5/7/1998 05:00:00 Closed by Anonymous
[data cleanup] Closing date was missing and has been provided by the system as a best guess
Other: See attached copy of e-mail. Since the completion of the south end of Clarizz Blvd., at the entrance to University Commons, the surface drainage onto the north side of Moores Pike has steadily increased.
Most tickets of this type should be closed within 2 days, although some cases may be longer. 0 days have already passed.
[data cleanup] Closing date was missing and has been provided by the system as a best guess
Inspected area with Gary Campbel. Homeowners on site with Jeff Fanyo, B. F. & assoc. The road will be shored up and the runoff prob. will be addressed with the bulitout and construction od detention pond.
City | Bloomington |
---|---|
State | IN |
Zip | 47401 |
Latitude | 39.149742126465 |
Longitude | -86.490089416504 |
Township | Perry |
Status | Case Date | Category | |
---|---|---|---|
open | 5/24/2023 | Blocked Sidewalk | |
closed | 9/14/2022 | Sidewalk & Curb Complaints | |
closed | 8/2/2021 | Excessive Growth | |
closed | 10/17/2014 | Other | |
closed | 5/6/2013 | Potholes, Other Street Repair |