1/9/2020 15:30:44 Closed by Neil Kopper
constituent emailed with the following: thank you for submitting this uReport requesting a crosswalk at the intersection of 11th and Walnut. The City is currently working on design to install a traffic signal at this intersection. The signal would include pedestrian crosswalks and is expected to reduce crash risk for pedestrians crossing the street. That construction is expected in 2021.
Sent notification to Neil Kopper, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=171277
Closed by Neil Kopper
constituent emailed with the following: thank you for submitting this uReport requesting a crosswalk at the intersection of 11th and Walnut. The City is currently working on design to install a traffic signal at this intersection. The signal would include pedestrian crosswalks and is expected to reduce crash risk for pedestrians crossing the street. That construction is expected in 2021.
12/23/2019 10:18:13 Elizabeth Carter assigned this case to Neil Kopper
Sent notification to Neil Kopper, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=171277
Elizabeth Carter assigned this case to Neil Kopper
You can use the link to follow progress on this case.
12/20/2019 17:12:06 Anonymous assigned this case to Elizabeth Carter
Sent notification to Elizabeth Carter, Anonymous
https://bloomington.in.gov/crm/tickets/view?ticket_id=171277
Anonymous assigned this case to Elizabeth Carter
You can use the link to follow progress on this case.