11/2/2020 08:34:29 Closed by Danna Workman
Waiting on location.
Other: At the construction site, there is a sharp drop from the pavement to where they are milling the road. On the other side of the work, there is a sharp edge going back to the regular pavement. I feel that the this situation can damage cars if the driver does not know to slow down. The edges of the construction is not very visible at night. I would like the city to install asphalt transitions from the regular pavement to where the road under construction is being milled. If nothing else, at least put warning signs at the transitions.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 4 days have already passed.
Waiting on location.
We need the location of the construction site.