6/12/2014 08:33:11 Closed by Danna Workman
2014 Paving Schedule; citizen notified
Other: High street between Hillside and 2nd needs to be completely repaved; the patches that were put in after the winter are not holding up to the heavy traffic this street gets. I hope that High St is on the list for repaving this summer.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 2 days have already passed.
2014 Paving Schedule; citizen notified
High Street from Hillside to 1st is on 2014 paving schedule