closed: Resolved #143131

Potholes, Other Street Repair:

Other: The construction at the corner of 11th and Walnut of the new apartment building has left this area of Walnut hazardous and capable in inflicting vehicle damage even when travelling slowing, especially the utility cut across Walnut which has not been filled in to be even with the road surface. This is the same type of problem that existed at 11th and Rogers but is horizontal across the street instead of diagonal across the intersection. The problem at 11th was fixed but this one needs attention ASAP to prevent damage to vehicles and subsequent claims to the city for that damage. There are also breaks and holes and bumps in the pavement at the crest and going down the other side towards 12th street and so on. Thank you for your always prompt and excellent responses to my reports.

Assigned to
Roy Aten

Most tickets of this type should be closed within 7 days, although some cases may be longer. 33 days have already passed.

History

2/9/2015 07:47:37 Closed by Roy Aten

Spoke with Bob Eckert via phone. Contractor has repaired road with temporary patch. Issue closed.

1/14/2015 07:46:52 Roy Aten followed up on this ticket

Spoke with Bob Eckert via phone. Contractor has repaired the road, this issue is closed.

1/13/2015 15:14:58 Roy Aten followed up on this ticket

emailed Mr Eckert; Mr Echert, On January 7th you notified the City via UReports that the construction at 11th and Walnut has damaged the pavement to Walnut Street. I wanted to respond to your issue to let you know that we are working on resolving the issue. The responsible contractor has been notified twice to have the street repaired. As of today he has indicated that he will place a cold winter patch on the utility cut in the travel lanes. The contractor will continue to monitor this cut throughout the winter and in the spring of 2015 will repair the roadway with a permanent patch. We apologize for any inconvenience that this may have caused you and we appreciate you bringing this to our attention. Please feel free to contact me with any further concerns regarding this issue. Sincerely, Roy Aten City Of Bloomington Planning and Transportation Department

1/13/2015 15:14:23 Roy Aten inspected this Location

Called contractor for repair. He indicated that they were hopeful that the weather would warm for a permanent patch. They agreed to install a temporary patch until spring.

1/9/2015 15:13:24 Roy Aten inspected this Location

Inspected street cut and contacted contractor for a repair.

1/7/2015 11:37:15 Anonymous assigned this case to Roy Aten

1/7/2015 08:02:14 Danna Workman assigned this case to Anonymous

1/7/2015 00:04:12 Anonymous assigned this case to Danna Workman

1/7/2015 00:04:12 Opened by Anonymous

700 N Walnut ST

CityBloomington
StateIN
Zip47408
Latitude39.173290252686
Longitude-86.533576965332
TownshipBloomington

Other cases for this location

StatusCase DateCategory
closed6/16/2015Excessive Growth
closed3/5/2015Blocked Street
closed5/29/2013Excessive Growth
closed4/20/2012Excessive Growth
closed8/25/2010Excessive Growth
closed7/15/2010Excessive Growth
closed4/20/2007Trash
closed10/29/2004Trash