6/9/2020 14:46:25 Closed by Anonymous
The 8" pothole was hot patched on 6-9-20. Thank you for your Ureport.
Other: Road between 3rd and Atwater has 8" potholes.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
The 8" pothole was hot patched on 6-9-20. Thank you for your Ureport.
City | Bloomington |
---|---|
State | IN |
Latitude | 39.163890838623 |
Longitude | -86.520851135254 |
Status | Case Date | Category |
---|