3/6/2018 07:01:45 Closed by Danna Workman
Thank you for reporting, this area of repair needs hot mix.
Other: Potholes, potholes: From the High Street/E Second intersection on both sides of the street all the way up to the College Mall Rd/E Second intersection; On Buick Cadillac Blvd, right in front of Kittle's At the corner of College Mall Rd and Buick Cadillac Blvd; In front of 17861 Miller Drive; At the intersection of Jordan and E First.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 4 days have already passed.
Thank you for reporting, this area of repair needs hot mix.