7/14/2016 16:01:18 Closed by Adam Wason
College and Walnut are both scheduled for paving this summer.
Other: With all of the construction of the new apartment buildings along college and walnut, are there any plans to fix the streets? the area just south of 17th and college is extremely dangerous with the addition of the parking spaces and NO lane markings. I think the city needs to focus on the roads a little more, especially the main street through town. The area of college and walnut between hwy 46 and the square has been neglected for too long and needs repaired.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 104 days have already passed.
College and Walnut are both scheduled for paving this summer.