10/4/2013 13:48:42 Closed by Anonymous
Mr. Conrad was satisfied with what I told him and thanked me for my prompt response.
Phone Call: Homeowner thinks CBU Engineering needs to look at ongoing curb/sidewalk project in the area of E. Maxwell Lane and S. Highland Avenue.
Mr. Conrad was satisfied with what I told him and thanked me for my prompt response.
I contacted the homeowner (Steve Conrad) at 1301 East Maxwell Lane. I reminded him that the contractor is working for the City DPW and assured him that CBU Engineering has reviewed the plans associated with the storm work around his home and finds no issues regarding the sidewalks, tree plots and curbs. I instructed Mr. Conrad to contact CBU should an issue associated with this work arise in the future. Per Mr. Conrad's request, I provided him with the name of the CBU engineer who reviewed the plans (Jane Fleig) and the CBU inspector on this particular job (David Myers). I also gave him my direct phone number and told him to call me if he had any questions in the future.