5/21/2018 06:14:22 Closed by Danna Workman
Thank you for reporting, the mentioned concern is maintained by INDOT 1-866-682-3566. Thank you.
Other: west 3rd Ave. I total understand that road construction needs to be completed and delays can be expected. However, the traffic pattern on west 3rd over 37 is unacceptable. I live of Johnson Drive (a few blocks east of the intersection) and I can't even get home without be blocked by traffic for 25 to 30 minutes. The construction company seems to have enough paved space now to keep 2 east/west bound lanes open and keep the traffic flow going. They need to re strip the lanes and/or have police direct traffic. There are only 2 fully operational overpasses on 37 which would be fullerton way south or 46 up north squeezing all the traffic on to 2nd/3rd which are both restricted in lanes. As I said, delays can be expected with construction but the times are unacceptable.
Thank you for reporting, the mentioned concern is maintained by INDOT 1-866-682-3566. Thank you.