39.153349352623934,-86.53251229394667 39.151479781568526,-86.5325225530545 39.15058077865356)
Single lane restriction ROW2025-07-1785
2110 E Covenanter- Southbound lane
August 11, 2025 to August 31, 2025
site improvements
Engineering
LINESTRING(-86.50660241886061 39.15365857923126,-86.50661282174558 39.15316649092486)
ROW2025-07-1786-
Left hand turn lane of West bound 3rd street at the intersection of 3rd and S Cory Ln
August 11, 2025 to September 30, 2025
2 day closure between 08/11 and 9/30
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.5601032446852 39.1644747660535,-86.55981817622315 39.16447885909972),LINESTRING(-86.55981993595813 39.16448704515403,-86.55981993595813 39.16448704515403,-86.56010852369675 39.164485680805456),LINESTRING(-86.56010676396181 39.16448158779707,-86.56010676396181 39.16448158779707),LINESTRING(-86.56010148495022 39.1644734017047,-86.55981817622315 39.1644734017047),LINESTRING(-86.55982169559644 39.16448295214573,-86.55982169559644 39.16448295214573,-86.56009796557696 39.164480223448436))
ROW2025-07-1786
S Cory Ln just south of the Intersection of 3rd St and S Cory Ln
August 11, 2025 to September 30, 2025
closure of south bound lane of S Cory Ln just south of the Intersection of 3rd St and S Cory Ln
Engineering
LINESTRING(-86.56016238383741 39.164358149874175,-86.56015642335474 39.16416058599046,-86.56013854190672 39.16416174130839,-86.56014301230967 39.164356994559455,-86.56016536399689 39.164358149874175)
Single lane closure ROW2025-07-1770
West bound lane of E Miller @ 927 E Miller
August 12, 2025 to August 19, 2025
Sidewalk work
Engineering
LINESTRING(-86.52220692888498 39.14689095245541,-86.52158853056811 39.14688864118878)
E Cottage Grove
E Cottage Grove from N Indiana Ave to N Walnut St
August 12, 2025 to August 19, 2025
Lane Restrictions and No Parking for milling and resurfacing.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53357920835064 39.17255487283319,-86.53103065939318 39.17251723938469),LINESTRING(-86.53095784370097 39.17259877842801,-86.52693679954488 39.17256741738112))
HUB 2 Utility Work
205 E 17th St
August 12, 2025 to September 19, 2025
Lane restrictions/intermittent closures of 1300-1400 Block N. Lincoln St 8/12/25 to 9/19/25
Lane restrictions/intermittent closures of 200 Block E. 19th St 8/12/25 to 9/19/25
Lane restrictions/intermittent closures of 1300 Block N. Washington St 8/12/25 to 9/19/25
External Project
LINESTRING(-86.53096426401126 39.17905653840273,-86.53096890982191 39.1803674060865,-86.53093174333677 39.18111646236008,-86.53200492559506 39.18128211795823,-86.53205138370147 39.18074913768476,-86.53221863288458 39.17989564058715)
ROW2025-08-1807 Alley closure- 3 days from 08/12/25-08/15/25
Alley between 400 block of E 10th ST and E Cottage Grove AVE
August 12, 2025 to August 15, 2025
Alley closure to retire gas line in the alley
Engineering
LINESTRING(-86.52908147142588 39.17213709764968,-86.5287637926591 39.17213709764968)
Duke Energy Lane Closure
1906 E Hillside
August 15, 2025 to November 30, 2025
WO # 42544994, Installing new pole # MNI-20164 Along SW corner of E Hillside Drive and S Clifton Avenue. No overnight closure. Work should take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.51099562089976 39.150478094675634,-86.50958383249845 39.15048194971982)
Duke Energy Lane Closure
2106 E 3nd St
August 15, 2025 to October 31, 2025
WO # 42544989, 1 day lane closure for replacing overhead equipment on pole # 167-653 along the east side of S High Street. No overnight closure. Work will take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50841749957901 39.16089752575505,-86.50842587453054 39.16039427112915)
Duke Energy Lane Closure
1805 S Walnut St
August 15, 2025 to November 30, 2025
WO # 4254498, 1 day lane closure on east side of S Walnut St for removing electronic relcoser on pole # 151-134 along east side of S Walnut Street. No overnight closure. Work will be completed in 1 day, but please allow for up to 3 days in case of inclement weather.
External Project
LINESTRING(-86.5328782092761 39.14779840114201,-86.53267163959732 39.147125562490004)
Duke Energy Lane Restriction
2425 S Rogers
August 15, 2025 to September 30, 2025
WO 40995878, Replacing overhead equipment (Crossarm, clevises, and pin insulators) on pole # 814-4442. Lane restriction will take place on East side of S Rogers street, and traffic flagging will take place for Northbound traffic on S Rogers Street. Work should take only 1 day, but please allow for 3 days in case of inclement weather. No overnight closure. Work will be completed using a bucket truck.
External Project
LINESTRING(-86.53866188574906 39.14009151380523,-86.53867636140362 39.14029111289918)
Road Closure for Street Patching
400 E 7th St
August 15, 2025
45 minute road closure for E&B PAving to restore asphalt disturbed during utility work. This work is scheduled for noon on 8/15/25 and will only be in place for 45 minutes.
External Project
LINESTRING(-86.52827469077424 39.16815200313863,-86.52827266094775 39.16790807678086)
HUB 2 Utility Work
205 E 17th St
August 15, 2025 to August 16, 2025
Replacement of street, sewer, storm and water within the ROW within the 4 block area of 17th, Lincoln, 19th and Washington Street per approved drawings.
External Project
LINESTRING(-86.53217791643841 39.178980204358055,-86.53194585573276 39.178980204358055)
CBU Stormwater System Work
E Hunter Ave from S Eastside Dr to S Rose Ave
August 18, 2025 to August 22, 2025
Beginning Monday, August 18, 2025, lane restrictions will be in place on E Hunter Ave from S Eastside Dr. to S Rose Ave. These temporary restrictions are necessary to allow CBU crews to safely and efficiently complete upgrades to the stormwater system. Work is expected to be completed by Friday, August 22, 2025, weather permitting.
Utilities
LINESTRING(-86.51318617086167 39.16218086593909,-86.51093122455227 39.162233985666916)
Lineal Boring Work
1601 W 3rd St
August 18, 2025 to August 20, 2025
2-3 days of Lane closures on the southern lane on W 3rd St and Westplex Ave to bore from pole #125 along 3rd st down s westplex ave. going to 1555 w 3rd st total of 500' also setting 1 3'x 4' hand hole. 4-bore pits 3' x 4' in grass. A057ZZ3
External Project
LINESTRING(-86.55429590107563 39.16438620030212,-86.55389401205257 39.16438088894668,-86.55389629551293 39.163869226491954)
Milling and Resurfacing on S Lincoln St
S Lincoln St from E Hillside Dr to E 1st St
August 18, 2025 06:00 am to 16:00 pm August 28, 2025
Lane Restrictions and No Parking on S Lincoln St from E Hillside Dr to E 1st St for milling and resurfacing.
Street
LINESTRING(-86.53137237105567 39.15056737984531,-86.5313460623735 39.15249331234952,-86.53133027716422 39.154207021531164,-86.53131975369133 39.156471501793874,-86.5312829215363 39.158429912439914,-86.53128292153627 39.15932341918776)
Road Closed for Tree Removal
E 12th St from N Walnut St to N Washington St
August 19, 2025 07:00 am to 15:00 pm
E 12th St from N Walnut St to N Washington St closed for tree removal.
Street
LINESTRING(-86.53354177704576 39.17442791227762,-86.53232489697366 39.174410837928434)
ROW2025-08-1856
unnamed street east of Mellencamp Pavilion
August 19, 2025 to August 26, 2025
IU is working on HVAC- detour signs on Fee Lane
Engineering
LINESTRING(-86.52353801238925 39.183771032232556,-86.52350976350446 39.18360315869654,-86.52350034686471 39.183369595093154,-86.52351917962697 39.18309953608397,-86.52355684515152 39.182887867459556,-86.52359451067606 39.18272729098172,-86.52360392679859 39.182603208642405,-86.52352859626674 39.18236234271242)
2025 Pridefest
Kirkwood from Walnut to Indiana and Grant from 6th to 4th
August 22, 2025 to August 25, 2025
Kirkwood from Walnut to Indiana will be closed Fri 8/22 to Mon 8/25; Grant from 6th to 4th will be closed Sat 8/23 to Sun 8/24
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53353126260923 39.16657695693203,-86.52700345373799 39.16654312869193),LINESTRING(-86.52979149754196 39.1675055271258,-86.52979150267629 39.167505533693884,-86.52981778367662 39.165569357852746))
IU Summer Fire Fest
7th from Indiana to Woodlawn
August 23, 2025 16:00 pm to 02:00 am August 24, 2025
IU Summer Fire Fest
Public Works
LINESTRING(-86.52687590859625 39.168539086631085,-86.52348322711453 39.16848747698887)
ROW2025-07-1734
2515 S Rogers ST
August 25, 2025 to September 9, 2025
-WO 57889070
-2515 S Rogers St
-Relocate overhead service line
-Close northbound lane of S Rogers St, close sidewalk on east side of S Rogers St. Pedestrian crossing signs will be located at Rogers St X Graham Dr and Rogers St X W Ralston Dr
-Work will take two days within 8/25/25-9/9/25
Engineering
LINESTRING(-86.53855791273037 39.139102711048764,-86.53858373275855 39.1391011705515,-86.53855989894515 39.13889012278341,-86.53853606502264 39.138891663243015,-86.53855989894515 39.139102711048764)
Duke 1-2 day closure of W Dodds alleyway
508 W Dodds St
August 27, 2025 to October 27, 2025
WO # 52851282. 1-2 Day closure of the alleyway between W Dodds St and W Wylie St adjacent to 508 W Dodds St occuring between 08/27/25 and 10/27/25. Replacing overhead equipment on 5 poles. No overnight closure.
Engineering
LINESTRING(-86.53916814455523 39.15834416747677,-86.5391746804617 39.157511335215474)
4th Street Festival
See Map.
August 29, 2025 08:00 am to 21:00 pm August 31, 2025
4th Street Festival (www.4thstreet.org/)
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52698882126573 39.16556256106915,-86.5281776458734 39.165556308782186),LINESTRING(-86.52834270241577 39.16554872622061,-86.52977061880284 39.165565221616646),LINESTRING(-86.52988526046576 39.1655605878297,-86.53043584928534 39.165572937203734),LINESTRING(-86.5298226064664 39.166058130643535,-86.5298226064664 39.166058130643535,-86.52983032740653 39.165543227754455),LINESTRING(-86.52833017733512 39.16593346258833,-86.52881734006131 39.16593656654402,-86.52882521288477 39.16575545951105,-86.52833090870965 39.16575179231177),LINESTRING(-86.52979538021168 39.166535105865705,-86.52980537164989 39.1661312931422))
Milling and Resurfacing on E Cottage Grove Ave
E Cottage Grove Ave from N Walnut St to N Indiana Ave
September 1, 2025 06:00 am to 16:00 pm September 11, 2025
Lane Restrictions and No Parking on E Cottage Grove Ave from N Walnut St to N Indiana Ave for milling and resurfacing.
Street
LINESTRING(-86.53355891581029 39.17255247617757,-86.53100970171886 39.17253640893165,-86.53100970171886 39.17261674512443,-86.52701662381953 39.17255247617757)
ROW2025-07-1768
Southbound lane of Fountain at 2110 W Fountain DR
September 4, 2025 to September 19, 2025
-Install transformer and overhead wire
-Close southbound lane of W Fountain Dr
-Work to take two days between 9/4 and 9/19
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.55573107213827 39.17392380223646,-86.55553189055134 39.1736906699505),LINESTRING(-86.5557076391366 39.173929857629645,-86.5557076391366 39.173929857629645,-86.55550845733512 39.17369975298706),LINESTRING(-86.55551626840719 39.17369369757404,-86.55551626840719 39.17369369757404,-86.55571545020867 39.17392077453965))
Crown Castle Small Cell Tower Work
1314 N Eagleson Ave
September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167
Location: In the ROW at the corner of E 17th St and the private driveway.
Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day.
Expected date and/or duration: 9/8/2025-3/8/2026
Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
Duke Energy Alleyway Closure
409 S Walnut St
September 15, 2025 to November 30, 2025
WO # 42544967, Replacing pole # 152-907 in alleyway south of E Smith Avenue and West of S Walnut Street. No overnight closure. Work should only take 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.5330249133644 39.16281129906935,-86.53303560824078 39.16251775024534)
Duke Energy Lane Closure
2610 E Moores Pk
September 15, 2025 to November 30, 2025
WO # 42544965, lane closure on Installing new pole # MNI-12564 along S Side of E Moores Pike. No overnight closure. Work should be completed in 1 day, but please allow for 3 days in case of inclement weather.
External Project
LINESTRING(-86.50022933682921 39.15039648044831,-86.49959141682783 39.1504250995699)
Duke Energy Pole Work
612 E Atwater Dr
September 15, 2025 to October 31, 2025
WO #45028886, 1-2 lane closure in the eastbound lane of Atwater Ave to replace overhead equipment on pole # 177-201 and installing new pole # MNI-12665.
External Project
LINESTRING(-86.52719319904327 39.16316640666511,-86.52591646755216 39.16315392874915)
Witch Fest
6th St between Walnut and College
September 20, 2025 06:00 am to 22:00 pm
Witch Fest (www.oak-bloomington.com/)
Public Works
LINESTRING(-86.53478286003151 39.16758286551067,-86.53370063060353 39.16756921864689)
W Bloomfield Road Closure
In front of Twin Lakes Recreation Center on West Bloomfield Rd, Bewteen S Weimer Road and Cory Lane
December 24, 2025 20:30 pm to 06:00 am December 25, 2025
This road is closed due to a water main break.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.56373601977991 39.15462115818508,-86.55970582368633 39.15711781001096),LINESTRING(-86.55972069525863 39.15711781001096,-86.55969095211405 39.15711204417349))