7/22/2013 15:02:00 Closed by Anonymous
Talked with engineering on 7/22 - road is scheduled to be resurfaced next week. Emailed Eoban with this information.
Other: The construction workers tore up the street here ages ago and it has not been repaved. This is a problem for cyclists, who were obviously not considered at all here even though this is a popular street for biking and right next to the B-line. Furthermore trucks drop tons of gravel on the street every day. Absolutely ridiculous.
Talked with engineering on 7/22 - road is scheduled to be resurfaced next week. Emailed Eoban with this information.
City | Bloomington |
---|---|
State | IN |
Latitude | 39.165630340576 |
Longitude | -86.535903930664 |
Status | Case Date | Category |
---|