11/15/2017 07:48:36 Closed by Danna Workman
Pothole repaired.
Other: Pot hole forming at storm drain along Hillside
Most tickets of this type should be closed within 7 days, although some cases may be longer. 9 days have already passed.
Pothole repaired.
| City | Bloomington |
|---|---|
| State | IN |
| Latitude | 39.150505065918 |
| Longitude | -86.510330200195 |
| Status | Case Date | Category | |
|---|---|---|---|
| closed | 3/12/2016 | Potholes, Other Street Repair |