5/7/2018 13:08:18 Closed by Danna Workman
Thank you for reporting, the potholes have been repaired.
Other: Pothole on Buick Cadillac Boulevard, on the north side in the first block east of College Mall Rd, in front of the bank.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 2 days have already passed.
Thank you for reporting, the potholes have been repaired.