5/8/2015 12:57:04 Closed by Andrew Cibor
A project is under design and planned for construction in 2017 that will resolve the concern.
Other: Picture Vs. Map = unrelated. The picture has relevance as that is what traffic is like on Tapp/Country Club at 3:40 - 5:45 on a Friday near to Rockport intersection. And NO, this keyboard has not disappeared, it is holding its own; = yeah. Randy 812-360-3600
A project is under design and planned for construction in 2017 that will resolve the concern.
Contacted Chief Diekhoff - not possible for police to direct traffic at the intersection during peak hour.
Called and spoke with Randy. Informed him of plans. He inquired about possibly having a police officer direct traffic during the evening rush hour to improve traffic flow. I let him know I would look into that. He looks forward to the traffic signal project and would even be interested in two-way stop control now but recognizes the challenges and unlikeliness associated with it.
We are in the preliminary engineering stage of designing a traffic signal and intersection reconstruction option to address the identified concern. Property acquisition for the project is scheduled to occur in 2016, with construction slated for summer of 2017.
I tried assigning this to Russell White, but I got a message that he is out of the office until May 19th. Please feel free to reassign this to someone else in your department if they would be a better fit to respond.
I spoke with Randy about this issue and he is more concerned with the traffic aspect of this report, rather than the application aspect of it. I told him I would update the request to reflect that new category.
I encouraged Randy to try out the GeoReporter App instead of the Blooington iPhone app. These comments are in response to that version.
Status | Case Date | Category | |
---|---|---|---|
closed | 7/6/2010 | Excessive Growth |