7/10/2015 09:46:37 Closed by Anonymous
The Pothole has been patched.
Other: Pothole just before the High & E Second Street intersection, if you are heading towards the Mall.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 10 days have already passed.
The Pothole has been patched.
The pothole has been patched.
Thank you for the heads-up. Case Paving is doing work in the area and have been made aware of the problem. The hole should be patched promptly. Dan Backler
Case Paving is aware of the problem and will be fixing it promptly.
Do they have a permit and need to fix things up?
Miller Pipe working in area.