After the work was done on South Lincoln, a temporary street patch was put in place. A street and sidewalk crew will be making the permanent repair on 9-29-2020.
Other: Utility crews cut into the road to install new water connection/meter. The patch of gravel they left behind was hastily and poorly covered with a thin layer of asphalt and is still filled with loose gravel. Cars are flinging gravel all over the street and the whole is getting larger by the day. Please address this soon, as it was a direct result of the city's actions and the poor work of city employees.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 1 days have already passed.
After the work was done on South Lincoln, a temporary street patch was put in place. A street and sidewalk crew will be making the permanent repair on 9-29-2020.