11/5/2020 14:48:00 Closed by Anonymous
Hot patched 11-5-20
Other: Two potholes on N Staats drive on the eastside. Please patch as soon as possible. Thank you
Most tickets of this type should be closed within 7 days, although some cases may be longer. 7 days have already passed.
Hot patched 11-5-20