2/12/2020 09:32:25 Closed by Adam Wason
The previous report has a note that this section of roadway is intended to be paved as part of the 2020 paving season.
Other: Cedarwood Circle between Cedarwood Dr and Claybridge Dr has deep cracks all along that section of the street and requires repaving. This issue was reported previously and the case was closed without any repairs.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed.
The previous report has a note that this section of roadway is intended to be paved as part of the 2020 paving season.
City | Bloomington |
---|---|
State | IN |
Latitude | 39.130176544189 |
Longitude | -86.507057189941 |
Status | Case Date | Category |
---|