Allen St. Bridge
Bridge between S Morton and S Walnut (150-156 W Allen St)
January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
Bloomington Convention Center Site Preparation
302 S Walnut st
June 27, 2025 to January 26, 2026
This request is to accommodate site work necessary for the Bloomington Convention Center Project. The traffic controls would be in place from June 27th, 2025 through January 23rd, 2026. Other permits for various closure needs are also expected between phase completions.
External Project
LINESTRING(-86.53447106427768 39.16454766952046,-86.53368078602708 39.16453847855911)
Crown Castle Small Cell Tower Work
1314 N Eagleson Ave
September 8, 2025 to March 8, 2026
SC-IN E 17th St 523288_0167
Location: In the ROW at the corner of E 17th St and the private driveway.
Type of Work: Replace existing 33'-6" AGL metal pole with new 39'-1" AGLE (38'-9" total) Valmont metal pole, installing new telecommunications equipment. See attached drawing for more details and scope of work.
Extent of closure: Partial lane closure, partial sidewalk closure. See page 19 of submitted drawing. Areas will be reopened for the evening once the crew completes for the day.
Expected date and/or duration: 9/8/2025-3/8/2026
Work is expected to take about 3 days to complete.
External Project
LINESTRING(-86.51215945787904 39.178809908271745,-86.51141249889902 39.17880550505484)
ROW2025-10-2024
East-West alley North of 205 E Kirkwood AVE
November 8, 2025 to January 16, 2026
Alley closure for loading and unloading- along with parking spots.
Engineering
LINESTRING(-86.53223709950697 39.167079291184734,-86.5322385299966 39.16705156403265,-86.53173928141558 39.167052673070714,-86.53174071190521 39.167083727525466,-86.53223996040441 39.16708261845619)
Poplars Redevelopment
400 E 7th St
November 22, 2025 to March 2, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52971250992954 39.16849483132833,-86.5288075170272 39.16849314470889,-86.52871179662408 39.1684779651323,-86.52855733870085 39.16847627851246,-86.5284289863421 39.168498204567044,-86.5283463187212 39.168498204567044)
Poplars Redevelopment
400 E 7th St
November 22, 2025 to June 18, 2026
Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement.
This phase includes:
Single day closure on the east side of Grant for scaffolding installation (11/13/25) and single day (TBD) for removal.
Bike lane closure from 11/22/25 to 3/2/26.
Closures of the southern sidewalk along E 7th and the east/west alley on the southern side of the property from 11/22/25 to June 18th, 2026.
External Project
LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)
ROW2025-09-1931
1610 E 3rd
January 2, 2026 to February 6, 2026
Lane closure for pole replacement
Engineering
LINESTRING(-86.5137607787289 39.16425310830547,-86.5137607787289 39.16423092570608,-86.51348469005248 39.16422981659181,-86.51348612054214 39.16425310830547,-86.51376220930038 39.16425310830547)
ROW2025-11-2102
1104 N Grant
January 7, 2026 to January 21, 2026
3 days of alley closure for DUKE
Engineering
LINESTRING(-86.5296685355435 39.177331694811414,-86.52967032365555 39.17730674400346,-86.52937170443981 39.177313674805475,-86.52911242418045 39.17731228867055,-86.52911055456362 39.177338625611014,-86.52939844494331 39.17734139794334,-86.52966845403873 39.177331694811414)
ROW2025-10-2022
2744 S Pinehurst DR
January 12, 2026 to February 17, 2026
Closure of southbound lane of S Pinehurst for one day between 01/12/2026 and 01/26/2026 and one day on 02/17/2026
Engineering
LINESTRING(-86.54999546989382 39.13680207219903,-86.54997615811988 39.13680456877418,-86.54997776737979 39.13646753807697,-86.54999868865923 39.13647003450524,-86.54999546989382 39.13680207219903)
ROW2025-12-2177 and 2176
300 block of N Jefferson
January 14, 2026 to January 23, 2026
Lane restriction for utility connection
Engineering
LINESTRING(-86.50715073959017 39.16883136049549,-86.50716746369389 39.16883280117318,-86.50716374728307 39.16855907393182,-86.50713959018772 39.16855763328155,-86.5071488813848 39.16883136049549)
ROW2026-01-2192
1318 W 6th
January 15, 2026 to January 19, 2026
Work on gas line
Engineering
LINESTRING(-86.55093548126331 39.16767853655176,-86.5509372692935 39.167660514072,-86.55075845546833 39.167656355032676,-86.55075845546833 39.167677150226865,-86.55093905748741 39.16767992287666)
COMMERCIAL SERVICE
200 W 6TH ST
January 19, 2026
Meters: 200A&B, 202A&B, 204A&B, 200LZ, 206A&B, 208A
Public Works
GEOMETRYCOLLECTION(POINT(-86.5350353882208 39.167589370477714),LINESTRING(-86.53503416907955 39.167589370477714,-86.53507440221478 39.167590315711976))
ROW2026-01-2228
607 W Dodds
January 21, 2026 to January 23, 2026
Repair work
Engineering
LINESTRING(-86.54060186762071 39.157527017971745,-86.54060370797805 39.15749276856215,-86.54055033685763 39.15749276856215,-86.54054665605875 39.15752559086977,-86.54060186762071 39.157528445008296)
New Pole Placement for Crown Castle. Single Lane Closure.
Cottage Grove
January 22, 2026
New Pole Placement for Crown Castle. Single Lane Closure, one day only
Engineering
LINESTRING(-86.52303727014151 39.172479550759505,-86.52341808382896 39.172479550759505)
Unscheduled Road Closing -E University St and S Lincoln St
E University St closed between S Grant & S Lincoln.
S Lincoln St closed between E 1st & E 2nd .
January 22, 2026
Both Lanes of E University St closed between S Grant & S Lincoln.
S Lincoln St closed between E 1st & E 2nd Until 2pm today, 1/22/26.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53126855292976 39.159379019626044,-86.53125470869695 39.15938438698217),LINESTRING(-86.53126855292976 39.16128440532481,-86.53125470869695 39.16042564632741,-86.53126855292976 39.159379019626044),LINESTRING(-86.53125470869695 39.159379019626044,-86.53124086446414 39.15938975433792,-86.53124778658054 39.16044711543012),LINESTRING(-86.53124778658054 39.160457849979025,-86.5298979738808 39.16043638087959))
ROW2025-11-2135
Indiana AVE from Cottage Grove to 13th
January 24, 2026 to February 19, 2026
Closures on Indiana Ave for work on poles
Engineering
LINESTRING(-86.52693332190438 39.172647363872784,-86.5269547795765 39.17339177516254,-86.52695299154631 39.173440293305134,-86.5269470823199 39.17387264720841,-86.52694350609578 39.1743342582989,-86.52695244673798 39.174963597001295,-86.52698820947028 39.174962210819984,-86.5269917856125 39.17353228770159,-86.5269917856125 39.173390892032586,-86.5269703279404 39.172642321988945,-86.52693277701418 39.17264370821596)
ROW2026-01-2204
717 S Henderson
January 26, 2026 to February 9, 2026
Alley closures for electric work
Engineering
LINESTRING(-86.52651812657633 39.15992603556103,-86.52651812657633 39.15980125055415,-86.52664150819105 39.159802637066036,-86.52663971999712 39.15977213398895,-86.52651991460655 39.15977352053315,-86.52651991460655 39.15969587636536,-86.52648594006817 39.15969587636536,-86.52648594006817 39.15977629352619,-86.52636792287151 39.15977213398895,-86.52637149909563 39.159802637066036,-86.52648772809836 39.159802637066036,-86.52648772809836 39.15992326257387,-86.52651633838244 39.15992326257387)
Bloomington Convention Center Skywalk Installation
302 S College Ave
January 26, 2026 to February 9, 2026
Phase 2:
Sidewalk and road closures on S College, south of 3rd St as part of the project located at location. This request is to accommodate installation of the connector or “skybridge” . The traffic control would be in place from January 26th, 2026 through February 12, 2026 with a detour for vehicular traffic to Rogers St and a pedestrian detour to Walnut St and 2nd St
Phase 3:
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53488292459176 39.1635679969427,-86.53488292459176 39.164478104245234)
Construction for 115 E Kirkwood Lofts
115 E Kirkwood Ave
January 28, 2026 to July 28, 2027
Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north–south and east–west alleys surrounding 115 E Kirkwood, the east–west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.
External Project
LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)
Utilities department closes E19th Street
East 19th Street between N Walnut and N Lincoln St
January 28, 2026 00:00 am to 08:00 am
Due to a main break on E 19th Street the Utilities Department will close E 19th Street between N Walnut and N Lincoln Streets until 8:00am on 1/28/26
Utilities
LINESTRING(-86.53369933654045 39.181484903256234,-86.53239416625867 39.18134525987654,-86.53096031721674 39.181125819719426)
ROW2025-11-2138
1000 S. Ballantine Rd
January 29, 2026 to February 20, 2026
Duke- pole work and boring
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.51909622323824 39.16421599146372,-86.51911946910427 39.16421876428171,-86.51911946910427 39.164048235091514,-86.51908728259612 39.164048235091514,-86.51909443504434 39.16421737785686),LINESTRING(-86.51906403673007 39.164236614328445,-86.51906224869985 39.16421304526719,-86.51878508715622 39.164215818117015,-86.5187859811713 39.1642435464187,-86.51906314271496 39.1642435464187))
ROW2025-10-2011
W 11th from W Fountain Dr. to N. Adams St.
January 29, 2026 to April 24, 2026
This phase will include BPW approved lane restrictions and Sidewalk closure that MUST have PROWAG compliant detours.
Engineering
LINESTRING(-86.54710876730049 39.173215181881346,-86.54710876730049 39.173233202937695,-86.54420253038924 39.173262635244384,-86.54420469939133 39.17323104706969,-86.54710863773936 39.1732130260128)
East Marilyn Drive closed
E Marilyn Drive Between S High St and S Nancy St
January 30, 2026 04:17 am to 07:00 am
Please be advised that CBU crews have closed E Marilyn Drive between S Nancy Street and S High Street due to Water service line repair. Normal traffic flow is expected to resume at 7 am. Road signs are in place. inRoads will be updated to reflect this closure. Please contact the Utilities office at 812-339-1444 with any questions.
Utilities
LINESTRING(-86.51105799780815 39.15361445521984,-86.5084550694311 39.153610232520464)
ATT Manhole Access
East bound lane of 10th St on the west side of the Woodlawn intersection
February 2, 2026 08:00 am to 12:00 pm
East Bound 10th Street Lane closure at the Woodlawn intersection to access ATT Manhole. Uniform Officer will be present to direct the intersection as needed.
Engineering
LINESTRING(-86.52368464590847 39.171635713971654,-86.52352773668109 39.171636753672715)
ROW PERMIT - Boring Project
South bound Washington,
West bound 7th st,
North bound Lincoln
February 2, 2026 to February 6, 2026
Crown Castle Telecom ROW Permit for boring. Work expected to take 3-5 days and begins on 2/2/2026 and location will shift along path as work is performed.
Engineering
LINESTRING(-86.53234201154511 39.169025376475275,-86.53234396778385 39.16859161477899,-86.53243395476544 39.16858706481696,-86.53104111278908 39.16857493158338,-86.5310430690278 39.168649247606)
ROW2026-01-2237
120 W 7th
February 2, 2026 08:00 am to 09:30 am
Alley closure for chiller
Engineering
LINESTRING(-86.53424887332544 39.16906610944514,-86.53424887332544 39.16903838310802,-86.53451709422693 39.16904115570415,-86.53451530603301 39.1690688821036,-86.53424887332544 39.169067495806104)
ROW2025-09-1983
Banneker CC.
February 2, 2026 to February 23, 2026
Full Closure of W 7th
Engineering
LINESTRING(-86.54524698146696 39.16865761066893,-86.54524698146696 39.16862017983675,-86.54495015028142 39.168618793498666,-86.54495015028142 39.168656224331585,-86.54524519335493 39.168656224331585)
ROW2026-01-2233
314 S Walnut
February 5, 2026 to February 8, 2026
Single lane closure for work associated with the convention center.
Sidewalk will have a ramp that is PROWAG compliant.
Engineering
LINESTRING(-86.53368462547418 39.16415688435393,-86.53364886266003 39.16415688435393,-86.53365065077209 39.163939216747394,-86.5336882016983 39.16386850930451,-86.53368641358625 39.1641541115018)
Duke Energy Conduit Boring
1210 W Arlington RD
February 6, 2026 to February 18, 2026
-Install pole on the west side of W Arlington Rd, bore in cable in conduit under W Arlington Rd.
-Close south bound lane of W Arlington Rd. Use guided pedestrian walk through on sidewalk on the west side of W Arlington Rd
-Work will take two non-consecutive days between 1/13-1/30 and one day between 2/3-2/17.
External Project
LINESTRING(-86.5490983958452 39.18080347665267,-86.54864046606082 39.180194958969196)
CBU - Service Line Maintenance
Section of S Walnut St Pike
February 10, 2026 09:00 am to 14:30 pm
City of Bloomington Utilities will complete water service line maintenance at 4155 S Walnut St Pike beginning at 9:00 a.m. on Tuesday, February 10th. This work will require a temporary road closure while crews are in the roadway. The project is expected to be completed by approximately 2:30 p.m. If work extends beyond that time, a lane restriction will remain in place through the afternoon.
Utilities
LINESTRING(-86.52661181921927 39.1193965173953,-86.52660518998555 39.11886419652936)
unpermitted closure
524 N Fairview St.
February 10, 2026 to February 11, 2026
sewer repair,
working to improve closure with contractor
Engineering
LINESTRING(-86.54083880305284 39.170462217688936,-86.54084123179571 39.17042832283576,-86.54057162488158 39.170422673692,-86.54056433820821 39.17046786682951,-86.54084123179571 39.170471632951745)
Unpermitted closure
524 N Fairview
February 10, 2026 to February 11, 2026
unpermitted closure
working with contractor to improve
Engineering
LINESTRING(-86.54105018665753 39.170489713043764,-86.54046796820997 39.170486357060156)
ROW2026-12-2174
416 N Jefferson St.
February 12, 2026 to February 13, 2026
lane closure for water connection
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50716542147703 39.170241727358956,-86.50719550500973 39.17024352139964,-86.5071908768554 39.17008026104463),LINESTRING(-86.50718856267233 39.17008205508941,-86.50716310750583 39.17008205508941,-86.50716773566013 39.170241727358956))
ROW2026-02-2257
1310 N Maple
February 12, 2026 to February 13, 2026
sewer line work
Engineering
LINESTRING(-86.54203053166678 39.17836740072633,-86.54205020130868 39.178368786903945,-86.5420537775328 39.17820245047059,-86.54203231986068 39.17820106428968,-86.54203231986068 39.178368786903945)
CBU - Service Line Maintenance
Near 3116 S Rogers St.
February 13, 2026 09:00 am to 11:00 am
Beginning at 9:00 a.m. on Friday, February 13, CBU crews will implement a northbound lane restriction near 3116 S Rogers Street.
The lane restriction is expected to be lifted no later than 11:00 a.m. Motorists may experience minor delays and are encouraged to plan their routes accordingly.
Utilities
LINESTRING(-86.53863341942639 39.12976314791703,-86.53858340814817 39.130789906380016)
Fiber Project Lane Closures
Intersection of 10th and Woodlawn.
SB Woodlawn & EB 10th street
February 13, 2026 to February 18, 2026
This project will follow a route from the NW corner of 10th and Woodlawn, north to Cottage Grove and then east along Cottage Grove over the course of 4 days
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52366726255647 39.171673981891814,-86.52350633001558 39.171673981891814),LINESTRING(-86.52350498891107 39.171676061292715,-86.52351839995615 39.17248754280101),LINESTRING(-86.52351839995615 39.172485463424096,-86.52351839995615 39.172485463424096))
Bloomington Convention Center Project Lane Restriction
302 S College Ave
February 13, 2026 to June 26, 2026
Immediately following phase 2 completion, a lane closure of the eastern southbound lane of College Ave is being requested. This request is to accommodate placement of pedestrian diversion for curb and sidewalk demolition and reconstruction. The traffic control would be in place from February 13th, 2026 through June 26th, 2026
External Project
LINESTRING(-86.53487655624961 39.164488185161105,-86.53489244558577 39.16354881125994)
ROW2026-01-2241
238 N Morton
February 16, 2026
SIngle lane closure with flaggers of southbound lane of Morton south of 7th.
Engineering
LINESTRING(-86.53616061684812 39.16849238128103,-86.5361373709821 39.16849238128103,-86.53614094736993 39.16837592946413,-86.53615882865422 39.16837592946413,-86.5361552524301 39.16849238128103)
Fiber Optic Boring Project
One block of WB Cottage Grove between Woodlawn Ave and Forrest Ave
February 17, 2026 to February 18, 2026
Full Closure of single lane one way Cottage Grove for the purpose of fiber boring and cell equipment installation on new wooden pole.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52344847258526 39.17251035429655,-86.52262207139907 39.17249976478223),LINESTRING(-86.52261524163721 39.17250505953959,-86.52261865651815 39.172497117403424),LINESTRING(-86.52262548628 39.172497117403424,-86.52262890116096 39.17250241216095))
ROW2026-01-2202
601 N Adams St.
February 17, 2026 to March 3, 2026
Single lane closure with flaggers.
Work will take 2 days between 2/17-03/03
Engineering
LINESTRING(-86.54978463784313 39.17110029169535,-86.54975423952887 39.1710697935807,-86.54973814627478 39.17093948317293,-86.54977748531304 39.17093948317293,-86.5497882141491 39.17110029169535)
ROW2026-02-2248
815 N College Ave.
February 18, 2026 to February 20, 2026
Single lane closure for utility work- will be closed for one day within listed window.
Engineering
LINESTRING(-86.5348327592497 39.17480026168056,-86.53479699651739 39.17479887549604,-86.53479699651739 39.1745840132653,-86.53483633547381 39.1745840132653,-86.5348345474436 39.17479748927977)
Wells & Wells Crane Repositioning
1325 N Lincoln
February 18, 2026
Single day lane/road closure on N Lincoln between E 17th and E 18th St to reposition crane at the HUB II Site.
External Project
LINESTRING(-86.53096945523517 39.18032266083236,-86.53097567755705 39.1793483465936)
Road Closed for Tree Removal
E 12th St between N Washington St and N Lincoln St
February 19, 2026 08:00 am to 12:00 pm
E 12th St between N Washington St and N Lincoln St will be closed from approximately 8am to 12pm.
Street
LINESTRING(-86.53229579601589 39.17441205280116,-86.53101540574157 39.17440143683575)
ROW2026-02-2269
702 E 3rd St.
February 19, 2026
Single lane closure
Engineering
LINESTRING(-86.52585961079781 39.1636150495637,-86.52589537353012 39.16361643600041,-86.52589537353012 39.1635346368227,-86.52585961079781 39.16353325035266,-86.52586139882801 39.16361643600041)
CBU road closure - E 2nd St
E 2nd St. between Woodlawn Ave and 908 2nd St.
February 20, 2026
Please be advised that CBU crews have closed E 2nd St. between Woodlawn Ave and 908 E 2nd St. due to a Tree Hanging from Powerline. Normal traffic flow is expected to resume at end of day. Road signs are in place.
Utilities
LINESTRING(-86.52259213142896 39.161092379635676,-86.52210384303693 39.16108832315672)
ROW2026-02-2276
1171 Briarcliff Dr.
February 23, 2026 to February 25, 2026
Single lane closure
Engineering
LINESTRING(-86.54657532308862 39.19433837792073,-86.54656101794659 39.19432590553603,-86.54663790791108 39.194260771946176,-86.54665221305311 39.194269086877256,-86.54657174678266 39.19433699208972)
Road Closed for Tree Removal
E University St between S Fess Ave and S Park Ave
February 23, 2026 08:00 am to 10:00 am
E University St between S Fess Ave and S Park Ave will be closed for a tree removal.
Street
LINESTRING(-86.52592798448232 39.160389404752664,-86.52406238599174 39.16036715013246)
CBU - Water Valve Installation
Intersection of W 1st St and S Walker St.
February 23, 2026 to February 24, 2026
The intersection of West First Street and South Walker Street will be closed to through traffic to allow crews to safely complete a water valve installation. The intersection closure is expected to remain in place through Tuesday, February 24, weather permitting. During construction, CBU crews will work to minimize disruptions and maintain access for nearby residents and properties.
Utilities
POINT(-86.54598372895262 39.15947666324138)
CBU - Water Valve Installation
Intersection of W 1st St and S Walker St.
February 23, 2026 to February 24, 2026
The intersection of West First Street and South Walker Street will be closed to through traffic to allow crews to safely complete a water valve installation. The intersection closure is expected to remain in place through Tuesday, February 24, weather permitting. During construction, CBU crews will work to minimize disruptions and maintain access for nearby residents and properties.
Utilities
POINT(-86.54598372895262 39.15947666324138)
CBU - Water Valve Installation
Intersection of W 1st St and S Walker St.
February 23, 2026 to February 24, 2026
The intersection of West First Street and South Walker Street will be closed to through traffic to allow crews to safely complete a water valve installation. The intersection closure is expected to remain in place through Tuesday, February 24, weather permitting. During construction, CBU crews will work to minimize disruptions and maintain access for nearby residents and properties.
Utilities
POINT(-86.54598372895262 39.15947666324138)
Poplar Redevelopment
400 E 7th St
February 23, 2026 to July 27, 2026
Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east/west alley between E 6th Street and E 7th Street.
The requested closures are to accommodate completion of exterior façade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street.
Traffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop
External Project
LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)
CBU - Water Valve Repair
Intersection of W Bloomfield Road and S Rolling Ridge Way
February 25, 2026 23:00 pm to 06:00 am February 26, 2026
City of Bloomington Utilities (CBU) has scheduled repairs to address a leaking water valve at the intersection of W Bloomfield Road and Rolling Ridge Way. A temporary lane restriction will be in place while crews complete the project.
Work will begin at 11:00 p.m. on Wednesday, February 25, and is expected to conclude by 6:00 a.m. on Thursday, February 26. During this time, motorists may experience minor delays and are encouraged to plan alternate routes when possible.
Utilities
LINESTRING(-86.56292412935423 39.1551902076055,-86.56346164313132 39.15483355578468)
Centerpoint Sewer Locate Work
1011 W 2nd St
February 25, 2026 to March 3, 2026
Travel lane closure from 2/25/26 to 3/3/26 of the west bound lane of W 2nd St to locate sewers from Walker to Madison.
This will be a moving lane closure with flaggers. The closure will be in the west bound lanes to allow access to the sanitary sewer manholes.
601 W 2nd St through 1011 W 2nd St.
Engineering
LINESTRING(-86.54602317210274 39.16146771965131,-86.53643317380734 39.16142513206185)
February 26, 2026
METER 204A&B
Public Works
GEOMETRYCOLLECTION(POINT(-86.53355805106635 39.168097461436304),LINESTRING(-86.5335569541622 39.168097461436304,-86.53355805106635 39.16811361978279))
ROW2026-02-2279
3627 E Longview Ave
February 28, 2026 to March 7, 2026
Single lane restriction
Engineering
LINESTRING(-86.48612195454807 39.167226749820856,-86.48611301390591 39.1672087272253,-86.48585194561637 39.16718793189261,-86.48582512352623 39.16720456815929,-86.48612016651785 39.16722813615465)
Arlington Multifamily Project Lane Closures
1210 W Arlington Rd
March 2, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.
Mayer Najem has supplied maintenance of traffic plans for all work. As a condition of the issuance of the ROW permit they will also be required to post signage notifying the public about the lane shifts at least 3 weeks prior to closure implementation.
External Project
LINESTRING(-86.547514919906 39.17939904581016,-86.54805384529433 39.179662415790176,-86.54835845521869 39.179889457965004,-86.54879193846948 39.1802981323784,-86.5490848327994 39.18073404869537,-86.54922542261407 39.180897515881156)
ROW2026-02-2308
2506 W 3rd St.
March 2, 2026
Short term - Single lane closure - center lane
Engineering
LINESTRING(-86.56897067605634 39.164598570447566,-86.56896888786244 39.16458054717859,-86.56886696391987 39.164577774343144,-86.56886696408358 39.16459718406193,-86.56896709983224 39.164598570447566)
ROW2026-02-2301
717 S Henderson
March 5, 2026 to March 6, 2026
Single lane closure with flaggers
Engineering
LINESTRING(-86.52713000753313 39.159771840406364,-86.52715682962328 39.159741337347725,-86.52715504142935 39.15964428209605,-86.52712285492119 39.15961516549763,-86.52713000753313 39.159769067381376)
ROW2026-02-2316
524 N Fairview
March 5, 2026 to March 9, 2026
Road closure and sidewalk closure with detour less than 1 day between 03/05 and 03/09
Engineering
LINESTRING(-86.54090002180746 39.1704714100743,-86.54090002180746 39.17043398020749,-86.54056385150177 39.17042566245658,-86.54056563969569 39.17046170602612,-86.54090538622548 39.1704714100743)
High St Multi-Use Path Tree Clearing
S High St between Moores Pike and 2nd St
March 6, 2026 to April 15, 2026
Tree clearing will be happening along S High St between Moores Pike and 2nd St. Tree clearing is along the eastern side of the roadway. There will be lane closures with flagging for northbound traffic.
Engineering
LINESTRING(-86.5083987666094 39.15055779365551,-86.5083987666094 39.160915565072344)
2026 Candy Stripe Criterium Bike Race
Maker Way b/t Madison and Rogers
Madison b/t 10th and 11th
11th b/t Upland lot entrance and Morton
Morton b/t 10th and 11th
Ashlynn Park Dr b/t 11th and 12th
March 8, 2026 07:00 am to 18:00 pm
2026 Candy Stripe Criterium Bike Race
Public Works
LINESTRING(-86.53732274889997 39.173276317380186,-86.53731973291096 39.17226112228391,-86.53854585731196 39.17226426463381,-86.53732224943683 39.17225894795638,-86.53728307999985 39.17125407382312,-86.53668823923067 39.17169061556922,-86.53607250557162 39.17167790421476,-86.53605410236094 39.17327498117157,-86.5368833726933 39.17327811682648,-86.53687877195254 39.17400049963277,-86.53688179698179 39.17327884299877,-86.53732671052761 39.1732740952601)
Arlington Multifamily Utility Work
1210 W Arlington
March 9, 2026 to June 16, 2026
Mayer Najem is requesting lane shifts on W Arlington Rd adjacent to as part of the project located at 1320 W Arlington Rd. This request is for Sanitary sewer and storm upgrades, tapping water for the site, and transportation infrastructure updates totaling 7012 sq ft of non pavement and 7670 sq ft of pavement excavations. The traffic control is planned to be in place starting in early spring, currently estimated to be from March 2nd, 2026 through June 16th, 2025.
Engineering
LINESTRING(-86.54747272130943 39.179383055603836,-86.54803768028326 39.179662430757844,-86.54853445455336 39.18009281733603,-86.54874874933653 39.180289133145806)
ROW2025-12-2172
1805 N Monroe St.
March 9, 2026 to March 23, 2026
Single Lane closure 1 Day between dates.
Engineering
LINESTRING(-86.54688553433277 39.18388443537194,-86.54690341561707 39.18387196113184,-86.54748992537624 39.18388582137729,-86.54748813726417 39.183901067688595,-86.54688911055689 39.18388582137729)
CBU - Fire Hydrant Maintenance
North Elm Street will be closed to through traffic between West Kirkwood Avenue and West Sixth Street.
March 9, 2026 09:00 am to 15:00 pm
Crews will install the new hydrant, and no water service disruptions are anticipated during this phase. Motorists are encouraged to use alternate routes and remain alert for crews and equipment in the area.
Utilities
LINESTRING(-86.54528489008392 39.16670515698601,-86.54527384933033 39.167599673878925)
CBU - Fire Hydrant Maintenance
Intersection of West Kirkwood Avenue and North Elm Street
March 9, 2026 22:00 pm to 04:00 am March 10, 2026
Crews will begin removing the existing hydrant at 10:00 p.m. During this phase, there will be a lane restriction on West Kirkwood Avenue.
Utilities
LINESTRING(-86.54576429961998 39.16668398651734,-86.54485442788899 39.16667785230533)
Lane Restrictions on the NW corner of Kirkwood and Rogers for a tree removal
NW corner of W Kirkwood Ave and N Rogers St
March 9, 2026 08:00 am to 11:00 am
The NW corner of Kirkwood and Rogers will have lane restrictions for a tree removal. Signage will be in place.
Street
LINESTRING(-86.53872615438529 39.16663783558181,-86.53900242191382 39.16664303445623)
ROW2026-02-2275
1020 N Monroe
March 9, 2026 to March 16, 2026
Single lane closure with Flaggers
Engineering
LINESTRING(-86.54714346335565 39.175831159350196,-86.54716313283386 39.1757978908943,-86.54716492102777 39.17505073268609,-86.54712915813175 39.17505073268609,-86.54714167516174 39.1758270007941)
Lane Restrictions for Utility Cut Repair
West Bound lane of W Kirkwood Ave at N Elm St
March 10, 2026 08:00 am to 15:00 pm
West Bound lane of W Kirkwood Ave at N Elm St will be closed for a utility cut repair. Signage will be in place.
Street
LINESTRING(-86.54546898878557 39.166650790941304,-86.54516550283469 39.166647085486574)
ROW2026-03-2331
1105 S Madison
March 11, 2026 to March 13, 2026
1105 S Madison St.
Engineering
LINESTRING(-86.5375081237981 39.155393705071646,-86.53756176797842 39.15539509163864,-86.53756534420252 39.15525088630329,-86.53750991182832 39.15524949973346,-86.53750991182832 39.15539509163864)
Utility work for Arlington Multifamily Project
1210 W Arlington Rd
March 14, 2026 to March 22, 2026
Road closure of West Arlington Road from March 14–22, 2026 due to field conditions encountered during work under Permit number ROW2025-11-2134. The location of a sanitary manhole where work is required is near the roundabout and does not provide the required minimum 60 feet of taper distance for a single-lane closure. This closure is proposed during Indiana University and Monroe County Community School Corporation’s Spring Break to minimize traffic impacts and will allow crews to complete the sanitary work in this location, after which traffic control will return to the previously approved single-lane closure configuration. Detours will be routed via Gourley Pike and Kinser Pike.
External Project
LINESTRING(-86.54734369728439 39.17932336584778,-86.54771940542771 39.179472371500054,-86.54823491194995 39.179790700699186,-86.54875041847218 39.1802986698402,-86.54926592499444 39.181036911781746,-86.54980764371271 39.18192414642647,-86.5500086038824 39.18239823668432,-86.55010471526792 39.18285200579351,-86.55015713966 39.183502177322225)
ROW2025-12-2161
2104 E Woodstock Place
March 16, 2026 to March 18, 2026
Single lane closure with intermittent full closures as needed for pedestrians.
Engineering
LINESTRING(-86.50841604461961 39.156452286515474,-86.50848319044977 39.156452286515474,-86.50848319044977 39.15635201019123,-86.50841355777496 39.1563500817837,-86.5084110709303 39.156452286515474)
Centerpoint Relocation Work
1101 W 2nd st
March 16, 2026 to April 30, 2026
Miller Pipeline, on behalf of CenterPoint Energy, is requesting sidewalk closures, lane closures, and alley closures associated with utility relocation work along West 2nd Street from South Walker Street to South Maple Street. This work is required to relocate utilities in advance of the 2nd Street Modernization Project.
External Project
LINESTRING(-86.54559158251006 39.16143929955288,-86.54224580331889 39.161434100723596)
Centerpoint Relocation Work
1101 W 2nd st
March 16, 2026 to April 30, 2026
Miller Pipeline, on behalf of CenterPoint Energy, is requesting sidewalk closures, lane closures, and alley closures associated with utility relocation work along West 2nd Street from South Walker Street to South Maple Street. This work is required to relocate utilities in advance of the 2nd Street Modernization Project.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.54560109841951 39.16234877508592,-86.54559226336345 39.1615370044002),LINESTRING(-86.54399753574025 39.16153015397478,-86.54397986562806 39.16233849956615),LINESTRING(-86.54487662382061 39.16198570581051,-86.54340116945455 39.16197543023773),LINESTRING(-86.54328631372546 39.16198228061978,-86.54230120497208 39.161968579855056),LINESTRING(-86.54288431867363 39.1623316492188,-86.54291524136993 39.161540429612614))
CBU - Fire hydrant repairs
North Walnut Street will be closed between East Seventh Street and East Ninth Street
March 16, 2026 09:00 am to 15:00 pm
City of Bloomington Utilities will be performing fire hydrant repairs along North Walnut Street on Monday, March 16, from 9:00 a.m. to 3:00 p.m. During the repair, the west lane of North Walnut Street will be closed between East Seventh Street and East Ninth Street. Motorists should plan for possible delays and remain alert for crews and equipment working in the area.
Utilities
LINESTRING(-86.53363667800998 39.16860087938568,-86.53361955243749 39.17044971878917)
ROW2026-02-2269
703 E 3rd
March 16, 2026 to March 17, 2026
Lane closure of S Fess Ave
Engineering
LINESTRING(-86.52585996414747 39.16361921289018,-86.52588499812558 39.16361921289018,-86.52588499812558 39.16352216295681,-86.52585996414747 39.163516617265856,-86.52586175234137 39.16362198573168)
ROW2026-02-2269
703 E 3rd
March 16, 2026 to March 17, 2026
Alley closure
Engineering
LINESTRING(-86.52585277026392 39.163579709406605,-86.52585098215187 39.163550594437,-86.5256989902531 39.163551980874985,-86.52569541402899 39.163581095843995,-86.52585098215187 39.163579709406605)
Kirkwood Bollard Footing Installation, Dunn St Closure
Dunn St will be closed between Kirkwood and 4th St
March 16, 2026 to March 23, 2026
Dunn St will be closed between Kirkwood Ave and 4th St due to the construction of a footing pad for future bollard use. This closure should be 5 days. Starting Monday, 3-16 and through 3-20. There will be metal plates down until the concrete is ready for direct traffic. Thank you
Engineering
LINESTRING(-86.52824763944815 39.1655809438671,-86.5282382808381 39.165576106686444,-86.52825075890549 39.16651452780164)
ROW2026-03-2332
111 S Jefferson St.
March 17, 2026 to March 18, 2026
Single lane closures for street cuts.
Engineering
LINESTRING(-86.5071776221706 39.16728287429936,-86.5071579526924 39.16726069265545,-86.50715616449848 39.16718998855143,-86.5071758339767 39.16716087507615,-86.5071794103645 39.16728148796662)
ROW2026-03-2366
300 block of S. Grant St.
March 19, 2026 to March 20, 2026
road closure
Engineering
LINESTRING(-86.52980092644106 39.163137293500085,-86.52984920620334 39.163138679914454,-86.52984920620334 39.16305272086967,-86.52979913832901 39.16305272086967,-86.52980092644106 39.16314006636057)
ROW2026-03-2370
629 S Woodscrest Dr.
March 19, 2026 to March 23, 2026
Single lane closure
Engineering
LINESTRING(-86.50200129816294 39.160071844121035,-86.50202454394713 39.16006768463302,-86.50202096764116 39.160048273664444,-86.50201917952909 39.160006678758975,-86.50201917952909 39.1599623108433,-86.50199056932686 39.1599623108433,-86.50199056932686 39.15999697329869,-86.50199593374492 39.16004134119245,-86.50199950996904 39.160073230595884)
CBU - Water main relocation and service line connections
West Second Street from South Walker Street to South Rogers Street
March 19, 2026 18:00 pm to 08:00 am March 20, 2026
Beginning Thursday, March 19, at 6 p.m., CBU will close West Second Street from South Walker Street to South Rogers Street to perform a water main relocation and service line connections. Work is expected to be completed by Friday, March 20, at 8 a.m.
Utilities
LINESTRING(-86.54610369639701 39.16143206318003,-86.53872099346655 39.1613958004811)
ROW2026-02-2310
1100 E Miller
March 20, 2026 to March 27, 2026
Lane closure of Olive St.
Engineering
LINESTRING(-86.51874193439428 39.14673097976828,-86.51877590909638 39.14673097976828,-86.51877233270855 39.14662142575432,-86.51874014620037 39.14662142575432,-86.5187437225882 39.14672959303056)
ROW2026-03-2374
Alley at 115 N College
March 23, 2026 to March 24, 2026
Alley closure for lift
Engineering
LINESTRING(-86.5350160046142 39.16709176430055,-86.53502136903222 39.167065423522104,-86.53550953107293 39.167072355270136,-86.53551131926685 39.16710008244573,-86.5350160046142 39.16709315063699)
Lineal Utility Relocation for 2nd Street Modernization Project
525 S Walker St
March 23, 2026 to March 25, 2026
placing equipment in originally planned location not feasible. Single day lane closure at 2nd and Walker on NE corner of intersection with guided pedestrian diversion during core holing in crosswalk with uniformed officer to manage traffic due to lane closure occurring within 15' of signalized intersection.
External Project
LINESTRING(-86.54612826774401 39.1614765755715,-86.54614704320713 39.16175213560413)
Unscheduled Road Closing
Closing both lanes of Eagleson Ave between E Atwater Ave & E Hunter Ave - repair water main break.
March 23, 2026 daily until April 6, 2026
CBU crews will close both lanes of Eagleson Ave between E Atwater Ave & E Hunter Ave to repair a main break.
Utilities
LINESTRING(-86.51638997304609 39.16309308823048,-86.51636025894047 39.16214848802176)
ROW2026-03-2384
1114 S Brooks
March 23, 2026 to March 24, 2026
Lane Closure for sewer work
Engineering
LINESTRING(-86.50662104260365 39.154890703624886,-86.5065942205135 39.15486990461889,-86.50659243231961 39.15447610958867,-86.50661388999171 39.15447749617377,-86.50661567818563 39.154886543798796)
ROW2026-03-2330
305 E 18th Street
March 23, 2026 to April 6, 2026
3 days of closures between 3/23 and 4/06
Engineering
LINESTRING(-86.53057503568527 39.180268045950044,-86.53056960033356 39.180290516776836,-86.53029783274751 39.18023714858765,-86.53020724360746 39.180234339712456,-86.53019818457734 39.18021748658765,-86.53030689161177 39.18021889102559,-86.53057322392903 39.18026945038696)
ROW2026-03-2330
305 E 18th Street
March 23, 2026 to April 6, 2026
Sidewalk closure will not exceed 24 hours
Engineering
LINESTRING(-86.53057076702682 39.18025699113096,-86.53023638507877 39.18014610320793,-86.53018274089848 39.180147489318756)
ROW2026-03-2376
1025 S Walnut
March 23, 2026 to March 24, 2026
closure of Davis St East of Walnut
Engineering
LINESTRING(-86.53357483152101 39.154245506184424,-86.53357483152101 39.15420668109272,-86.53338528869607 39.15420668109272,-86.53338886492017 39.154242733005134,-86.53357483152101 39.154242733005134)
Road Closed for ADA Ramp Construction
S Woodlawn Ave between E Hunter Ave and E 2nd St
March 24, 2026 06:00 am to 16:00 pm March 26, 2026
S Woodlawn Ave from E Hunter Ave to E 2nd St will be closed from 6am to 4pm March 24, 2026 through March 26, 2026 for ADA Ramp construction.
Street
LINESTRING(-86.52262562273107 39.16220350204006,-86.52263345940094 39.16111888302328)
ROW2026-02-2285
2110 E Rhorer RD
March 25, 2026 to March 27, 2026
Single lane closures
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.51153886631701 39.1216674297678,-86.51152979395629 39.1214773924238,-86.51157515575989 39.1214773924238,-86.51157817997242 39.121658045204384,-86.51153584238135 39.1216674297678),LINESTRING(-86.51137088341302 39.12147388313164,-86.51136730702521 39.12145029981207,-86.5115657904923 39.121446138041506,-86.51156757868621 39.12147943219915,-86.51136730702521 39.12147804490064))
Cell Tower Equipment upgrade with bucket truck
2709 E 10th St WB right lane closure
March 25, 2026
Cell equipment upgrade with bucket truck and a west bound single right lane closure.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50111714472098 39.17168988543071,-86.50111714472098 39.17168988543071,-86.50107415290879 39.17167625055632),LINESTRING(-86.50107415290879 39.17167625055632,-86.50107415290879 39.17167625055632))
Cell Equipment Upgrade
321 N Woodlawn Ave
March 25, 2026
Cell Tower Equipment Upgrade with a bucket truck. South bound lane closed with
Flaggers
Engineering
LINESTRING(-86.52350136247888 39.169400925813335,-86.52350136247888 39.169400925813335,-86.52350136247888 39.16937493245672)
Cell Equipment Upgrade
2710 E Discovery Parkway West Bound Lane
March 25, 2026
Short term closure with a bucket truck for cell tower equipment upgrade. Flaggers on site.
Engineering
LINESTRING(-86.50119679873613 39.17563795887352,-86.50119679873613 39.17563795887352,-86.50113455018148 39.175630720488385)
Cell Equipment Upgrade
1485 E 10th St WB Lane
March 25, 2026
Lane Restriction with bucket truck and flaggers. Partial day closure.
Engineering
LINESTRING(-86.51373546169968 39.171602522063665,-86.51368986414643 39.171602522063665)
Road Closed for Tree Removal
W Howe St between S Davisson St and S Euclid Ave
March 25, 2026 08:00 am to 12:00 pm
W Howe St between S Davisson St and S Euclid Ave will be closed for a tree removal.
Street
LINESTRING(-86.54557429656776 39.162427213355414,-86.54337331764556 39.16241136305939)
CBU - Water main relocation and service line connections
West Second Street from the intersection of South Walker Street to South Rogers Street
March 25, 2026 20:00 pm to 08:00 am March 26, 2026
Beginning Thursday, March 26, at 8 p.m., CBU will close West Second Street from the intersection of South Walker Street to South Rogers Street to perform further water main and service line connections. This phase is anticipated to continue through Friday, March 27, at 8 a.m. Crews will return on Saturday, March 28, from 5 a.m. to 8 p.m. to complete the remainder of the work for this phase with the same traffic restriction in place.
Utilities
LINESTRING(-86.54610204448291 39.16142565330898,-86.53871437080652 39.161372318286396)
CBU - Water main relocation and service line connections
West Second Street from the intersection of South Walker Street to South Rogers Street
March 28, 2026 05:00 am to 20:00 pm
Beginning Thursday, March 26 at 8:00 p.m., CBU will close West Second Street from the intersection of South Walker Street to South Rogers Street to perform water line connections. This phase is anticipated to continue through Friday, March 27 at 8:00 a.m. Overnight work is planned to minimize impacts on nearby medical offices. Crews will return on Saturday at 5:00 a.m. to 8:00 p.m., March 28 to complete the remainder of water main relocations and service connections for this phase.
Utilities
LINESTRING(-86.5460691095289 39.16147240664256,-86.53872498043894 39.16139869252868)
Smithville Lane Closures for Boring Work
1011 W 2nd St
March 30, 2026 to April 10, 2026
Relocate communications facilities to remove conflict with INDOT project Des. No. 2200012. Dates 12/15/2025 - 12/29/2025 weather permitting. Temporary single lane closures along SB Rogers St, and NB Walker St.
External Project
LINESTRING(-86.54620011873324 39.16268918155808,-86.54600173434184 39.159464412490934,-86.54253000749225 39.15943694363574)
ROW2026-02-2275
1020 N Monroe
March 30, 2026 to April 6, 2026
Single lane closures
Engineering
LINESTRING(-86.54713558620284 39.176442809336464,-86.54713379809078 39.176096265184526,-86.54717313712905 39.17612537496075,-86.54717313712905 39.176444195520304,-86.54713200989688 39.176979256363836,-86.54709803527665 39.176979256363836,-86.54713022178481 39.17646914661853,-86.54713022178481 39.17644696787204)
ROW2026-03-2387
208 S Jefferson
March 30, 2026 to March 31, 2026
Lane closure
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50716193981745 39.16542857421376,-86.50713779993632 39.16542857421376,-86.5071337766228 39.16525596839762,-86.50716193981745 39.16525596839762),LINESTRING(-86.50716193981745 39.165425454835315,-86.50715925760844 39.16526220716946))
CBU - Stormwater Infrastructure Work
North Lincoln Street between East Seventh Street and East Eighth Street.
March 30, 2026 to April 10, 2026
Beginning Monday, March 30, North Lincoln Street will be closed to through traffic between East Seventh Street and East Eighth Street to allow crews to safely complete this work. The closure is expected to remain in place through Friday, April 10, weather permitting. During construction, CBU crews will work to minimize disruptions and maintain access for nearby residents and businesses whenever possible.
Utilities
LINESTRING(-86.53106007842146 39.16851953390912,-86.53106007842146 39.16949986649698)
ATT CPAD installation off shoulder.
1913 S High St
March 30, 2026 to April 2, 2026
Project # A058YE7 ROW2026-01-2212 AT&T PROPOSES TO PLACE A CPAD FROM EXISTING POLE AND TRANSITION TO BURIED. PROJECT TO TAKE 1-3 DAYS TO COMPLETE. Contractor notified of school drop of and pickup schedule and is not block lane in those windows.
Engineering
LINESTRING(-86.50834161062681 39.146357413815934,-86.50834161062681 39.14629834396206)
2nd St Curb Ramps and Bumpouts Project, Lane Restrictions.
2nd St between Lincoln and Park. At Lincoln, Grant, Dunn, Fess, and Park intersections will all have construction on all corners.
March 30, 2026 to May 4, 2026
There will be a reconstruction of Curb Ramps and Bump Outs added along E 2nd St. This will be between Lincoln and Park. Intersections will have work at all corners. Lane restrictions will be in place durin construction times.
Engineering
LINESTRING(-86.53128722544561 39.16135201596276,-86.52402290101114 39.1613283829702,-86.52399242102139 39.161052663435925,-86.52380954418348 39.16107629652112)
Cell Equipment Upgrade Half Day Full Closure
902 E Cottage Grove
March 31, 2026
Adding new cell equipment to new pole. Work from a bucket truck.
Engineering
LINESTRING(-86.52336351300995 39.17251102057335,-86.52314237551845 39.17250867213062)
ROW2026-04-2414
205 E Kirkwood
April 6, 2026 to April 8, 2026
lane and sidewalk closures for scaffolding pick up
Engineering
LINESTRING(-86.53233576481117 39.16660845365905,-86.53232858037055 39.166572247427496,-86.53172867957974 39.1665611070448,-86.53174304846095 39.16660845365905,-86.53233217259086 39.166611238753035)
CBU Water Main Maintenance
South Euclid Avenue from West Second Street to West Howe Street.
April 7, 2026 to April 8, 2026
CBU will be completing a valve replacement near 900 West Second Street that will require the closure of South Euclid Avenue for the duration of work. Crews will work to maintain access to residents whenever possible.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54334765035506 39.16239550958619,-86.54333700600152 39.16147609745863),LINESTRING(-86.54333700600152 39.16147444679768,-86.54333274826011 39.16147444679768))
ROW2026-02-2286
3900 block of S. Sare Rd.
April 7, 2026 to April 9, 2026
Lane closure of northbound S. Sare Rd.
Engineering
LINESTRING(-86.51153427005855 39.121475265786444,-86.51154495782775 39.121738526066935,-86.51157702113537 39.121736453155194,-86.51156900530847 39.12147319286697,-86.51153427005855 39.121475265786444)
CBU Closes Road
South Eagleson Ave from E Hunter Ave to East 2nd Street
April 8, 2026 to April 9, 2026
CBU Closes Road
For Sewer Line Repair
South Eagleson Ave will be closed from from E Hunter Ave to East 2nd Street
Utilities
LINESTRING(-86.51637502587835 39.162159233411046,-86.516377692204 39.16108626180525)
CBU Stormwater Maintenance
North Gates Drive between 301 West Jonathan Drive and 401 North Gates Drive.
April 9, 2026 19:00 pm to 09:00 am April 10, 2026
Beginning Thursday, April 9, 2026, at 7:00 p.m., CBU crews will conduct repairs on stormwater infrastructure located on North Gates Drive between 301 West Jonathan Drive and 401 North Gates Drive. Work will continue overnight until 9:00 a.m. on Friday, April 10.
Utilities
LINESTRING(-86.5764391420269 39.16972505157355,-86.57643049983103 39.16881718117682)
ROW2026-04-2409
611 W Wylie st
April 10, 2026 to April 14, 2026
Road will shift from closed to open a few times during this time frame.
Engineering
LINESTRING(-86.54069766493707 39.1583982687373,-86.54069766493707 39.1583610947408,-86.54056466595667 39.158358696417764,-86.54056311945688 39.15840066705897,-86.5406961184373 39.15840066705897)
ROW2026-02-2258
W Briarcliff Road, from N Kinser Pike to N Valleyview Dr.
April 10, 2026 to May 15, 2026
Sections within Fritz Terrace - Single lane closures
Engineering
LINESTRING(-86.54661272171674 39.194652066572786,-86.5466571326572 39.19463731572836,-86.54668039553079 39.19468648519771,-86.54670365840437 39.19475860035712,-86.54672269166457 39.19491266431339,-86.54672269166457 39.19504378230795,-86.54677987611622 39.19952873370184,-86.54672960066402 39.19952316785219,-86.54667234303443 39.19496783848348,-86.54665729320402 39.19475556030636,-86.54660913374677 39.194654086445695)
CBU - West Second Street - Phase 2
West Second Street from South Rogers Street to South Walker Street
April 11, 2026 05:00 am to 07:30 am April 12, 2026
Following the initial work completed in late March, CBU crews will return on Saturday, April 11, from 5:00 a.m. to April 12, 7:30 a.m. to complete the remaining work for Phase Two. This work will include pouring concrete on West Second Street which will require a temporary closure. Motorists are encouraged to use alternate routes.
Utilities
LINESTRING(-86.54611682721324 39.16142170667217,-86.5386983574601 39.16138746822381)
Centerpoint Gas Main Work
903 W Kirkwood
April 13, 2026 to May 18, 2026
Lane and sidewalk closures on W Kirkwood with impacts to Elm, Waldron, and Maple Streets to accommodate gas main relocations and improvements. This includes 702 linear ft of boring and 88 sq ft of excavations that include sidewalk panels and street cuts.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.5452439357437 39.1666471248289,-86.54374484935857 39.166634312511974,-86.54220346658947 39.166621138696),LINESTRING(-86.54374524779838 39.166606289472895,-86.54374524779838 39.166520906379134))
ROW2026-04-2402
101 N Roosevelt
April 13, 2026 to April 17, 2026
Rosure
Engineering
LINESTRING(-86.50606918113176 39.16695702532985,-86.50602215449652 39.166955809990924,-86.50602058694201 39.166825768606856,-86.50607701890432 39.16682819928917,-86.50607074868628 39.16695945600759)
ROW2026-03-2396
713 N. Grant
April 14, 2026 to April 16, 2026
Alley closure for Duke
Engineering
LINESTRING(-86.53039920273869 39.173421766193286,-86.53036682610201 39.17342296141166,-86.53036528435742 39.17320423611346,-86.53040382797249 39.17320423611346,-86.53040382797249 39.17342057097494)
CBU - West Second Street
Portions of West Second Street and South Walker Street at their intersection.
April 15, 2026 05:00 am to 23:00 pm
Beginning Wednesday, April 15 at 5:00 a.m. and ending at 6:00 p.m., City of Bloomington Utilities (CBU) will close portions of West Second Street and South Walker Street at their intersection to complete a water main relocation and a service connection. The same closure will be in place on Thursday, April 16 at 5:00 a.m. and is expected to be completed by 6:00 p.m.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54666555890833 39.16140549225807,-86.54613111945905 39.16144634743483,-86.54491922155296 39.16144051098249),LINESTRING(-86.54613111945905 39.161551403494684,-86.54613111945905 39.16134129121809))
ROW2025-12-2161
2104 E Woodstock
April 16, 2026 to April 17, 2026
EXPECT DELAYS... Northbound lane of S High St will be closed. When a pedestrian needs to cross the work zone,
flaggers will temporarily close southbound lane of S High St
and traffic control personnel will guide pedestrians around
the work site through the southbound lane.
Engineering
LINESTRING(-86.50841204364644 39.15656515348695,-86.50845227678165 39.15656515348695,-86.50845495899068 39.15626877457663,-86.50841338475094 39.15626773464848,-86.50841070254191 39.15656515348695)
AT&T Utility Work
1816 S High St
April 16, 2026 to April 17, 2026
South bound lane closure with flaggers just south of the Queensway intersection. Traffic will only be disturbed between 9am and 3:30pm.
Engineering
LINESTRING(-86.50834034122992 39.14634177134798,-86.50834034122992 39.14623432278404)
CBU - Water Main Maintenance
Sections of West Second Street and South Walker Street at their intersection.
April 17, 2026 17:00 pm to 18:00 pm
Beginning Wednesday, April 15 at 5:00 a.m. and ending at 6:00 p.m., City of Bloomington Utilities (CBU) will close portions of West Second Street and South Walker Street at their intersection to complete a water main relocation and a service connection. The same closure will be in place on Thursday, April 16 at 5:00 a.m. and is expected to be completed by 6:00 p.m.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.54681822102242 39.16137276545493,-86.54612058504603 39.161455079945824,-86.54492247045772 39.16146683902278),LINESTRING(-86.544952803161 39.161455079945824,-86.544952803161 39.16144332086688),LINESTRING(-86.54616608352242 39.161772578819466,-86.54613575081913 39.16116109789729),LINESTRING(-86.54613575081913 39.16116109789729,-86.54610541927292 39.16116109789729))
ROW2025-02-1308
909 W 1st
April 17, 2026 to April 24, 2026
Temporary lane closures for concrete truck.
Engineering
LINESTRING(-86.5446495273638 39.15943276651433,-86.5446508684683 39.159453564139795,-86.54385157018186 39.15944628497161,-86.54385157018186 39.159429646869995,-86.54401652603629 39.15942756710703,-86.54405944138051 39.15942756710703,-86.54437594204427 39.159429646869995,-86.54464818625928 39.15943484627721)
ROW2026-04-2409
611 W Wylie
April 17, 2026 to April 24, 2026
Short term closures of W Wylie at 611
Engineering
LINESTRING(-86.54070018008377 39.15840119771278,-86.54070286229279 39.158359601833524,-86.54053522422936 39.158359601833524,-86.54053388312485 39.158398078022685,-86.54070152118828 39.15840223760944)
CBU - Water Main Maintenance
West Second Street just East of South Walker Street Intersection.
April 21, 2026 02:30 am to 06:30 am
Beginning Tuesday, April 21 at approximately 2:30 a.m. and ending around 6:30 a.m., City of Bloomington Utilities (CBU) will be working in the center lane of West Second Street just east of the South Walker Street intersection to complete water main maintenance. Please watch for CBU crews and equipment during this period.
CBU staff will be flagging local traffic throughout the project, so please allow for potential delays. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
LINESTRING(-86.5460969392896 39.1614379996021,-86.54519431581274 39.16144296319686)
AT&T Southbound Lane Closed with Flaggers
1900 block of S High St
April 22, 2026 to April 24, 2026
Two short lane closure with flaggers for utility work off the shoulder. Work happening between 9am and 3pm to avoid school traffic.
Engineering
LINESTRING(-86.50833993188093 39.14633522158883,-86.50832910457062 39.14549508797484)
ROW2026-01-2242
S Smith and E Moores Pike
April 27, 2026 to May 1, 2026
Replacing equipment only on existing poles
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.48071828101652 39.15912787544181,-86.48072473490025 39.15912787544181,-86.48048343155216 39.15023957796592,-86.48044860449065 39.15023957796592,-86.48068608109425 39.15912813522789,-86.48072631422947 39.15912813522789),LINESTRING(-86.48040725255655 39.15017893465193,-86.4760203189885 39.15020677572875,-86.4760203189885 39.150233816185846,-86.48041091558298 39.150202446885885,-86.4804095744785 39.150178526471365))
Lane Closures for multiple permits
N Jefferson Street from 8th Street to 4th Street.
April 27, 2026 to April 29, 2026
Lane closure for road repairs
Engineering
LINESTRING(-86.50715951147164 39.16948379972516,-86.5071125143654 39.165172367222226,-86.5071338292781 39.165172367222226,-86.5071780376964 39.169479892265116,-86.50715658002429 39.169479892265116)
North Jefferson Street
North Jefferson Street; 8th to 10th
April 27, 2026 to June 30, 2026
Intermittent lane closures will take place for the duration of the project to accommodate storm water improvements and Sidewalk installation.
Engineering
LINESTRING(-86.50719158491388 39.17130354710221,-86.507172758117 39.16955204365513)
2026 Downtown Alley Project
Portions of the alley between College and Walnut spanning from 7th to 11th
April 27, 2026 to May 31, 2026
Portions of the alley between College and Walnut spanning from 7th to 11th will be closed intermittently for resurfacing as well as other improvements
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53422310435563 39.16908908812425,-86.53423469094652 39.16945976364744),LINESTRING(-86.53422303305354 39.169575269400724,-86.53421354987455 39.17045008319752),LINESTRING(-86.5341873463536 39.17176251841758,-86.53418330106125 39.1721072951365,-86.53417890158747 39.17248225650823,-86.53417022127073 39.17322206263546),LINESTRING(-86.53418950989536 39.17210733891983,-86.53470880295583 39.17209943374658),LINESTRING(-86.534181307079 39.17248228190087,-86.5347171620767 39.17247842355172))
ROW2026-03-2398
N Gates DR
April 28, 2026 to May 13, 2026
lane closure
Engineering
LINESTRING(-86.57644358088342 39.17105808647247,-86.57641005327072 39.17105808647247,-86.5764207821068 39.17091668582847,-86.57646503855553 39.17091876525177,-86.57644894530145 39.17105808647247)
Cell Equipment Upgrade At 2074 E 7th St
2074 E 7th St
April 29, 2026 to April 30, 2026
Cell equipment upgrade on local street with a single east bound lane closure. Work executed from a bucket truck.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.50848026650579 39.16821747109961,-86.50871692456795 39.16821436127239),LINESTRING(-86.50848026650579 39.16821747109961,-86.50848026650579 39.16821747109961))
Cell Equipment Upgrade 1469 E 17th St
East bound lane restriction at 1469 E 17th St
April 29, 2026 to May 1, 2026
Lane restriction to accommodate a bucket truck for equipment upgrade.
Engineering
LINESTRING(-86.51086903086593 39.17883370933555,-86.51084957361375 39.17883622314085,-86.51064202959047 39.17885884738487)
ROW2026-02-2297
S Sare Road from E Rogers to Hunters Glen
May 1, 2026 to May 30, 2026
Single lane restrictions and sidewalk closures
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.49652821687987 39.13627799335504,-86.49661600011642 39.13685674575609),LINESTRING(-86.49661600011643 39.13687376781348,-86.49663794592556 39.13771635451258,-86.49657210849817 39.138499355335256,-86.49659405430731 39.14008235213879),LINESTRING(-86.49659405430731 39.140065330857084,-86.49661600011645 39.14232912519927))
Milling and Resurfacing on N Bankers Dr
N Bankers Dr from E Rusgan Dr to E Blue Ridge Dr
May 4, 2026 06:00 am to 16:00 pm May 7, 2026
Lane Restrictions and No Parking on N Bankers Dr from E Rusgan Dr to E Blue Ridge Dr for milling and resurfacing.
Street
LINESTRING(-86.53274384640756 39.20072518654507,-86.53248399780713 39.20017981773913,-86.53242986268206 39.199840008880756,-86.53238655458199 39.199256876268635,-86.5323594870194 39.19881218195894,-86.53227828433177 39.198560466951136,-86.5321862546191 39.198325532130184,-86.53200219519383 39.1980905965236,-86.53178024118097 39.19790180841329,-86.53149873853052 39.19773819164067,-86.53105483050483 39.197578769803414,-86.53080580892943 39.19750325407003)
Milling and Resurfacing on N Ramble Road Ct
N Ramble Road Ct
May 4, 2026 06:00 am to 16:00 pm May 7, 2026
Lane Restrictions and No Parking on N Ramble Road Ct from N Ramble Rd to Dead End for milling and resurfacing.
Street
LINESTRING(-86.53295458460987 39.20536480771153,-86.5330049880507 39.20601761262449)
Milling and Resurfacing on E Rusgan Dr
E Rusgan Dr from N Ramble Rd W to N Ramble Rd E
May 4, 2026 06:00 am to 16:00 pm May 14, 2026
Lane Restrictions and No Parking on E Rusgan Dr from N Ramble Rd W to N Ramble Rd E for milling and resurfacing.
Street
LINESTRING(-86.53393847629839 39.20076953813148,-86.53313556513243 39.200642157512476,-86.53299015602362 39.20065685528803,-86.53274991488735 39.20074504187653,-86.53247806307525 39.20093121319994,-86.5322314998038 39.201038996372176,-86.53179527247741 39.20124966300406,-86.53144123290816 39.20140153855607,-86.53137801155651 39.201435832990086)
CBU - Stormwater Maintenance
Near 2803 North Blue Ridge Drive - West Lane
May 6, 2026 to May 13, 2026
Beginning Wednesday, May 6 at 9:00 a.m. and continuing for approximately one week, City of Bloomington Utilities (CBU) will implement a lane restriction near 2803 North Blue Ridge Drive to complete stormwater maintenance in the area.
CBU staff will coordinate with local traffic to maintain access to nearby residences and driveways throughout the project. Motorists are advised to use caution and watch for CBU crews and equipment while work is underway. As with all construction activities, the schedule is subject to change based on weather and field conditions.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53259262253322 39.19648239203951,-86.53184477943428 39.1958402801169,-86.53177483727396 39.19561929218884),LINESTRING(-86.53177483727396 39.19561929218884,-86.53176945710777 39.19561929218884))
ROW2026-03-2393
Intersection of W Allen Street and Strong Drive. Southbound Strong Drive and Eastbound West Allen Street. 3 Days between listed dates
May 7, 2026 to May 21, 2026
Lane Closures
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.54477149128924 39.15562936891084,-86.54431223886432 39.15563098796676),LINESTRING(-86.544316913891 39.15561104951141,-86.54425613854426 39.1552811578847))
11th Street Traffic Calming Project
Along W. 11th street between Maple and Monroe
May 7, 2026 to May 15, 2026
This project includes the installation of speed cushions and pavement markings. There will be lane restrictions with flagging in place.
Engineering
LINESTRING(-86.5418227032382 39.17325773342989,-86.5470631573579 39.17324428077998)
ROW2026-04-2452 and 2451
336 and 326 N Jefferson
May 7, 2026 to May 9, 2026
Lane restriction
Engineering
LINESTRING(-86.5071589025673 39.16947988966342,-86.50718572465743 39.16947988966342,-86.50718706576194 39.169195002270385,-86.50715622035827 39.169195002270385,-86.50715756146278 39.16947988966342)
Crown Castle Core Hole Road Repair
900 E Cottage Grove Ave
May 7, 2026 to May 8, 2026
Road repair for multiple core holes left after Crown Castle boring project. Closures should only require a few hours.
Engineering
GEOMETRYCOLLECTION(LINESTRING(-86.52341754471516 39.17250337078519,-86.52347789441798 39.172502331097036,-86.52347521220898 39.17245970386708),LINESTRING(-86.52352751528477 39.17250648984975,-86.52352751528477 39.17247945795248))