4/23/2015 14:06:13 Closed by Danna Workman
Potholes repaired.
Other: Terrible patch job on eastbound turn lane makes beginning of lane inaccessible for low-clearance vehicles. Been like this for several weeks. Needs asphalt.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 37 days have already passed.
Potholes repaired.
City | Bloomington |
---|---|
State | IN |
Latitude | 39.16145324707 |
Longitude | -86.539894104004 |
Status | Case Date | Category |
---|