5/27/2015 07:51:06 Closed by Danna Workman
Allendale is scheduled for resurface in 2015; citizen notified.
Other: Allendale is literally falling apart. Though the city patches potholes seemingly on a weekly basis, the road needs to be resurfaced. 1 inch cracks appear everywhere, and I mean everywhere. Though cars don't notice 1 inch cracks, bicycles do. This is supposed to be a designated bike route.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 3 days have already passed.
Allendale is scheduled for resurface in 2015; citizen notified.