6/18/2018 12:51:24 Closed by Anonymous
HM MAC has (finally) paved Washington. Dan backlerd@bloomington.in.gov
Other: The pavement on Washington Street behind the recently completed Chocolate Moose Building is in really bad shape. It is kind of filled in but not level with old pavement and has lots of gashes in it. The bike lane there is especially bad. The new pavement south of 2nd street is great, especially where the cars are on the left side.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 269 days have already passed.
HM MAC has (finally) paved Washington. Dan backlerd@bloomington.in.gov
This is related to the Urban Station project. HM MAC is responsible for the repair but were unable to get to it before the asphalt plant shut down for the winter. This will be addressed this spring.