2/15/2013 10:03:04 Closed by Danna Workman
Holes patched 2/14/13
Potholes on E First Street: 300 block, north side 600, 700 and 800 block, in the middle of the street. Thanks!
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
Holes patched 2/14/13