7/19/2013 13:47:56 Closed by Danna Workman
Area patched 7/19/13..no contact #..dw
There has been a large dip in the concrete in this sidewalk for quite some time now. It is located right when you pull in off of Third Street into the alley between Baked Cookies and Sweet Claire's bakery. The sidewalk must have been unstable when it was poured and one section has sunk down about six inches, leaving a ledge between the two sections. Thanks for your attention to this concern.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 106 days have already passed.
Area patched 7/19/13..no contact #..dw
After inspection it may be possible to apply some asphalt fill and level this area out. Street staff will obviously be a better judge of this compared to me...
City | Bloomington |
---|---|
State | IN |
Zip | 47401 |
Latitude | 39.164627075195 |
Longitude | -86.530448913574 |
Township | Bloomington |
Status | Case Date | Category | |
---|---|---|---|
closed | 7/28/2014 | Sewer Problems (Storm Sewers) | |
closed | 4/4/2013 | Potholes, Other Street Repair |