3/3/2021 15:38:09 Closed by Anonymous
Crews were out in this area cold patching 3-3-21
Other: Coming from the roundabout, on the right hand side at the intersection of Winslow and Xavier: pothole.
Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed.
Crews were out in this area cold patching 3-3-21