Traffic Suggestions:

Other: The construction on Rhorer and Gordon Pike has pushed a lot of the thru-traffic on the South side to East Burks Dr., resulting in a traffic load that the small, curved road wasn't designed for. More cars are coming through, and not always at a safe speed. This issue is highlighted by the fact that currently, there are no signs prohibiting parking on either side of Burks Dr., so residents park on both sides of the street. This creates a one-lane road that has to accommodate a large traffic load (relative to it's design). Some residents have even taken to parking large tractor/trailer vehicles on the road, which almost completely eliminates visibility of oncoming traffic as you round the bend going from west-to-east. My suggestion is to please restrict parking to the east-to-west side of the street, and post "No Parking" signs on the west-to-east side of the street. This allows for the greatest visibility for both sides of traffic, and also maintains two-way traffic, an important element to South side transportation with alternate routes still under construction.

Assigned to
Elizabeth Carter

History

5/21/2021 09:05:15 Closed by Elizabeth Carter

The Fullerton Pike project and associated road closures had created an uptick in traffic in neighborhoods near the site. Monroe County Highway Department was responsible for this project; the decision of whether or not to add traffic control in nearby areas was up to County Highway. If concerns about on-street parking remain, please reach out to the City Engineering Department to request an investigation of the parking situation.

Sent notification to Elizabeth Carter, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=166167 Closed by Elizabeth Carter The Fullerton Pike project and associated road closures had created an uptick in traffic in neighborhoods near the site. Monroe County Highway Department was responsible for this project; the decision of whether or not to add traffic control in nearby areas was up to County Highway. If concerns about on-street parking remain, please reach out to the City Engineering Department to request an investigation of the parking situation.

12/17/2018 15:05:46 Neil Kopper assigned this case to Elizabeth Carter

Sent notification to Elizabeth Carter, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=166167 Neil Kopper assigned this case to Elizabeth Carter You can use the link to follow progress on this case.

10/9/2018 07:26:54 Joe VanDeventer assigned this case to Neil Kopper

Sent notification to Neil Kopper, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=166167 Joe VanDeventer assigned this case to Neil Kopper You can use the link to follow progress on this case.

10/8/2018 16:12:39 Anonymous assigned this case to Danna Workman

Sent notification to Danna Workman, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=166167 Anonymous assigned this case to Danna Workman You can use the link to follow progress on this case.

10/8/2018 16:12:39 Opened by Anonymous

216 E Burks DR

CityBloomington
StateIN
Zip47401
Latitude39.12606048584
Longitude-86.528373718262
TownshipPerry

Other cases for this location

StatusCase DateCategory
closed3/30/2017Recycling
closed12/27/2016Recycling
closed6/23/2016Recycling
closed2/23/2016Recycling
closed10/1/2015Recycling
closed1/9/2015Recycling
closed8/26/2014Recycling
closed11/14/2013Recycling
closed11/15/2012Trash
closed3/16/2006Recycling
closed4/16/1998Trash
closed4/3/1997Trash