Choose types
2nd-Bloomfield Multimodal Safety Project Wst 2nd Street between Landmark Avenue and Patterson Drive April 1, 2019 to October 18, 2019
Traffic Signal and Sidepath project on West 2nd Street between Landmark Avenue and Bloomfield Road. Lane restrictions with flaggers in place.
Planning & Transportation
LINESTRING(-86.5539010858018 39.15995457833884,-86.55231321806497 39.160303975038914,-86.55158365721292 39.16038716447363,-86.55084336752479 39.16037052659456,-86.54977048391885 39.16036220765355,-86.5489336347062 39.16053690520826,-86.54850448126382 39.16074487792204)
Bottom Road Between Prather Road and Mt. Pleasant Road April 1, 2019 to September 30, 2019
This section of road will be closed for the bridge reconstruction and raising the road to address flooding issues. The north end by Prather will be open to local traffic only. Detour routes will be posted.
Monroe County Highway Department
LINESTRING(-86.60218395157979 39.30838547094996,-86.60257018967793 39.30795379629251,-86.60321391984151 39.3072564700671,-86.60351432725118 39.30671739751398,-86.60372890397237 39.30532271347556,-86.60420097275899 39.302533262020404,-86.60226978226827 39.299179131529456,-86.60226978226827 39.29758503297609,-86.60219043842335 39.29672656778553,-86.60180420032519 39.2962616098352,-86.60051673999806 39.295663802218854,-86.59905761829394 39.295431320100676,-86.59669727436084 39.2953316846708,-86.57759994617481 39.295165625306026)
West 17th Street Reconstruction West 17th Street from Lismore Drive to Monroe Street April 1, 2019 to November 8, 2019
West 17th Street from Lismore Drive to Monroe Street will be closed to traffic for a road construction project. Detour signage will be in place.
Planning & Transportation
LINESTRING(-86.55487335992433 39.17911030269323,-86.54920853448488 39.17904376886884,-86.54762066674807 39.17909366924303)
321 S Walnut S Walnut street between E Smith Ave and E 3rd St May 6, 2019 to August 1, 2020
Intermittent lane closures at S Walnut street between E Smith Ave and E 3rd St excluding hours of 7:30 am-9 am and 3 pm- 6pm. The sidewalk and Bike lane will be closed for the duration of the project as well as the north south alley. The east-west alley will be limited to 12ft westbound access.
Planning & Transportation
LINESTRING(-86.53361148906325 39.16314245870467,-86.53359003139113 39.163886970604324,-86.5330106742439 39.16388281134189,-86.53301603866194 39.1628721032713)
Duke Downtown relocation project N Morton St, S Gentry St, 4th St, and adjacent alleys May 15, 2019 to November 29, 2019
N Morton St, S Gentry St, 4th St, and adjacent alleys will have temporary closures through August 3rd.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53611399007409 39.16754494671832,-86.53611399007409 39.16722054037882,-86.53606571031182 39.16703754127076,-86.53604961705773 39.16664242793644),LINESTRING(-86.53558291268915 39.166550927689855,-86.53558570551294 39.16608105308566,-86.53558827710717 39.16564839615282),LINESTRING(-86.53677917790978 39.165610963719104,-86.53611399007409 39.16560680455859),LINESTRING(-86.53602279496758 39.16712072274254,-86.53551853967278 39.16712072274254,-86.53551317525476 39.16664242793644),LINESTRING(-86.53555609059897 39.16608094727465,-86.53492845368952 39.16608510640717))
Gordon Pike Rogers Street to mobile home park entrance June 4, 2019 to November 30, 2019
This segment of Gordon Pike will be closed for a bridge replacement
Monroe County Highway Department
LINESTRING(-86.53918780160537 39.121545076378425,-86.53594769311538 39.12147848810943)
Old State Rd 37 North Old State Rd 37 North between Gourley Pike and Club House Dr July 10, 2019 to October 15, 2019
Old State Rd 37 North between Gourley Pike and Club House Dr will be closed. Signage will be in place to Detour vehicles to N Walnut St
Planning & Transportation
LINESTRING(-86.53405941796873 39.18959205966095,-86.5349177248535 39.18774599796427,-86.53508938623047 39.18663168500359)
4th St Parking Garage Demolition and Reconstruction S Walnut St (eastern turn lane), W 4th St (eastbound lane), and E 3rd (westbound lane) July 15, 2019 to October 1, 2020
The will be a one-lane closure on S Walnut St (eastern turn lane), W 4th St (eastbound lane), and E 3rd (westbound lane). The adjacent sidewalks will be closed as well. Signage will be in place to direct traffic.
Planning & Transportation
LINESTRING(-86.53419605285141 39.16559848623683,-86.53365156442139 39.16559432707555,-86.5336542466304 39.16461899696793,-86.53425506144974 39.16462523579628)
Tuesday Farmers Market 6th & Madison Streets July 16, 2019 15:00 pm to 20:00 pm every 10 weeks on Tuesday for 10 times
Tuesday Markets are held at the intersection of 6th & Madison Street June 4-Sept. 24, 2019
Public Works
LINESTRING(-86.5373956506502 39.16854198240418,-86.53737419297806 39.167618681210996)
Winslow-Henderson Path Project South Walnut Street Pike from Winslow Road to a point 150 feet south of Winslow Road. August 20, 2019 to December 18, 2019
As part of the Winslow-Henderson Path Project, Walnut Street Pike will be closed to traffic from Winslow Road to a point 150 feet south of Winslow Road.
Planning & Transportation
LINESTRING(-86.52874327970129 39.13590412908874,-86.52849115205386 39.13559205966354)
Winslow-Henderson Path Project Winslow Road August 26, 2019 to December 18, 2019
Sidepath construction on Winslow Road between Walnut Street and Henderson Street. Construction also on Henderson Street from Winslow Road to Brandon Court. Lane restrictions will be in place.
Planning & Transportation
LINESTRING(-86.53110684049233 39.135938548221276,-86.5268904079209 39.13598847917655,-86.5269225944291 39.13800233152534)
Farmer's Market 401 N Morton St August 31, 2019 09:00 am to 13:00 pm weekly on Saturday until January 1, 2020
Morton St, 8th St and 7th St closed during farmer's Market hours
Parks & Recreation
GEOMETRYCOLLECTION(LINESTRING(-86.53805987267772 39.16953447895571,-86.53757171063702 39.16953032002721),LINESTRING(-86.53734640507977 39.168561282978516,-86.53614477544109 39.16855712399246),LINESTRING(-86.53611795335095 39.17041616624803,-86.53610186009685 39.16858623688978))
321 S Walnut St between Smith Ave and 3rd St September 9, 2019 09:00 am to 15:00 pm daily until September 20, 2019
Intermittent Lane closure in eastern lane of S Walnut St between Smith Ave and E 3rd St for deliveries
Planning & Transportation
LINESTRING(-86.53361685348129 39.16387657244766,-86.53362221789932 39.16288250157638)
South Olive Street South Olive Street from East Hillside Drive to East Thornton Drive September 16, 2019 to September 20, 2019
City of Bloomington Street Department will have road closed for a Sidewalk Project. Flaggers and signage will be in place. Questions, please call City Street 812-349-3448.
Street
LINESTRING(-86.51881836036259 39.15054087198055,-86.518798243795 39.14827880769241)
Boltinghouse Road Old SR 37 North to Earl Young Road September 16, 2019 to September 20, 2019
This segment of roadway will be closed for ditching and several culvert replacements. Weather permitting.
Monroe County Highway Department
LINESTRING(-86.49925665210962 39.2396746769478,-86.49397806476833 39.23884371653696,-86.49264768909693 39.237913029191674,-86.49114565204859 39.23688261094344,-86.49011568378688 39.23591865759113,-86.48921446155788 39.235353575330606,-86.48573831867456 39.23382450639545,-86.48335777928534 39.23375802438153,-86.47958122899237 39.23342561336696,-86.47756420781319 39.23349209569585,-86.47644840886298 39.233292648520234,-86.4755901019782 39.2324616125195,-86.4751180331916 39.231331387763845,-86.47460304906073 39.23089923819347,-86.47318684270085 39.23023438750403)
North Jackson Street North Jackson Street from West 13th Street to West 17th Street September 16, 2019 to September 20, 2019
City of Bloomington Street Department will have lane restrictions for a Resurface Project. Flaggers and signage will be in place.
Street
LINESTRING(-86.53968424358727 39.1789833935631,-86.53969765463232 39.1750640210077)
North Jackson Street North Jackson St has no parking and lane restrictions between W 17th Street and W 13th Street September 18, 2019 to September 24, 2019
Milling and resurfacing
Street
LINESTRING(-86.53968556083325 39.17898127092417,-86.53970605327684 39.17505250015057)
Garrison Chapel Road Between Airport Road and Gardner Road September 19, 2019
This segment of roadway will be closed for a culvert replacement, weather permitting.
Monroe County Highway Department
LINESTRING(-86.64293564630138 39.13427719196176,-86.6429785616456 39.13700306477958)
Liberty Drive Between Constitution Avenue and Bloomington City limits (just south of Krogers) September 20, 2019 to September 23, 2019
There will daily lane restrictions for this segment of roadway for paving operations. This will be under flagging operations so please use caution while in this area.
Monroe County Highway Department
LINESTRING(-86.5768460161743 39.15123543668642,-86.57680310083006 39.15176791599248,-86.57652415109251 39.152283751478166,-86.5756014711914 39.15309909663074,-86.57530106378172 39.15366484077671,-86.57536543679808 39.15705921013429,-86.57555855584715 39.157458536940425,-86.57622374368285 39.15782458452168,-86.57721079660033 39.15825718375336,-86.57783306909178 39.15878960992549,-86.57836951089477 39.15943849887503,-86.5788630373535 39.160170571530614,-86.57914198709106 39.160619794161335,-86.57914198709106 39.162033994824526)
S Sare Road South Sare Road from East Moores Pike to East Canada Drive September 23, 2019 to September 28, 2019
Crack Sealing from 6:30 pm to 2:30 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.4983349925936 39.15038530528281,-86.49897872275717 39.14965313081373,-86.49908601111778 39.14908735441588,-86.49902163810141 39.14727351118282,-86.49874268836386 39.14659122777647,-86.49730502433185 39.14575916589101,-86.49702607459433 39.14529320693873,-86.49685441321738 39.14407837088052),LINESTRING(-86.4968758708895 39.14401180391528,-86.49659692115195 39.14326292121862,-86.49652718371753 39.13916888832222,-86.49652718371756 39.1385031694123,-86.4965700990618 39.137055209048754,-86.49647353953725 39.13616478185514,-86.49651645488149 39.13516615852265,-86.49670957393056 39.134733417346865,-86.49778245753652 39.1336931632556,-86.49888752765081 39.132827660139924,-86.50044320887945 39.13187060104062,-86.50111912555118 39.13137958306305,-86.50182722873113 39.13071379050652,-86.50252460307499 39.129864895868195,-86.50331853694342 39.128200366875916,-86.50359748668107 39.127559512725526,-86.50427340335281 39.12660238203301))
E. Moores Pike (S. College Mall Rd to S. Woodruff Ln.) Sidewalk E. Moores Pike September 23, 2019 to November 30, 2019
Construction of a sidewalk on the southern side of E. Moores Pike from S. College Mall Road to S. Woodruff Lane.
Planning & Transportation
LINESTRING(-86.49814373241553 39.15034589399761,-86.49814373241553 39.15034589399761,-86.4953649638761 39.15027933295971)
North & South Pete Ellis Dr Pete Ellis Drive from East 10th Street to East Third Street September 23, 2019 to September 28, 2019
Crack Sealing from 6:30 am to 2:30 pm
Street
LINESTRING(-86.49541702149429 39.17146749828248,-86.49558868287126 39.17056918870412,-86.49593200562515 39.169413014117964,-86.49593200562515 39.16919674913552,-86.49577107308426 39.1689222580078,-86.49503078339615 39.16838159053205,-86.49494495270767 39.168273456538145,-86.49492349503555 39.16691760850327,-86.49490203736346 39.164214152508094)
Old SR 37 South SR 37 South to just north of Chumley Road September 24, 2019 to October 1, 2019
Daytime lane restrictions for paving operations on this roadway. Please use caution while in this area. This will be under flagging conditions.
Monroe County Highway Department
LINESTRING(-86.54279568862599 39.08508597921829,-86.54309609603565 39.084719553496484,-86.54283860397022 39.08431981417459,-86.54176572036427 39.083586952867876,-86.54095032882375 39.082554271740236,-86.54109933673348 39.08062397455754,-86.5413139134547 39.07932473805471,-86.54182889758553 39.078358623606846,-86.54376008807628 39.07585999041228,-86.54440381823984 39.07479387998663,-86.54448964892833 39.07316136718211,-86.54431798755137 39.06989622827487,-86.54397466479746 39.06906326049261,-86.54277303515877 39.0676638524879,-86.54174306689707 39.06663093830639,-86.54114225207773 39.06526480278643,-86.54097059070078 39.063065602265965,-86.5408847600123 39.06033316678679)
East Brighton Crest Road East Brighton Crest Road from East Bennington Blvd to South Smith Road September 24, 2019 to September 28, 2019
Paving from 6:30 am to 2:30 pm Tuesday through Friday
Street
LINESTRING(-86.47784509764135 39.160428662349574,-86.47779145346107 39.159929524560056,-86.47770562277259 39.15958844503379,-86.47761979208411 39.1592972782762,-86.47745885954338 39.15884804720065,-86.47743203745323 39.158506962431204,-86.47743203745323 39.15809516276235,-86.4774910460515 39.15785806488992,-86.47776999578905 39.157512815682,-86.47804894552658 39.15732147201783,-86.47845664129686 39.157200842049065,-86.4787731419606 39.15717172443942,-86.47908964262436 39.15717588409868,-86.4794919739766 39.15726739654016,-86.47979774580429 39.15739218604131,-86.47999622927139 39.15745042106607,-86.4802322636647 39.15752945423691,-86.4805702220006 39.1575419331505)
East Bill Mallory Blvd East Bill Mallory Blvd from State Road 446 to South Park Ridge Road September 24, 2019 to September 28, 2019
Paving from 6:30 am to 2:30 pm Tuesday through Friday
Street
LINESTRING(-86.47161358806727 39.15909522211112,-86.47233242008326 39.15908690301933,-86.47267574283718 39.15910354120197,-86.47324437114833 39.15933647534587,-86.47337311718104 39.15933647534587,-86.47620552990078 39.15932815628261)
West 1st Street eastbound lane closed W 1st St from S Walker St to S Fairview St September 24, 2019 07:00 am to 17:00 pm every 3 days until September 26, 2019
The eastbound lane will be closed for utility work. Flaggers will be in place to direct traffic.
Planning & Transportation
LINESTRING(-86.54582358670798 39.15947662111671,-86.54351688695516 39.15942670682165)
2019 Lotus World Music Festival Downtown Bloomington September 26, 2019 07:00 am to 16:00 pm September 29, 2019
This request is for street closures, use of parking spaces, and noise waiver for the 26th Anniversary Lotus World Music & Arts Festival scheduled for Thursday, September 26 through Sunday, September 29, 2019. Each fall the signature World Music & Arts Festival presents 50+ performances with over 140 individual artists from across the globe, serving a multi-generational audience of over 12,000 people. The Festival spans 4 days and creates a multi-block pedestrian perimeter in downtown Bloomington.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53479434323884 39.16756220685872,-86.53366781545257 39.16755804781357),LINESTRING(-86.53480507207489 39.165592871470494,-86.53370000196075 39.165592871470494))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.