7/20/2020 12:27:56 Closed by Matt Smethurst
Temporary repairs were made on July 16. Permanent repairs scheduled for week of July 27th.
Other: The summer road construction left the northbound lane of S. Henderson gravel with no pavement. This was a fine temporary solution, but the extended length of the lack of pavement has resulted in extremely rough and pitted roadway. Drivers are choosing to drive North in the Southbound lane instead and causing dangerous traffic situations. Can someone expedite either adding more compacted gravel or actually paving this piece of road? It is dangerous to drivers and their vehicles.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 4 days have already passed.
Temporary repairs were made on July 16. Permanent repairs scheduled for week of July 27th.
This is the second or third report of this. Can we get a timeframe from the contractor on when temporary or permanent repairs are expected?
This is an Engineering Project