Drainage or Runoff:

Other: We would like to install a drainage pipe along the creek bed at 3750 E. Third St., Beth Shalom Jewish Center. I want to make sure that there are no regulations against it, and it would be OK to remove the metal bars, and continue the pipe coming from our east. The creek bed is on our property, but the culvert is maintained by the state. Also, I would like to know where the culvert originates.

Assigned to
Jane Fleig

History

10/6/2017 16:27:23 Closed by Jane Fleig

I answered her questions and asked her to keep us informed if they decide to move forward with their plans.

Sent notification to Jane Fleig, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=160452 Closed by Jane Fleig I answered her questions and asked her to keep us informed if they decide to move forward with their plans.

10/6/2017 16:24:50 Jane Fleig followed up on this ticket

I followed up on this issue on 8/24/17 but forgot to add it to the Ureport. On 8/24/17 I sent the following email to Ms. Wainshilbaum: I did a very quick calculation of the drainage basin upstream of the Beth Shalom property and it appears the pipe could be extended to the east with the same size pipe as the existing. Your contractor should verify the size but it appears to be a 30"X48" corrugated metal arch pipe. If you decide to move forward with this, I would suggest you have the contractor install the pipe with as much slope as possible, but not less than 0.75%. You will also have to figure out how to continue to accept the flow that comes off the south side of E 3rd Street from a curb turnout. It will either need to be captured in a pipe you will need to grade the area so that it continues to flow to the west. Please let me know if you decide to move forward with this project as we will want to make sure our existing sanitary sewer is protected (remember it is within a 20' easement) and that the new storm pipe is installed correctly. I am out of the office until Sept. 5th but would be happy to answer any further questions at that time.

Sent notification to Jane Fleig, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=160452 Jane Fleig followed up on this ticket I followed up on this issue on 8/24/17 but forgot to add it to the Ureport. On 8/24/17 I sent the following email to Ms. Wainshilbaum: I did a very quick calculation of the drainage basin upstream of the Beth Shalom property and it appears the pipe could be extended to the east with the same size pipe as the existing. Your contractor should verify the size but it appears to be a 30"X48" corrugated metal arch pipe. If you decide to move forward with this, I would suggest you have the contractor install the pipe with as much slope as possible, but not less than 0.75%. You will also have to figure out how to continue to accept the flow that comes off the south side of E 3rd Street from a curb turnout. It will either need to be captured in a pipe you will need to grade the area so that it continues to flow to the west. Please let me know if you decide to move forward with this project as we will want to make sure our existing sanitary sewer is protected (remember it is within a 20' easement) and that the new storm pipe is installed correctly. I am out of the office until Sept. 5th but would be happy to answer any further questions at that time.

8/24/2017 12:32:54 Jane Fleig inspected this Location

I met with Ms Wainshilbaum on Monday and discussed the issues. I gave her a GIS map and told her I would look at proper sizing of the pipe and get back with her.

Sent notification to Jane Fleig, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=160452 Jane Fleig inspected this Location I met with Ms Wainshilbaum on Monday and discussed the issues. I gave her a GIS map and told her I would look at proper sizing of the pipe and get back with her.

8/18/2017 16:06:06 Jane Fleig followed up on this ticket

I called Sharon and will meet her on site Monday.

Sent notification to Jane Fleig, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=160452 Jane Fleig followed up on this ticket I called Sharon and will meet her on site Monday.

8/18/2017 15:55:38 Phil Peden assigned this case to Jane Fleig

Sent notification to Jane Fleig, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=160452 Phil Peden assigned this case to Jane Fleig You can use the link to follow progress on this case.

8/11/2017 12:34:57 Nancy Axsom assigned this case to Phil Peden

Phil, reassigning this case to you.

Sent notification to Phil Peden, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=160452 Nancy Axsom assigned this case to Phil Peden You can use the link to follow progress on this case. Phil, reassigning this case to you.

8/3/2017 12:48:46 Anonymous assigned this case to Nancy Axsom

Sent notification to Nancy Axsom, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=160452 Anonymous assigned this case to Nancy Axsom You can use the link to follow progress on this case.

8/3/2017 12:48:46 Opened by Anonymous

3807-3811 East 3rd Street

CityBloomington
StateIN
Latitude39.164516448975
Longitude-86.481422424316

Other cases for this location

StatusCase DateCategory