9/14/2017 12:56:50 Closed by Anonymous
This was patched last week per Tom Axsom.
Other: The street repair jobs done on Hillside after the construction work this week at the intersection of Clifton is not holding up. It's been gradually sinking into the ground over the last four days with all the traffic going over it. It will likely start causing damage within the next few days if it isn't addressed soon. There's another patch that was part of that same effort at the intersection of Nancy, but it's not quite as bad. But I would suspect it will need addressing shortly thereafter since it also shows signs of settling.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 6 days have already passed.
This was patched last week per Tom Axsom.
Larry, These repairs need attention.
Dan, I am not sure what work they are speaking of here. We do not have a project in this area. This may be a street cut. Thanks,