5/21/2013 16:40:26 Closed by Anonymous
Patch repair wasn't completed at the time.
Phone Call: Anonymous caller asked if the utility cuts on College Ave between 11th and 12th could be patched. Cuts are part of a large construction project. Caller said street is in very bad shape and could result in tire damage, etc.
Patch repair wasn't completed at the time.
Asphalt is available on 4-15. The patches will be paved on 4-17.