2/9/2018 14:26:56 Closed by Danna Workman
Thank you for reporting, a crew was dispatched and potholes have been repaired.
Other: Between the B-Line Trail and College, on First Street 2 potholes each on the north and south side of the street.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 2 days have already passed.
Thank you for reporting, a crew was dispatched and potholes have been repaired.