3/16/2017 10:55:10 Closed by Anonymous
Monitored signal operation and found no problems at this time. Notified by email.
Other: Both Mon. and Tues. (today) the wait to get through the light at E Moores Pike and High Street was extremely long. I travel west on Moores Pike/Hillside every weekday between 8:30am and 9:00am. Today the traffic was backed up all the way to the Moores Pike Roundabout. It \probably took at least 5 cycles of the stop light before I was through that intersection. Note: The last time I reported a similar situation at this stop light, it was a bad sensor. Thank you.
Monitored signal operation and found no problems at this time. Notified by email.
Mike - can you check the signal detection? Let us know if there is something we need to do on our end.
City | Bloomington |
---|---|
State | IN |
Latitude | 39.150493621826 |
Longitude | -86.508354187012 |
Status | Case Date | Category |
---|